Line 57: Line 57:
  
 
= Other orders =
 
= Other orders =
 +
 +
{|
 +
|- style="background: gray"
 +
| product|| description || qty needed || qty ordered || ordered || confirmed || received
 +
|-
 +
| verlengkabel C12/C13 || div lengtes ||
 +
|-
 +
| tie wraps ||  ||
 +
|-
 +
| duct tape || plakked switches op trussen || 3x50m
 +
|-
 +
| gaffa tape || || 8x50m
 +
|-
 +
| voedingen access points || 12V DC ||
 +
|-
 +
| UTP cables || div lengtes || 55 + stands ||
 +
|-
 +
| conversie fibre || Eurofibre afmontage -> LC
 +
|}

Revision as of 12:10, 16 August 2010

Fibres

length needed order type ordered confirmed received
175m 3 4 rugged SM/LC-LC
80m 4 5 rugged SM/LC-LC
50m 3 4 rugged SM/LC-LC
25m 3 4 rugged SM/LC-LC
3m 14 15 regular SM/LC-LC

Fibre routes

Route A

Fibres departing from core: 3x175m + 1x80m

Switches: 18, 19, 20, plus one loose in graambeurszaal

To destination(s): via first floor to cellar, then via graanbeurszaal (leave 1x80m there), remaining threee continue to glazen zaal. In massageroom, leave 1 for glazen zaal, two continue to Yakultzaal voor, both go up to Yakult. Leave enough fibre for truss in Yakult to be raised!

Route B

Fibres departing from core: 2x80m + 1x50m

Switches: 15, 16, 17

To destination(s): to first floor to celler, then via beursfoyer. One goes up in beursfoyer, two continue to Yakult achter. Both go up there. Leave enough fibre for truss in Yakult to be raised!

Route C

Fibres departing from core: 3x25m

Switches: 6, 11, and EuroFiber uplink

To destiantion(s): up to first floor, then through cableduct in floor to server room (leave 1), and to patchpanel in room (2x)

Route D

Fibres departing from core: 1x80m + 1x50m

Switches: 12, 14

To destiantion(s): to second floor, then one goes over balcony to opposite side of beurszaal, and one goes via corridor to the balcony of the Berlagezaal.

Route E

Fibres departing from core: 1x50m

Switches: 13

To destiantion(s): to first floor, then to the truss in the beurszaal. Leave enough fibre for truss to be raised.

Other orders

product description qty needed qty ordered ordered confirmed received
verlengkabel C12/C13 div lengtes
tie wraps
duct tape plakked switches op trussen 3x50m
gaffa tape 8x50m
voedingen access points 12V DC
UTP cables div lengtes 55 + stands
conversie fibre Eurofibre afmontage -> LC