EGI Infra
Floor plans
All floor plans are available at http://www.nikhef.nl/grid/ndpf/files/Beurs-van-Berlage/
Fibres
length | needed | order | type | ordered | confirmed | received |
175m | 3 | 4 | rugged SM/LC-LC | |||
80m | 4 | 5 | rugged SM/LC-LC | |||
50m | 3 | 4 | rugged SM/LC-LC | |||
25m | 3 | 4 | rugged SM/LC-LC | |||
3m | 14 | 15 | regular SM/LC-LC |
Fibre routes
The fibre routes extend over 4 levels, according to the fibre route floor plan. Please follow the descriptions below and use the correct fibre length on each of the routes. All fibres are SM/LC-LC!
Route A
Fibres departing from core: 3x175m + 1x80m
Switches: 18, 19, 20, plus one loose in graambeurszaal
To destination(s): via first floor to cellar, then via graanbeurszaal (leave 1x80m there), remaining threee continue to glazen zaal. In massageroom, leave 1 for glazen zaal, two continue to Yakultzaal voor, both go up to Yakult. Leave enough fibre for truss in Yakult to be raised!
Route B
Fibres departing from core: 2x80m + 1x50m
Switches: 15, 16, 17
To destination(s): to first floor to celler, then via beursfoyer. One goes up in beursfoyer, two continue to Yakult achter. Both go up there. Leave enough fibre for truss in Yakult to be raised!
Route C
Fibres departing from core: 3x25m
Switches: 6, 11, and EuroFiber uplink
To destiantion(s): up to first floor, then through cableduct in floor to server room (leave 1), and to patchpanel in room (2x)
Route D
Fibres departing from core: 1x80m + 1x50m
Switches: 12, 14
To destiantion(s): to second floor, then one goes over balcony to opposite side of beurszaal, and one goes via corridor to the balcony of the Berlagezaal.
Route E
Fibres departing from core: 1x50m
Switches: 13
To destiantion(s): to first floor, then to the truss in the beurszaal. Leave enough fibre for truss to be raised.
Other orders
product | description | qty needed | qty ordered | ordered | confirmed | received |
verlengkabel C12/C13 | div lengtes | |||||
tie wraps | ||||||
duct tape | plakked switches op trussen | 3x50m | ||||
gaffa tape | 8x50m | |||||
voedingen access points | 12V DC | |||||
UTP cables | div lengtes | 55 + stands | ||||
conversie fibre | Eurofibre afmontage -> LC |