Fibres

length needed order type
175m 3 4 rugged SM/LC-LC
80m 4 5 rugged SM/LC-LC
50m 3 4 rugged SM/LC-LC
25m 3 4 rugged SM/LC-LC
3m 14 15 regular SM/LC-LC

Fibre routes

Route A

Fibres departing from core: 3x175m + 1x80m

Switches: 18, 19, 20, plus one loose in graambeurszaal

To destination(s): via first floor to cellar, then via graanbeurszaal (leave 1x80m there), remaining threee continue to glazen zaal. In massageroom, leave 1 for glazen zaal, two continue to Yakultzaal voor, both go up to Yakult. Leave enough fibre for truss in Yakult to be raised!

Route B

Fibres departing from core: 2x80m + 1x50m

Switches: 15, 16, 17

To destination(s): to first floor to celler, then via beursfoyer. One goes up in beursfoyer, two continue to Yakult achter. Both go up there. Leave enough fibre for truss in Yakult to be raised!

Route C

Fibres departing from core: 3x25m

Switches: 6, 11, and EuroFiber uplink

To destiantion(s): up to first floor, then through cableduct in floor to server room (leave 1), and to patchpanel in room (2x)

Route D

Fibres departing from core: 1x80m + 1x50m

Switches: 12, 14

To destiantion(s): to second floor, then one goes over balcony to opposite side of beurszaal, and one goes via corridor to the balcony of the Berlagezaal.

Route E

Fibres departing from core: 1x50m

Switches: 13