Difference between revisions of "EGI Infra"
m (→Route A) |
m (→Route A) |
||
Line 29: | Line 29: | ||
Switches: 18, 19, 20, plus new "21" one in graanbeurszaal on monday | Switches: 18, 19, 20, plus new "21" one in graanbeurszaal on monday | ||
− | To destination(s): via first floor to cellar, then via graanbeurszaal (leave 1x80m there), remaining | + | To destination(s): via first floor to cellar, then via graanbeurszaal (leave 1x80m there), remaining three continue. At mid-corridor, two go right via elevator and storage room to continue to Yakult front (leave enough fibre for truss to be raised!). At the mid-corridor, the remianing one continues to glazen zaal via massageroom and then up. |
== Route B == | == Route B == |
Revision as of 13:10, 20 August 2010
Floor plans
All floor plans are available at http://www.nikhef.nl/grid/ndpf/files/Beurs-van-Berlage/
Fibres
length | needed | order | type | ordered | confirmed | received |
175m | 3 | 4 | rugged SM/LC-LC | |||
80m | 4 | 5 | rugged SM/LC-LC | |||
50m | 3 | 4 | rugged SM/LC-LC | |||
25m | 3 | 4 | rugged SM/LC-LC | |||
3m | 14 | 15 | regular SM/LC-LC |
Fibre routes
The fibre routes extend over 4 levels, according to the fibre route floor plan. Please follow the descriptions below and use the correct fibre length on each of the routes. All fibres are SM/LC-LC!
Route A
Fibres departing from core: 3x175m + 1x80m
Switches: 18, 19, 20, plus new "21" one in graanbeurszaal on monday
To destination(s): via first floor to cellar, then via graanbeurszaal (leave 1x80m there), remaining three continue. At mid-corridor, two go right via elevator and storage room to continue to Yakult front (leave enough fibre for truss to be raised!). At the mid-corridor, the remianing one continues to glazen zaal via massageroom and then up.
Route B
Fibres departing from core: 2x80m + 1x50m
Switches: 15, 16, 17
To destination(s): to first floor to celler, then via beursfoyer. One goes up in beursfoyer, two continue to Yakult achter. Both go up there. Leave enough fibre for truss in Yakult to be raised!
Route C
Fibres departing from core: 3x25m
Switches: 6, 11, and EuroFiber uplink
To destiantion(s): up to first floor, then through cableduct in floor to server room (leave 1), and to patchpanel in room (2x)
Route D
Fibres departing from core: 1x80m + 1x50m
Switches: 12, 14
To destiantion(s): to second floor, then one goes over balcony to opposite side of beurszaal, and one goes via corridor to the balcony of the Berlagezaal.
Route E
Fibres departing from core: 1x50m
Switches: 13
To destiantion(s): to first floor, then to the truss in the beurszaal. Leave enough fibre for truss to be raised.
Other orders
product | description | qty needed | qty ordered | ordered | confirmed | received |
verlengkabel C12/C13 | div lengtes | |||||
tie wraps | ||||||
duct tape | plakked switches op trussen | 3x50m | ||||
gaffa tape | 8x50m | |||||
voedingen access points | 12V DC | |||||
UTP cables | div lengtes | 55 + stands | ||||
conversie fibre | Eurofibre afmontage -> LC |