Difference between revisions of "EGI Infra"

From PDP/Grid Wiki
Jump to navigationJump to search
Line 27: Line 27:
 
Fibres departing from core: 3x175m + 1x80m
 
Fibres departing from core: 3x175m + 1x80m
  
Switches: 18, 19, 20, plus one loose in graambeurszaal
+
Switches: 18, 19, 20, plus new "21" one in graanbeurszaal on monday
  
 
To destination(s): via first floor to cellar, then via graanbeurszaal (leave 1x80m there), remaining threee continue to glazen zaal. In massageroom, leave 1 for glazen zaal, two continue to Yakultzaal voor, both go up to Yakult. Leave enough fibre for truss in Yakult to be raised!
 
To destination(s): via first floor to cellar, then via graanbeurszaal (leave 1x80m there), remaining threee continue to glazen zaal. In massageroom, leave 1 for glazen zaal, two continue to Yakultzaal voor, both go up to Yakult. Leave enough fibre for truss in Yakult to be raised!

Revision as of 13:03, 20 August 2010

Floor plans

All floor plans are available at http://www.nikhef.nl/grid/ndpf/files/Beurs-van-Berlage/

Fibres

length needed order type ordered confirmed received
175m 3 4 rugged SM/LC-LC
80m 4 5 rugged SM/LC-LC
50m 3 4 rugged SM/LC-LC
25m 3 4 rugged SM/LC-LC
3m 14 15 regular SM/LC-LC

Fibre routes

The fibre routes extend over 4 levels, according to the fibre route floor plan. Please follow the descriptions below and use the correct fibre length on each of the routes. All fibres are SM/LC-LC!

Route A

Fibres departing from core: 3x175m + 1x80m

Switches: 18, 19, 20, plus new "21" one in graanbeurszaal on monday

To destination(s): via first floor to cellar, then via graanbeurszaal (leave 1x80m there), remaining threee continue to glazen zaal. In massageroom, leave 1 for glazen zaal, two continue to Yakultzaal voor, both go up to Yakult. Leave enough fibre for truss in Yakult to be raised!

Route B

Fibres departing from core: 2x80m + 1x50m

Switches: 15, 16, 17

To destination(s): to first floor to celler, then via beursfoyer. One goes up in beursfoyer, two continue to Yakult achter. Both go up there. Leave enough fibre for truss in Yakult to be raised!

Route C

Fibres departing from core: 3x25m

Switches: 6, 11, and EuroFiber uplink

To destiantion(s): up to first floor, then through cableduct in floor to server room (leave 1), and to patchpanel in room (2x)

Route D

Fibres departing from core: 1x80m + 1x50m

Switches: 12, 14

To destiantion(s): to second floor, then one goes over balcony to opposite side of beurszaal, and one goes via corridor to the balcony of the Berlagezaal.

Route E

Fibres departing from core: 1x50m

Switches: 13

To destiantion(s): to first floor, then to the truss in the beurszaal. Leave enough fibre for truss to be raised.

Other orders

product description qty needed qty ordered ordered confirmed received
verlengkabel C12/C13 div lengtes
tie wraps
duct tape plakked switches op trussen 3x50m
gaffa tape 8x50m
voedingen access points 12V DC
UTP cables div lengtes 55 + stands
conversie fibre Eurofibre afmontage -> LC