Difference between revisions of "PDP"

From PDP/Grid Wiki
Jump to navigationJump to search
(Created page with " == PDP projects == ; Guidelines : general guidelines for documentation associated with starting, running, and ending projects")
 
Line 1: Line 1:
  
 
== PDP projects ==
 
== PDP projects ==
 +
 +
A project means, in the context of these pages, any activity that consumes a significant amount of resources.  A trial definition for significant:
 +
----
 +
Resource consumption is significant enough to warrant tracking as a project, whenever the tracking overhead drops below 10%.  Assume for the moment an overhead of 1 hour for the start memo, 2 hours for the quarterly status memo, and 4 fours for the final report.  For a project lasting less than three months in calendar time, the threshold is then 50 hours; for a project lasting more than three months, the threshold is 70 hours.
 +
----
 +
Hours above are real hours spent working on the project.  These definitions should be evaluated for usefulness as we acquire experience.  The start memo is also relevant to expenses; if we apply the same rule, the threshold is anything costing more than 625 euros (standard figure for personnel 100k / yr = 62,5 euro/hr which is 10% of 625 euros).
  
 
; [[Guidelines]] : general guidelines for documentation associated with starting, running, and ending projects
 
; [[Guidelines]] : general guidelines for documentation associated with starting, running, and ending projects

Revision as of 13:48, 11 November 2015

PDP projects

A project means, in the context of these pages, any activity that consumes a significant amount of resources. A trial definition for significant:


Resource consumption is significant enough to warrant tracking as a project, whenever the tracking overhead drops below 10%. Assume for the moment an overhead of 1 hour for the start memo, 2 hours for the quarterly status memo, and 4 fours for the final report. For a project lasting less than three months in calendar time, the threshold is then 50 hours; for a project lasting more than three months, the threshold is 70 hours.


Hours above are real hours spent working on the project. These definitions should be evaluated for usefulness as we acquire experience. The start memo is also relevant to expenses; if we apply the same rule, the threshold is anything costing more than 625 euros (standard figure for personnel 100k / yr = 62,5 euro/hr which is 10% of 625 euros).

Guidelines
general guidelines for documentation associated with starting, running, and ending projects