ITk Endcap At Nikhef

From Atlas Wiki
Revision as of 12:21, 13 January 2025 by Aalonso@nikhef.nl (talk | contribs) (→‎- Inner ring measurements: - summarise)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Back to ITk Endcap Homepage


Contents author: Andrea García Alonso (aalonso@nikhef.nl)

The construction of the ITk Strip End-caps at Nikhef. This page contains quality control QC and quality assurance QA tests done over each of the EC structure individual components and the final global structure.

EC1 structure on 25/05/2023

Wheels

- Wheel conduction after assembly

By Geoffrey Gilles:

The conduction of the wheels was tested after their assembly. The main goal of these measurements was to inspect whether the electrical conductivity was properly preserved over the entire wheel structure. The minimum resistance was measured at 3 ring-to-blade connections.

Results of these measurements available here.

A downloadable spreadsheet version of these results can also be found here.

- Wheel and Blade production documentation & characterisation

By Erno Roeland:

For an overview of the naming conventions used for the wheels, blades, inner rings and outer rings, click here: 2022_06_01_WheelOverview.xlsx.

For the most recent spreadsheet containing the blade and rim production overview and database status, see 2022_05_24_Blades_and_Rims.xlsx.

- Wheel locking point measurements

Information on the positioning of the locking points on each of the wheels available here (nikhef, nikhef): https://www.nikhef.nl/~dyvanar/ITKproject/html/subpages/wheel_lockingpoint_measurements.html

- Wheel QA/QC

The wheel QA/QC document is available here (last version, dated 21/03/2022, pdf format). It contains information on a set of QA/QC tests, including petal fit tests and wheel & stiffener disk sag measurements.

- Inner ring measurements

By Brian Moser:

Contents of the inner ring measurement cernbox: See also the README. The cernbox (here) contains a folder on Circularity, Bending, Angle and Width measurements.

Inner rim measurement presentation: here and summary presentation: here.



Stiffening disk

One of the thermal deformation tests on one of the stiffening disks. Picture of 21-01-2022

The stiffening disks of the End-caps, made of Ultem foam with a carbon-fiber face-sheet, were produced and tested at Nikhef. The stiffening disks provide structural stiffness to the EC and act as a thermal barrier. To certify that the three manufactured stiffening disks comply with the specifications, an ATLAS internal note was written to explain the thermal deformation tests carried out at Nikhef, at the end of 2021 and the beginning of 2022. Although it is quite difficult to measure small thermal deformations on such big structures, three tests were performed: temperature changes, local temperature gradients, and global temperature gradients. The results show that the deformations in two disks are consistent with the specifications. The remaining disk is chosen as spare since it deforms above expected, although still mechanically acceptable.


File:ATL-COM-ITK-2022-064.pdf You can find the ATLAS internal note called "Temperature deformation tests of the ITk strip end-cap stiffening disks produced at Nikhef" here: https://cds.cern.ch/record/2824857. In case you don't have access, please contact Andrea García Alonso.

Stiffening Disk




Cooling manifolds

The ITk strip End-cap detector consists of 6 wheels that each accommodate 32 petals. The petals are cooled with a 2-phase CO2 system using cooling service modules that serve 16 petals, corresponding to half a wheel.

Cooling manifold
Status on 1st June 2023:

Disk 0 manifolds fabrication is not finished

All manifolds for disk 1 and disk 2 are fabricated, the As and Bs for disk 3 are fabricated as well. Disk 2, outlet manifolds A, B, C and D are cleaned by 31st May 2023.

Manifolds production status on 06/06/2023
Summer 2023: Pressure tests + leak tests + alcohol flushing

Every manifold is tested at a high pressure (170 bar) and a check for leaks is performed using Helium. Afterwards, every manifold is internally cleaned with alcohol to assure that no small particles could eventually block the capillarities to which the manifold will be connected.

Test reports and status available here:

cernbox.cern.ch/files/spaces/eos/user/m/marcelv/ITK-map/Production/Results/Sub_Assembly/Pressure_test_SA

Status of the inlet and outlet manifolds for EC1 (A-B) and EC2 (C-D)
Inlet

manifold

Produced Preassure

tested

Leak

tested

Alcohol

flushed

Ready for

installation

Outlet

manifold

Produced Preassure

tested

Leak

tested

Alcohol

flushed

Ready for

installation

Disk 0 - A YES Disk 0 - A YES
Disk 0 - B YES Disk 0 - B YES
Disk 0 - C YES Disk 0 - C YES
Disk 0 - D YES Disk 0 - D YES
Disk 1 - A YES Disk 1 - A YES
Disk 1 - B YES Disk 1 - B YES
Disk 1 - C YES Disk 1 - C YES
Disk 1 - D YES Disk 1 - D YES
Disk 2 - A YES Disk 2 - A YES
Disk 2 - B YES Disk 2 - B YES
Disk 2 - C YES Disk 2 - C YES
Disk 2 - D YES Disk 2 - D YES
Disk 3 - A YES Disk 3 - A YES
Disk 3 - B YES Disk 3 - B YES
Disk 3 - C YES Disk 3 - C YES
Disk 3 - D YES Disk 3 - D YES
Disk 4 - A YES Disk 4 - A YES
Disk 4 - B YES Disk 4 - B YES
Disk 4 - C YES Disk 4 - C YES
Disk 4 - D YES Disk 4 - D YES
Disk 5 - A YES Disk 5 - A YES
Disk 5 - B YES Disk 5 - B YES
Disk 5 - C YES Disk 5 - C YES
Disk 5 - D YES Disk 5 - D YES


PP1 patch panel

PP1 Patch Panel

Plan for QA/QC during 2024

-  Tcycle a piece between +40, -35 (or reasonably low) in a dry-air or N2 bag. 

- Measure ohmic R with voltmeter on ~10 places randomly.

- Measure R between all inserts and surface. R<10 Ohm, otherwise we probably need to fix. (or are all inserts grounded anyway via their bolts).



End-cap structure

- Wheel and manifold installation - Positions on ECs and numbering

The produced wheels have been installed in the two end-caps as shown in the table. "EC wheel position" refers to the physical level on the EC, where 0 is the top (closest to Interaction Point IP) and 5 is the bottom (furthest from IP). "Erno number" is the identifier that was given at Nikhef to individual wheels. "Dutch-shape number" is the identifier given by the company that milled the locking points. Wheels with Erno number 1 and 14 don't belong to any EC (spare).

The inlet and outlet cooling manifolds are installed in the EC and are referred on the 4th column of the table. The pair inlet-outlet is matched according to their numbers, a.k.a. inlet manifold 1A and outlet manifold 1A are placed together, with their VCR connectors at the same location. Cooling manifolds installed close to the beam that has a corner pointing to the right (when EC standing on BH) are identified in the table as "@R beam", while those manifolds close to the beam with the corner pointing left are labeled "@L beam". Manifolds on wheel #0 will be taken away for transport to DESY, so they will have to install them again and if they follow the pattern of the rest of manifolds they will place them so all the As are together and all the Bs as well (not as it is at the moment, June 2024).

Final EC-A with Left Beam marked with arrow
End-cap wheel

position

Erno

number

Dutch-shape

number

Cooling manifolds
@R beam @L beam
End-cap A - Wheel#0 11 19056-13-A7 0A 0B
End-cap A - Wheel#1 2 19056-15-B2 1B 1A
End-cap A - Wheel#2 9 19056-13-A3 2B 2A
End-cap A - Wheel#3 13 19056-15-b6 3B 3A
End-cap A - Wheel#4 7 19056-13-A2 4B 4A
End-cap A - Wheel#5 12 19056-15-B5 5B 5A
     
End-cap C - Wheel#0 6 19056-13-A1
End-cap C - Wheel#1 4 19056-15-B3
End-cap C - Wheel#2 10 19056-13-A4
End-cap C - Wheel#3 5 19056-15-B4
End-cap C - Wheel#4 8 19056-13-A6
End-cap C - Wheel#5 3 19056-13-A5

- Wheel installation - Distances between wheel rim and lower petals

One of the QC tests in a full EC structure consists on checking the actual distances that the locking points leave between the petals and the wheel rims.


EC-A with Test petal

File:Lower petal-wheel rim distance EC-A.pdf

For EC-A, these are the results from the measurements of the distance between the wheel rim and the lower petal. They are also available in the wheel entries in the ITk Production database. The purpose was to check if there's enough space for the RF box. The test was done using the measurement petal, and placing it on the lowest locking points. Each measurement was performed next to a spacer rod. Important to take into account that the locking points closer to the inner cylinder might be a bit shorter than the ones on the wheel rim (sometimes the actual height would be probably 0.5mm smaller than measured).


File:Lower petal-wheel rim distance EC-C.pdf

Due to sensor cracking, one of the potential case scenarios is that the petals will get an extra layer of material, resulting in a larger petal thickness. This could be problematic if there is not enough space between the lower petals and the wheel rims in the already built EC structures (A and C). EC-A was already measured when the RF box issue was addressed, but now EC-C as well.

- EC geometric measurement - Stiffness

A load of a hundred kilograms was placed inside the EC inner cylinder to mimic the operational conditions. Several 3D laser measurements indicated that the EC structures have a high stiffness leading to only 20 to 60 µm effects when loaded.

Test summary presented in the ITk week March 2024: https://indico.cern.ch/event/1353986/contributions/5865828/attachments/2822702/4929833/EC%20GEOMETRIC%20MEASUREMENT%20-%20ATLAS%20ITk%20Week%20180324.pdf

- Characterization of mechanical behaviour EC structure at cold temperatures

EC structure temperature studies



Other EC structure related topics

Petal test box

Cleanroom at Nikhef

Click here for the Nikhef cleanroom document (pdf).

Miscellaneous documents