Difference between revisions of "ITk Endcap At Nikhef"

From Atlas Wiki
Jump to navigation Jump to search
(→‎Cooling manifolds: added table for tracking manifolds' status)
(add column to the manifold table)
Line 50: Line 50:
 
|+
 
|+
 
!Outlet Manifold
 
!Outlet Manifold
 +
!Fabricated
 
!Alcohol flushing cleaning
 
!Alcohol flushing cleaning
 
!Preassure test
 
!Preassure test
 
!
 
!
 +
!Fabricated
 
!Inlet manifold
 
!Inlet manifold
 
!Alcohol flushing cleaning
 
!Alcohol flushing cleaning
Line 58: Line 60:
 
|-
 
|-
 
|Disk 0 - A
 
|Disk 0 - A
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 66: Line 70:
 
|-
 
|-
 
|Disk 0 - B
 
|Disk 0 - B
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 74: Line 80:
 
|-
 
|-
 
|Disk 0 - C
 
|Disk 0 - C
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 82: Line 90:
 
|-
 
|-
 
|Disk 0 - D
 
|Disk 0 - D
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 90: Line 100:
 
|-
 
|-
 
|Disk 1 - A
 
|Disk 1 - A
 +
|YES
 
|
 
|
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 98: Line 110:
 
|-
 
|-
 
|Disk 1 - B
 
|Disk 1 - B
 +
|YES
 
|
 
|
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 106: Line 120:
 
|-
 
|-
 
|Disk 1 - C
 
|Disk 1 - C
 +
|YES
 
|
 
|
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 114: Line 130:
 
|-
 
|-
 
|Disk 1 - D
 
|Disk 1 - D
 +
|YES
 
|
 
|
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 122: Line 140:
 
|-
 
|-
 
|Disk 2 - A
 
|Disk 2 - A
 +
|YES
 
|DONE
 
|DONE
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 130: Line 150:
 
|-
 
|-
 
|Disk 2 - B
 
|Disk 2 - B
 +
|YES
 
|DONE
 
|DONE
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 138: Line 160:
 
|-
 
|-
 
|Disk 2 - C
 
|Disk 2 - C
 +
|YES
 
|DONE
 
|DONE
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 146: Line 170:
 
|-
 
|-
 
|Disk 2 - D
 
|Disk 2 - D
 +
|YES
 
|DONE
 
|DONE
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 154: Line 180:
 
|-
 
|-
 
|Disk 3 - A
 
|Disk 3 - A
 +
|YES
 
|
 
|
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 162: Line 190:
 
|-
 
|-
 
|Disk 3 - B
 
|Disk 3 - B
 +
|YES
 
|
 
|
 
|
 
|
 
|
 
|
 +
|YES
 
|
 
|
 
|
 
|
Line 170: Line 200:
 
|-
 
|-
 
|Disk 3 - C
 
|Disk 3 - C
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 178: Line 210:
 
|-
 
|-
 
|Disk 3 - D
 
|Disk 3 - D
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 186: Line 220:
 
|-
 
|-
 
|Disk 4 - A
 
|Disk 4 - A
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 194: Line 230:
 
|-
 
|-
 
|Disk 4 - B
 
|Disk 4 - B
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 202: Line 240:
 
|-
 
|-
 
|Disk 4 - C
 
|Disk 4 - C
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 210: Line 250:
 
|-
 
|-
 
|Disk 4 - D
 
|Disk 4 - D
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 218: Line 260:
 
|-
 
|-
 
|Disk 5 - A
 
|Disk 5 - A
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 226: Line 270:
 
|-
 
|-
 
|Disk 5 - B
 
|Disk 5 - B
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 234: Line 280:
 
|-
 
|-
 
|Disk 5 - C
 
|Disk 5 - C
 +
|
 +
|
 
|
 
|
 
|
 
|
Line 242: Line 290:
 
|-
 
|-
 
|Disk 5 - D
 
|Disk 5 - D
 +
|
 +
|
 
|
 
|
 
|
 
|

Revision as of 11:58, 8 June 2023

Back to ITk Endcap Homepage

This page is meant to document all available information related to the construction of the Endcap at Nikhef.

Wheel production

Wheel conduction after assembly

Wheel Conduction

Wheel and Blade production documentation & characterisation

Wheel and Blade production documentation & characterisation

Wheel locking point measurements

Wheel locking point measurements

Wheel QA/QC

Wheel QA/QC

Inner ring measurements

Inner Ring measurements


Endcap structure

Characterization of mechanical behaviour EC structure at cold temperatures

EC structure temperature studies

Stiffener disk measurements

Stiffener disk thermal deformation tests on 21-01-2022.jpg

Stiffener Disk

PP1-patch panel

PP1 Patch Panel

Cooling manifolds

Disk 0 manifolds fabrication is not finished

All manifolds for disk 1 and disk 2 are fabricated, the As and Bs for disk 3 are fabricated as well. Disk 2, outlet manifolds A, B, C and D are cleaned by 31st May 2023.

Manifolds status 06-06-2023.jpg

Working schedule of Pranati and Ali:

- Thursday 15th: first pair of inlet manifolds, aka disk 2 inlet manifolds A and B. Then all EC1 disk 2 manifolds would be ready. And change to disk 1 inlet manifolds A and B.

- Friday 16th: move on to disk 1 outlet manifolds A and B. Then all EC1 disk 1 manifolds would be ready. And continue with disk 3 outlet manifolds A and B.

- Thursday 22nd: finish with disk 3: disk 3 inlet manifolds A and B. Then all EC1 disk 3 manifolds would be ready.

- Monday 26th: if previous days' objectives were not achieved, day to wrap things up (or do more A-B manifolds if they get ready by then). Also, Andrea García starts the pressure tests with disk 1 inlet manifolds.

Outlet Manifold Fabricated Alcohol flushing cleaning Preassure test Fabricated Inlet manifold Alcohol flushing cleaning Preassure test
Disk 0 - A
Disk 0 - B
Disk 0 - C
Disk 0 - D
Disk 1 - A YES YES
Disk 1 - B YES YES
Disk 1 - C YES YES
Disk 1 - D YES YES
Disk 2 - A YES DONE YES
Disk 2 - B YES DONE YES
Disk 2 - C YES DONE YES
Disk 2 - D YES DONE YES
Disk 3 - A YES YES
Disk 3 - B YES YES
Disk 3 - C
Disk 3 - D
Disk 4 - A
Disk 4 - B
Disk 4 - C
Disk 4 - D
Disk 5 - A
Disk 5 - B
Disk 5 - C
Disk 5 - D

Cleanroom Nikhef

Cleanroom

Miscellaneous documents