− | + | The construction of the ITk Strip End-caps is done at Nikhef. On this page, you will find the information related to that process. | |
+ | |||
+ | Author: Andrea García Alonso | ||
==Wheel production== | ==Wheel production== | ||
Line 21: | Line 23: | ||
− | == | + | ==End-cap structure== |
− | ===Characterization of mechanical behaviour EC structure at cold temperatures=== | + | ===- Characterization of mechanical behaviour EC structure at cold temperatures=== |
[http://wiki.nikhef.nl/atlas/ITk_Endcap_Structure_TemperatureStudies EC structure temperature studies] | [http://wiki.nikhef.nl/atlas/ITk_Endcap_Structure_TemperatureStudies EC structure temperature studies] | ||
− | ===Stiffener disk measurements=== | + | ===- Stiffener disk measurements=== |
− | [[File:Stiffener disk thermal deformation tests on 21-01-2022.jpg|none|thumb]] | + | The stiffening disks of the End-caps, made of Ultem foam with a carbon-fiber face-sheet, were produced and tested at Nikhef. The stiffening disks provide structural stiffness to the EC and act as a thermal barrier. To certify that the three manufactured stiffening disks comply with the specifications, an ATLAS internal note was written to explain the thermal deformation tests carried out at Nikhef, at the end of 2021 and the beginning of 2022. Although it is quite difficult to measure small thermal deformations on such big structures, three tests were performed: temperature changes, local temperature gradients, and global temperature gradients. The results show that the deformations in two disks are consistent with the specifications. The remaining disk is chosen as spare since it deforms above expected, although still mechanically acceptable. |
+ | |||
+ | You can find the ATLAS internal note here: https://cds.cern.ch/record/2824857?. In case you don't have access, please contact Andrea García Alonso.[[File:Stiffener disk thermal deformation tests on 21-01-2022.jpg|none|thumb|alt=|400x400px|One of the thermal deformation tests on one of the stiffener disks. Picture of 21-01-2022]] | ||
[http://wiki.nikhef.nl/atlas/ITk_Endcap_StiffenerDisk Stiffener Disk] | [http://wiki.nikhef.nl/atlas/ITk_Endcap_StiffenerDisk Stiffener Disk] | ||
− | ===PP1 | + | ===- PP1 patch panel=== |
[http://wiki.nikhef.nl/atlas/ITk_Endcap_PP1_PatchPanel PP1 Patch Panel] | [http://wiki.nikhef.nl/atlas/ITk_Endcap_PP1_PatchPanel PP1 Patch Panel] | ||
− | === Cooling manifolds === | + | === - Cooling manifolds === |
Disk 0 manifolds fabrication is not finished | Disk 0 manifolds fabrication is not finished | ||
All manifolds for disk 1 and disk 2 are fabricated, the As and Bs for disk 3 are fabricated as well. Disk 2, outlet manifolds A, B, C and D are cleaned by 31st May 2023. | All manifolds for disk 1 and disk 2 are fabricated, the As and Bs for disk 3 are fabricated as well. Disk 2, outlet manifolds A, B, C and D are cleaned by 31st May 2023. | ||
− | [[File: | + | [[File:Manifolds_status_06-06-2023.jpg|alt=|none|thumb|500x500px|Manifolds production status on 06/06/2023]] |
Working schedule of Pranati and Ali: | Working schedule of Pranati and Ali: | ||
Line 47: | Line 51: | ||
- Monday 26th: if previous days' objectives were not achieved, day to wrap things up (or do more A-B manifolds if they get ready by then). Also, Andrea García starts the '''pressure tests''' with disk 1 inlet manifolds. | - Monday 26th: if previous days' objectives were not achieved, day to wrap things up (or do more A-B manifolds if they get ready by then). Also, Andrea García starts the '''pressure tests''' with disk 1 inlet manifolds. | ||
+ | |||
+ | In July, Osama continues with the manifolds of EC2. | ||
{| class="wikitable" | {| class="wikitable" | ||
|+Status of the inlet and outlet manifolds for EC1 (A-B) and EC2 (C-D) | |+Status of the inlet and outlet manifolds for EC1 (A-B) and EC2 (C-D) | ||
Line 300: | Line 306: | ||
|} | |} | ||
− | ==Cleanroom Nikhef== | + | ==Cleanroom at Nikhef== |
[http://wiki.nikhef.nl/atlas/ITk_Endcap_Cleanroom Cleanroom] | [http://wiki.nikhef.nl/atlas/ITk_Endcap_Cleanroom Cleanroom] | ||
Revision as of 13:48, 8 June 2023
The construction of the ITk Strip End-caps is done at Nikhef. On this page, you will find the information related to that process.
Author: Andrea García Alonso
Wheel production
Wheel conduction after assembly
Wheel and Blade production documentation & characterisation
Wheel and Blade production documentation & characterisation
Wheel locking point measurements
Wheel locking point measurements
Wheel QA/QC
Inner ring measurements
End-cap structure
- Characterization of mechanical behaviour EC structure at cold temperatures
EC structure temperature studies
- Stiffener disk measurements
The stiffening disks of the End-caps, made of Ultem foam with a carbon-fiber face-sheet, were produced and tested at Nikhef. The stiffening disks provide structural stiffness to the EC and act as a thermal barrier. To certify that the three manufactured stiffening disks comply with the specifications, an ATLAS internal note was written to explain the thermal deformation tests carried out at Nikhef, at the end of 2021 and the beginning of 2022. Although it is quite difficult to measure small thermal deformations on such big structures, three tests were performed: temperature changes, local temperature gradients, and global temperature gradients. The results show that the deformations in two disks are consistent with the specifications. The remaining disk is chosen as spare since it deforms above expected, although still mechanically acceptable.
You can find the ATLAS internal note here: https://cds.cern.ch/record/2824857?. In case you don't have access, please contact Andrea García Alonso.
- PP1 patch panel
- Cooling manifolds
Disk 0 manifolds fabrication is not finished
All manifolds for disk 1 and disk 2 are fabricated, the As and Bs for disk 3 are fabricated as well. Disk 2, outlet manifolds A, B, C and D are cleaned by 31st May 2023.
Working schedule of Pranati and Ali:
- Thursday 15th: first pair of inlet manifolds, aka disk 2 inlet manifolds A and B. Then all EC1 disk 2 manifolds would be ready. And change to disk 1 inlet manifolds A and B.
- Friday 16th: move on to disk 1 outlet manifolds A and B. Then all EC1 disk 1 manifolds would be ready. And continue with disk 3 outlet manifolds A and B.
- Thursday 22nd: finish with disk 3: disk 3 inlet manifolds A and B. Then all EC1 disk 3 manifolds would be ready.
- Monday 26th: if previous days' objectives were not achieved, day to wrap things up (or do more A-B manifolds if they get ready by then). Also, Andrea García starts the pressure tests with disk 1 inlet manifolds.
In July, Osama continues with the manifolds of EC2.
Outlet Manifold | Fabricated | Alcohol flushing cleaning | Preassure test | Inlet manifold | Fabricated | Alcohol flushing cleaning | Preassure test | |
---|---|---|---|---|---|---|---|---|
Disk 0 - A | Disk 0 - A | |||||||
Disk 0 - B | Disk 0 - B | |||||||
Disk 0 - C | Disk 0 - C | |||||||
Disk 0 - D | Disk 0 - D | |||||||
Disk 1 - A | YES | Disk 1 - A | YES | |||||
Disk 1 - B | YES | Disk 1 - B | YES | |||||
Disk 1 - C | YES | Disk 1 - C | YES | |||||
Disk 1 - D | YES | Disk 1 - D | YES | |||||
Disk 2 - A | YES | DONE - 25/05/2023 | Disk 2 - A | YES | ||||
Disk 2 - B | YES | DONE - 25/05/2023 | Disk 2 - B | YES | ||||
Disk 2 - C | YES | DONE - 31/05/2023 | Disk 2 - C | YES | ||||
Disk 2 - D | YES | DONE - 31/05/2023 | Disk 2 - D | YES | ||||
Disk 3 - A | YES | Disk 3 - A | YES | |||||
Disk 3 - B | YES | Disk 3 - B | YES | |||||
Disk 3 - C | Disk 3 - C | |||||||
Disk 3 - D | Disk 3 - D | |||||||
Disk 4 - A | Disk 4 - A | |||||||
Disk 4 - B | Disk 4 - B | |||||||
Disk 4 - C | Disk 4 - C | |||||||
Disk 4 - D | Disk 4 - D | |||||||
Disk 5 - A | Disk 5 - A | |||||||
Disk 5 - B | Disk 5 - B | |||||||
Disk 5 - C | Disk 5 - C | |||||||
Disk 5 - D | Disk 5 - D |
Cleanroom at Nikhef
Miscellaneous documents
- Click here for the request regarding temporary connectors (pdf).
- ITk pictures by Jesse van Dongen
- EC mockup fb2020