Difference between revisions of "ITk Endcap Wheel Conduction"
Jump to navigation
Jump to search
m |
|||
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
By Geoffrey Gilles: | By Geoffrey Gilles: | ||
− | The conduction of the wheels was tested after their assembly. The main goal of these measurements was too inspect whether the electrical conductivity was properly preserved over the entire wheel structure. In order to do this, the minimum resistance was measured at 3 ring-to-blade connection. Click [https://www.nikhef.nl/~ggilles/ITk_QC/index.html here] to view the results of these measurements. A downloadable spreadsheet version of these results can also be found here. | + | The conduction of the wheels was tested after their assembly. The main goal of these measurements was too inspect whether the electrical conductivity was properly preserved over the entire wheel structure. In order to do this, the minimum resistance was measured at 3 ring-to-blade connection. Click [https://www.nikhef.nl/~ggilles/ITk_QC/index.html here] to view the results of these measurements. A downloadable spreadsheet version of these results can also be found [https://www.nikhef.nl/pub/experiments/atlas/ITk/data/geoffrey/wheel_production.xlsx here]. |
+ | |||
+ | |||
+ | <br> | ||
+ | ===== Navigate back ===== | ||
+ | ''[https://wiki.nikhef.nl/atlas/ITk_Endcap_Homepage Back to ITk Endcap Homepage]'' | ||
+ | |||
+ | ''[https://wiki.nikhef.nl/atlas/ITk_Endcap_At_Nikhef Back to ITk Endcap At Nikhef]'' |
Latest revision as of 14:56, 2 February 2023
By Geoffrey Gilles:
The conduction of the wheels was tested after their assembly. The main goal of these measurements was too inspect whether the electrical conductivity was properly preserved over the entire wheel structure. In order to do this, the minimum resistance was measured at 3 ring-to-blade connection. Click here to view the results of these measurements. A downloadable spreadsheet version of these results can also be found here.