== Vacuum ==
 
== Vacuum ==
  
* answer questions of and perform discussions with the CERN vacuum
+
* answer questions of and perform discussions with the CERN vacuum group about the new vacuum control system (Rodrigo Ferreira, Giuseppe Bregliozzi, Paulo Gomes, Henrik Vestergard)
  group about the new vacuum control system (Rodrigo Ferreira,
 
  Giuseppe Bregliozzi, Paulo Gomes, Henrik Vestergard)
 
 
* maintain SmsVacTool script and start it in Neon periods
 
* maintain SmsVacTool script and start it in Neon periods
 
* check APDP in Neon periods
 
* check APDP in Neon periods
* change status to ready for beam to ECS after interventions by
+
* change status to ready for beam to ECS after interventions by the CERN vacuum group
  the CERN vacuum group
 
 
 
  
 
== Motion ==
 
== Motion ==

Revision as of 09:49, 15 December 2016


Vacuum

  • answer questions of and perform discussions with the CERN vacuum group about the new vacuum control system (Rodrigo Ferreira, Giuseppe Bregliozzi, Paulo Gomes, Henrik Vestergard)
  • maintain SmsVacTool script and start it in Neon periods
  • check APDP in Neon periods
  • change status to ready for beam to ECS after interventions by the CERN vacuum group

Motion

  • perform potmeter calibration: WinCC-panel, data-analysis, upload results to motion-PLC
  • discussions with CERN PH-DT group on the new motion control system (Giovanna Lehmann, Xavier Pons and Sylvain Ravat; ([[1][meeting])
  • put detectors in place after Neon periods


Cooling

  • be able to put CO2-pumps under gas (e.g. for pump maintenance)
  • theory and practice: sub-cooling on input of pump (?), control
 PLC-screen, make and interprete trend plots, superheated CO2 (?),
 preheaters, SMS tool
  • special plots for TL-pump (??)
  • check long-term behaviour of system, e.g. to reduce risks of thermal runaway
  • maintain alarm levels in the alert system (PLC?)
  • be standby 365, 24/5 to react when system switches to backup, or
 if anything else goes wrong
  • maintain telephone numbers in PLC sms tool
  • lend assistance to Seicar for chiller maintaince
  • put system in correct state before/after Neon (setpoints, interlock?)
  • keep track of TinyTags data and dry air flow
  • order spare parts and coordinate maintenance and repair


VMC (?)

  • check UPS systems and maintain spares (?)
  • maintain email lists of UPS systems (?)
  • check VMC system after yearly AUG and diesel tests (?)
  • update interlock settings before/after Neon period
  • take care of storage in Bld 169
  • maintain manuals pages in VELO-twiki and EDMS documents
  • participate in VELO run meeting on Tuesday morning


Velo upgrade

  • co-coordination of WP5: keep track of anything that relates to
 modules such as sensors, readout, data tapes, markers, LV- and
 HV-cables, components (substrates, hybrids, ...)
  • participate in module-0 meeting on Tuesday
  • take care of wafer and glass parts in clean room storage