Difference between revisions of "Upgrade/VeloModules"

From LHCb Wiki
Jump to navigation Jump to search
Line 22: Line 22:
  
 
1. quick electrical test ("20 seconds"), mainly to check that wirebonds are ok. This test should take place in the clean-room. For this we need:
 
1. quick electrical test ("20 seconds"), mainly to check that wirebonds are ok. This test should take place in the clean-room. For this we need:
** LV (incl. PC for controls?)
+
* LV (incl. PC for controls?)
** DAQ
+
* DAQ
** fibres to connect to DAQ
+
* fibres to connect to DAQ
** database to summarize results
+
* database to summarize results
  
 
2. burn-in test ("24 hours"). For this we need:
 
2. burn-in test ("24 hours"). For this we need:
** LV  
+
* LV  
** HV (till 1000V; must have precise current control/monitor )
+
* HV (till 1000V; must have precise current control/monitor )
** PC with PVSS to control LV and HV
+
* PC with PVSS to control LV and HV
** DAQ
+
* DAQ
** fibres to connect to DAQ
+
* fibres to connect to DAQ
** PC to run data analysis (needs to happen in real time as data volumes are very large)
+
* PC to run data analysis (needs to happen in real time as data volumes are very large)
** database to summarize results
+
* database to summarize results
** a 19 inch rack  
+
* a 19 inch rack  
** CO2 cooling
+
* CO2 cooling
** vacuum tank
+
* vacuum tank
** if not in the cleanroom, a 'tent' to protect setup
+
* if not in the cleanroom, a 'tent' to protect setup
  
 
Rough schedule:
 
Rough schedule:

Revision as of 07:34, 22 September 2016

Under construction


Communication

Documentation

  • project plans: 2016
  • timeline (gantt chart): 2016

Setup for module production QA (last update 21/9/2016)

There are two tests:

1. quick electrical test ("20 seconds"), mainly to check that wirebonds are ok. This test should take place in the clean-room. For this we need:

  • LV (incl. PC for controls?)
  • DAQ
  • fibres to connect to DAQ
  • database to summarize results

2. burn-in test ("24 hours"). For this we need:

  • LV
  • HV (till 1000V; must have precise current control/monitor )
  • PC with PVSS to control LV and HV
  • DAQ
  • fibres to connect to DAQ
  • PC to run data analysis (needs to happen in real time as data volumes are very large)
  • database to summarize results
  • a 19 inch rack
  • CO2 cooling
  • vacuum tank
  • if not in the cleanroom, a 'tent' to protect setup

Rough schedule:

  • Q4 2016: prepare vacuum tank, cooling
  • Q1 2017: prepare DAQ

Action list: