* quick electrical test ("20 seconds"), mainly to check that wirebonds are ok. This test should take place in the clean-room. For this we need: | * quick electrical test ("20 seconds"), mainly to check that wirebonds are ok. This test should take place in the clean-room. For this we need: | ||
− | + | ** LV (incl. PC for controls?) | |
− | + | ** DAQ | |
− | + | ** fibres to connect to DAQ | |
− | + | ** database to summarize results | |
* burn-in test ("24 hours"). For this we need: | * burn-in test ("24 hours"). For this we need: | ||
− | + | ** LV | |
− | + | ** HV (till 1000V; must have precise current control/monitor ) | |
− | + | ** PC with PVSS to control LV and HV | |
− | + | ** DAQ | |
− | + | ** fibres to connect to DAQ | |
− | + | ** PC to run data analysis (needs to happen in real time as data volumes are very large) | |
− | + | ** database to summarize results | |
− | + | ** a 19 inch rack | |
− | + | ** CO2 cooling | |
− | + | ** vacuum tank | |
− | + | ** if not in the cleanroom, a 'tent' to protect setup | |
Rough schedule: | Rough schedule: | ||
* Q4 2016: prepare vacuum tank, cooling | * Q4 2016: prepare vacuum tank, cooling | ||
− | * Q1 2017: | + | * Q1 2017: prepare DAQ |
+ | |||
+ | Action list: |
Revision as of 07:33, 22 September 2016
Under construction
Communication
- This wiki: https://wiki.nikhef.nl/lhcb/Upgrade/VeloModules
- ELOG: https://webapps.nikhef.nl/elog/VELO_Upgrade_Cooling_VELOpix/
- Progress reports in MT meetings: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/minutes/
- OPP reports: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/oppreports/VeloUpgradeModules/
- LHCb Velo upgrade web page: https://lbtwiki.cern.ch/bin/view/VELO/VELOUpgrade
- photographs:
Documentation
Setup for module production QA (last update 21/9/2016)
There are two tests:
- quick electrical test ("20 seconds"), mainly to check that wirebonds are ok. This test should take place in the clean-room. For this we need:
- LV (incl. PC for controls?)
- DAQ
- fibres to connect to DAQ
- database to summarize results
- burn-in test ("24 hours"). For this we need:
- LV
- HV (till 1000V; must have precise current control/monitor )
- PC with PVSS to control LV and HV
- DAQ
- fibres to connect to DAQ
- PC to run data analysis (needs to happen in real time as data volumes are very large)
- database to summarize results
- a 19 inch rack
- CO2 cooling
- vacuum tank
- if not in the cleanroom, a 'tent' to protect setup
Rough schedule:
- Q4 2016: prepare vacuum tank, cooling
- Q1 2017: prepare DAQ
Action list: