− | == Vacuum ([https://lbtwiki.cern.ch/bin/view/VELO/VELOOperatingManuals#Vacuum | + | == Vacuum ([https://lbtwiki.cern.ch/bin/view/VELO/VELOOperatingManuals#Vacuum twiki], [https://edms.cern.ch/document/901535/2.3 EDMS]) == |
+ | * change status to ready for beam to ECS after interventions by the CERN vacuum group (watch for date in run meeting; be available for monitoring while Didier takes the actions; make sure to go through 'evacuate' after Didier is ready) | ||
+ | * maintain SmsVacTool script and start it in Neon periods (running on vedcs02) | ||
+ | * check APDP in Neon periods (velo_user_panel) | ||
* answer questions of and perform discussions with the CERN vacuum group about the new vacuum control system (Rodrigo Ferreira, Giuseppe Bregliozzi, Paulo Gomes, Henrik Vestergard) | * answer questions of and perform discussions with the CERN vacuum group about the new vacuum control system (Rodrigo Ferreira, Giuseppe Bregliozzi, Paulo Gomes, Henrik Vestergard) | ||
− | |||
− | |||
− | |||
− | == Motion == | + | == Motion ([https://lbtwiki.cern.ch/bin/view/VELO/VELOOperatingManuals#Motion_Closing twiki], [https://edms.cern.ch/ui/#!master/navigator/project?P:1380376323:1507145775:subDocs EDMS] == |
− | * perform potmeter calibration: WinCC-panel, data-analysis, upload results to motion-PLC | + | * put detectors in place before/after Neon periods (see e.g. [https://lblogbook.cern.ch/VELO/13423 elog before], [https://lblogbook.cern.ch/VELO/12594 elog after]) |
− | * discussions with CERN PH-DT group on the new motion control system (Giovanna Lehmann, Xavier Pons and Sylvain Ravat; | + | * perform potmeter calibration: WinCC-panel, data-analysis, upload results to motion-PLC if needed (once a year! see [https://lbtwiki.cern.ch/bin/view/VELO/VELOMotionExpert#Potentiometer_calibration_proced manual] and [https://lblogbook-run1.cern.ch/VELO/11513 last elog]) |
− | + | * discussions with CERN PH-DT group on the new motion control system (Giovanna Lehmann, Xavier Pons and Sylvain Ravat; [https://indico.cern.ch/event/579358/ link to meeting]) | |
− | == Cooling == | + | == Cooling ([https://lbtwiki.cern.ch/bin/view/VELO/VELOOperatingManuals#Cooling twiki], [https://edms.cern.ch/ui/#!master/navigator/project?P:1380376323:1405012445:subDocs EDMS]) == |
− | * be able to put CO2-pumps under gas ( | + | * be able to put CO2-pumps under gas for pump maintenance (see [https://edms.cern.ch/ui/#!master/navigator/document?P:1380376323:1286479687:subDocs EDMS manuals], one for each pump) |
− | * theory and practice: sub-cooling on input of pump | + | * theory and practice: sub-cooling on input of pump, control PLC-screen, make and interprete trend plots, superheated CO2 (CO2 not cooking), preheaters, SMS tool |
− | * special plots for TL-pump ( | + | * if after restart, superheated CO2 (some coockie temperatures larger than normal by >=2 degrees), start preheating procedure ([https://lbtwiki.cern.ch/bin/view/VELO/VELOCoolingBasic#Use_of_the_preheaters_to_obtain wiki][https://lblogbook-run1.cern.ch/VELO/10600 elog]) |
− | * check long-term behaviour of system, e.g. to reduce risks of thermal runaway | + | * special plots for TL-pump (monitor TL_Diffp_plus in trending tree of velo_user_panel) |
− | * maintain alarm levels in the alert system ( | + | * check long-term behaviour of system (best: sensor NTC temperatures; simplest: coockie temperatures) , e.g. to reduce risks of thermal runaway (if cooling becomes worse we probably loose pressure due to clogged filters; watch pt104 and pt003 in vecool) |
− | * be standby 365, 24/ | + | * maintain alarm levels in the alert system (velo_user_panel) |
+ | * be standby 365, 24/7 to react when system switches to backup, or if anything else goes wrong | ||
* maintain telephone numbers in PLC sms tool | * maintain telephone numbers in PLC sms tool | ||
− | * lend assistance to Seicar for chiller maintaince | + | * lend assistance to Seicar for chiller maintaince, on our initiative, every year, when not under Neon. (see [https://lblogbook-run1.cern.ch/VELO/11817 elog]) Seicar contact goes via Olivier Crespo ( Olivier.Crespo-Lopez@cern.ch ) from CERN cooling group. |
− | * put system in correct state before/after Neon (setpoints, | + | * put system in correct state before/after Neon (setpoints, interlocks, see [https://lblogbook.cern.ch/VELO/13426 elog]) |
− | * keep track of TinyTags data and dry air flow | + | * keep track of TinyTags data and dry air flow (check that air is dry) |
− | * order spare parts and coordinate maintenance and repair | + | * order spare parts (pumps, filters) and coordinate maintenance and repair (Bart van Donk at LEWA) |
− | == | + | == Common vacuuum/motion/cooling == |
− | * check UPS systems and maintain spares ( | + | * participate in VELO run meeting on Tuesday morning |
+ | * check UPS systems and maintain spares (visual inspection once a year in racks downstairs; small: motion cooling; big: vacuum; spares in detector lab bought in LS1; check that leds are burning; web interface) | ||
* maintain email lists of UPS systems (?) | * maintain email lists of UPS systems (?) | ||
− | * check VMC system after yearly AUG and diesel tests ( | + | * check VMC system after yearly AUG and diesel tests (make sure to read run meeting minutes; if restarts required, do vacuum system first) |
− | * update interlock settings before/after Neon period | + | * update interlock settings before/after Neon period (see [https://lblogbook.cern.ch/VELO/13423 elog]) |
* take care of storage in Bld 169 | * take care of storage in Bld 169 | ||
* maintain manuals pages in VELO-twiki and EDMS documents | * maintain manuals pages in VELO-twiki and EDMS documents | ||
− | * | + | * take care of dosimeter reading for dosimeters stored in Velo office |
− | |||
== Velo upgrade == | == Velo upgrade == | ||
* co-coordination of WP5: keep track of anything that relates to modules such as sensors, readout, data tapes, markers, LV- and HV-cables, components (substrates, hybrids, ...) | * co-coordination of WP5: keep track of anything that relates to modules such as sensors, readout, data tapes, markers, LV- and HV-cables, components (substrates, hybrids, ...) | ||
* participate in module-0 meeting on Tuesday | * participate in module-0 meeting on Tuesday | ||
− | * take care of wafer and glass parts in clean room storage | + | * take care of wafer and glass parts in clean room storage at Nikhef |
+ | |||
+ | == Actions 2017 == | ||
+ | * Jan: refurbishment of TR pump; needs LEWA parts + Erno | ||
+ | * Feb 27: AUG test | ||
+ | * Apr 24: Beam-pipe pump down (monitor vacuum and cooling; put detector in correct position afterwards) | ||
+ | * After Apr 24: Chiller maintenance |
Latest revision as of 13:57, 20 December 2016
Vacuum (twiki, EDMS)
- change status to ready for beam to ECS after interventions by the CERN vacuum group (watch for date in run meeting; be available for monitoring while Didier takes the actions; make sure to go through 'evacuate' after Didier is ready)
- maintain SmsVacTool script and start it in Neon periods (running on vedcs02)
- check APDP in Neon periods (velo_user_panel)
- answer questions of and perform discussions with the CERN vacuum group about the new vacuum control system (Rodrigo Ferreira, Giuseppe Bregliozzi, Paulo Gomes, Henrik Vestergard)
Motion (twiki, EDMS
- put detectors in place before/after Neon periods (see e.g. elog before, elog after)
- perform potmeter calibration: WinCC-panel, data-analysis, upload results to motion-PLC if needed (once a year! see manual and last elog)
- discussions with CERN PH-DT group on the new motion control system (Giovanna Lehmann, Xavier Pons and Sylvain Ravat; link to meeting)
Cooling (twiki, EDMS)
- be able to put CO2-pumps under gas for pump maintenance (see EDMS manuals, one for each pump)
- theory and practice: sub-cooling on input of pump, control PLC-screen, make and interprete trend plots, superheated CO2 (CO2 not cooking), preheaters, SMS tool
- if after restart, superheated CO2 (some coockie temperatures larger than normal by >=2 degrees), start preheating procedure (wikielog)
- special plots for TL-pump (monitor TL_Diffp_plus in trending tree of velo_user_panel)
- check long-term behaviour of system (best: sensor NTC temperatures; simplest: coockie temperatures) , e.g. to reduce risks of thermal runaway (if cooling becomes worse we probably loose pressure due to clogged filters; watch pt104 and pt003 in vecool)
- maintain alarm levels in the alert system (velo_user_panel)
- be standby 365, 24/7 to react when system switches to backup, or if anything else goes wrong
- maintain telephone numbers in PLC sms tool
- lend assistance to Seicar for chiller maintaince, on our initiative, every year, when not under Neon. (see elog) Seicar contact goes via Olivier Crespo ( Olivier.Crespo-Lopez@cern.ch ) from CERN cooling group.
- put system in correct state before/after Neon (setpoints, interlocks, see elog)
- keep track of TinyTags data and dry air flow (check that air is dry)
- order spare parts (pumps, filters) and coordinate maintenance and repair (Bart van Donk at LEWA)
Common vacuuum/motion/cooling
- participate in VELO run meeting on Tuesday morning
- check UPS systems and maintain spares (visual inspection once a year in racks downstairs; small: motion cooling; big: vacuum; spares in detector lab bought in LS1; check that leds are burning; web interface)
- maintain email lists of UPS systems (?)
- check VMC system after yearly AUG and diesel tests (make sure to read run meeting minutes; if restarts required, do vacuum system first)
- update interlock settings before/after Neon period (see elog)
- take care of storage in Bld 169
- maintain manuals pages in VELO-twiki and EDMS documents
- take care of dosimeter reading for dosimeters stored in Velo office
Velo upgrade
- co-coordination of WP5: keep track of anything that relates to modules such as sensors, readout, data tapes, markers, LV- and HV-cables, components (substrates, hybrids, ...)
- participate in module-0 meeting on Tuesday
- take care of wafer and glass parts in clean room storage at Nikhef
Actions 2017
- Jan: refurbishment of TR pump; needs LEWA parts + Erno
- Feb 27: AUG test
- Apr 24: Beam-pipe pump down (monitor vacuum and cooling; put detector in correct position afterwards)
- After Apr 24: Chiller maintenance