Difference between revisions of "TaiLinkSSA"

From PDP/Grid Wiki
Jump to navigationJump to search
Line 13: Line 13:
 
<li> [http://www.sinica.edu.tw/~eric/TaiLink/Proposal-Part-B-02Sep05.doc Version 0.4]
 
<li> [http://www.sinica.edu.tw/~eric/TaiLink/Proposal-Part-B-02Sep05.doc Version 0.4]
 
Revised by including materials of ASGC (Eric Yen, 5 September)
 
Revised by including materials of ASGC (Eric Yen, 5 September)
 +
<li> [http://www.nikhef.nl/~bosk/documents/d2005/Proposal-Part-B-18Sep05.doc Version 0.5] Deleted the template text pieces and added some manmonths to the manpower list (Kors, 18 Sept)
 +
 
</UL>
 
</UL>

Revision as of 19:36, 18 September 2005

TaiLink

SmallBld101.JPG

TaiLink is a Specific Support Action (SSA) proposal to the EU to be submitted in the Sixth Framework Programme. It will submitted in the Information Society Technologies activity area (call identifier FP6-2005-IST-5) with the submission deadline of 21 September 2005 at 17h00 (Brussels local time). More information can be found at IST call 5

  • Version 0.0 The empty template for the TaiLink SSA as downloaded from the cordis website.
  • Version 0.1 First attempt to fill in some fields (Kors Bos, August 9)
  • Version 0.2 My attempt to fill items proposed by Kors (Milos Lokajicek, 14 August)
  • Version 0.3 Small change to official name of the institute already used for EU. Our institute uses AC cost model. (Milos Lokajicek, 22 August)
  • Version 0.4 Revised by including materials of ASGC (Eric Yen, 5 September)
  • Version 0.5 Deleted the template text pieces and added some manmonths to the manpower list (Kors, 18 Sept)