=== Update September 2023 ===
+
=== Update September 2024 - joint XAMS project ===
 
{| class="wikitable"
 
{| class="wikitable"
 
|+
 
|+
Line 9: Line 9:
 
!Finish by
 
!Finish by
 
|-
 
|-
|<u>Measure fluorescence efficiency of PTFE</u>
+
|<u>Finalise reflectivity measurements of DUNE cryostat components</u>
|Pranati
+
|Marjolein/Vikas/Corryenne
|
 
 
|
 
|
 
|
 
|
 +
|Oct 2024
 
|-
 
|-
|<u>Measure reflectance of cryostat components</u>
+
|Fluorescence measurements in VULCAN
|<u>Marjolein</u>
+
|<u>Anna</u>
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|<u>Measure optical properties of Arapuca components</u>
+
|<u>Delayed electrons and g1 in XAMS</u>
|<u>Vikas</u>
+
|<u>Joost</u>
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|Reflectance of cryostat
+
|Calibration of XAMS
|Corryenne
+
|Noor
 
|
 
|
 
|
 
|
|June 2024
 
|-
 
|Light intensity in space and time
 
|Mano
 
 
|
 
|
|
 
|Nov 30
 
 
|-
 
|-
|Gain characterization of SiPMs
+
|Reflectance of DUNE cryostat components
|
+
|Corryenne
|
 
 
|
 
|
 
|
 
|
 +
|June 2024
 
|-
 
|-
 
|Measure time stability of D2 lamp intensity
 
|Measure time stability of D2 lamp intensity
Line 56: Line 50:
 
|
 
|
 
|
 
|
|-
 
|<u>Measure the spectrum of the D2 lamp</u>
 
|<u>Jasmijn</u>
 
|
 
|Done
 
|Dec 1
 
|-
 
|Measure excitation beam intensity as function of SiPM position and slit width
 
|Tomas
 
|
 
|Done
 
|June 30
 
|-
 
|Measure reflectivity of DUNE cryostat sample
 
|Yannick
 
|
 
|Done
 
|June 30
 
|-
 
|DN vs temperature characterization of SiPMs
 
|<u>Lucia</u>
 
|
 
|Done
 
|Feb 4 or 7
 
|-
 
|Continue DN vs temp measurements
 
|BSc internship students
 
|
 
|Done
 
|End of June
 
 
|}
 
|}
 
 
{| class="wikitable"
 
{| class="wikitable"
 
|+
 
|+
 +
!Task - hardware
 +
!DRI
 +
!Dependencies
 +
!Status
 
|-
 
|-
! Task !! DRI !! Dependencies
+
|Design SiPM holder for fluorescence measurements
!Status|| Date
+
|Anna
|-
+
|Reflectivity study finished
| '''Set up V1730 digitisers/read-out computer''' || Marjolein ||
 
|testing
 
| March
 
|-
 
|Set baseline and threshold for reading single p.e. signals
 
|
 
|
 
|
 
 
|
 
|
 
|-
 
|-
|Test new V1720 digitiser and readout settings
+
|Set up and test cooling system for samples, SiPM
|
+
|Anna
|Digitiser arrives
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Integrate waveform readout with slow control interface for data quality checks
+
|Fully reconfigure VULCAN for fluorescence measurements
|
+
|Anna
|
+
|cooling system and SiPM holder ready
|
 
 
|
 
|
 
|-
 
|-
|'''Characterization of VUV SiPMs'''
+
|Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit
|
+
|Anna/Joost
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Decide which SiPM(s) are going to be used for first measurements
+
|Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS
|
+
|Anna/Joost
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Check what is on the CD we got with the SiPMs
+
|Procure SiPM read-out board - 4 channels, S13360-6050PE/CS SiPMs - from ET
|
+
|Anna/Joost
|
+
|Previous SiPM test results
|
 
 
|
 
|
 
|-
 
|-
|Dark noise vs temperature measurements
+
|Install and test 16-channel digitiser for XAMS
|
+
|AP
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Gain measurement
+
|Set up XAMS to start a run
|
+
|Tobias
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|'''Set up upgraded slow control system'''
+
|Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve)
|Vikas
+
|Joost
|need to send back box
 
 
 
to Hans to figure out correct
 
 
 
pins for limit switches
 
|motor control works,
 
 
 
temperature setup tbd
 
|Sept
 
|-
 
|Get temperature sensor installed in the vacuum chamber
 
|
 
|
 
 
|
 
|
 
|
 
|
 +
|}
 +
{| class="wikitable"
 +
!Task - software/analysis
 +
!DRI
 +
!Dependencies
 +
!Status
 
|-
 
|-
|'''Characterization of light in chamber'''
+
|XAMS MC - simulate calibration sources, g1 expectation
|
+
|AP/?
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Redo measurements and analysis Tomas
+
|VULCAN MC - simulate photon paths/coverage fraction of SiPMs
|
+
|Anna
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Find slit sizes that are good for taking measurements at relevant wavelengths
+
|Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN
|
+
|Pranati
|
 
|
 
|
 
|-
 
| '''Have sample storage box made (3D print)''' || Vikas ||
 
|prototype done
 
| Feb
 
|-
 
|'''Clean samples'''
 
|Vikas
 
|
 
|
 
|April
 
|-
 
|Develop sample cleaning procedure
 
 
|
 
|
 
|
 
|
|
 
|
 
|-
 
|Make sure all chemicals for sample cleaning procedure are available
 
|
 
|
 
|
 
|
 
|-
 
|'''Improve the vacuum'''
 
|
 
|
 
|
 
|
 
|-
 
|Test the pressure sensor
 
|Marjolein
 
|
 
|done
 
|Oct
 
|-
 
|Get new O-rings
 
|
 
|
 
|
 
|
 
|-
 
|Test vacuum per compartment (just pump, then pump and monochromator, etc.)
 
|
 
|
 
|
 
|
 
|-
 
|'''Improve in-vacuum SiPM connections''' (SiPM to wire and wire to feedthrough) so easy switching of SiPMs is possible but also good connection
 
|
 
|
 
|
 
|
 
|-
 
| '''Put together a summary of previous VUV reflectance measurements''' (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE || Vikas ||
 
|  ||
 
|-
 
|  ||  ||
 
|  ||
 
|-
 
|<s>Make SiPM cable connections (ask electronics if soldering is possible, otherwise use pins)</s>
 
|Tomas/Yannick
 
|
 
|done
 
|May
 
|-
 
|<s>Test alignment new sample holder</s>
 
|Tomas/Yannick
 
|
 
|done
 
|May
 
 
|-
 
|-
|<s>Clean setup</s>
 
 
|
 
|
 
|
 
|
|done
 
|April
 
|-
 
| <s>Sort out data storage with PDP group</s> || Tina/Marjolein ||
 
|done
 
| Feb
 
|-
 
|<s>Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic)</s>
 
|Marjolein
 
 
|
 
|
|done
 
|March
 
|-
 
|<s>Re-configure the sample chamber for reflectance measurements</s>
 
|Marjolein/Vikas
 
 
|
 
|
|done
 
|March
 
|-
 
| <s>CAD model of setup; study geometry of light paths and sample/detectors</s> || Marjolein ||
 
|done
 
|
 
|-
 
| <s>Move setup back to old lab</s> || all ||
 
| done|| March
 
|-
 
| <s>Summarise optics inputs to MC in DUNE, and if available, other LAr detectors</s> || Marjolein ||
 
| done
 
|
 
|-
 
|  ||  ||
 
| ||
 
 
|}
 
|}
  
  
=== Vacations and Meetings ===
+
=== Vacations, Meetings, and general availability of people ===
 
General:
 
General:
  
Group outing October 30/31
+
Tina:
  
NNV meeting November 3
+
*
  
Tina:  
+
AP:
  
* Jan 22-24: NWO conference
+
* Working from home in Sept.
*
 
  
 
Marjolein:
 
Marjolein:
  
* November 6 - December 16: Fermilab<br />
+
*<br />
  
 
Vikas:
 
Vikas:
  
* November 8 - Dec 3, vacation
 
 
*  
 
*  
 
*  
 
*  
 
+
*
  
 
Pranati:
 
Pranati:
  
* Expected start October 16
+
*  
  
Mano (AUC BSc)/uniformity of light ball, dwarf analysis
 
  
* Start September 4th, End December 18; 1 day/week
+
Anna (MSc, Sept 2024 - July 2025):
* Availability Wednesdays 9am - 3pm, Thursday after 2pm
 
* October 23-27: lecture free week
 
  
Coryenne (MSc)/reflectance measurement, cooling system
+
*  
 
 
* Start September 13
 
* Oct 23 - 27: Vacation
 
* June 3 - 13: Vacation
 
 
 
== Outdated below here ==
 
{| class="wikitable"
 
|+
 
!Task (move and January DC project)
 
!DRI
 
!dependencies
 
!Status
 
!Deadline
 
|-
 
|<s>Pack all tools and parts that belong to the VUV setup in boxes</s>
 
|Emily and Marjolein
 
|Boxes arrived
 
|Done
 
|Dec 13
 
|-
 
|<s>Put the DAQ for the SiPM and the temperature readout equipment together so the complete system necessary for DC rate measurement can be moved independently. Room is TBD</s>
 
|Emily and Marjolein
 
|
 
|Done
 
|Dec 13
 
|-
 
|<s>Check if the VUV setup table fits through the corridor. If not, we have to disassemble so let's hope it fits.</s>
 
|Marjolein
 
|
 
|Done
 
|Dec 12
 
|-
 
|<s>Identify dark box to be used for DC measurement.</s>
 
|Tina
 
|
 
|
 
|Dec 16
 
|-
 
|<s>Test Peltier element and plan how to integrate it in the dark box and with the SiPM and PT100</s>
 
|
 
|Power supply for Peltier element
 
|
 
|Dec 16
 
|-
 
|<s>Set up PT100 read-out and SiPM read-out through dark box</s>
 
|Vikas (Lucia, Tina)
 
|
 
|Done
 
|Jan 12
 
|-
 
|<s>Develop procedure to keep SiPM at specific temperature for ~15 minutes at a time (what voltage/current is needed?) and determine if a large enough temperature range is accessible with this element (if not, ask Tina to order the next size up)</s>
 
|Vikas (Lucia)
 
|Temperature range might need to be increased for future dark box measurements. Unlikely to go below 0° for full setup atm.
 
|Done
 
|Jan 13
 
|-
 
|<s>Script to plot DC rates as function of temperature</s>
 
|Marjolein (Lucia)
 
|
 
|Done
 
|Jan 20
 
|-
 
|<s>Script to fit the "DC rate versus temperature" curve</s>
 
|Lucia
 
|
 
|Done
 
|Jan 27
 
|-
 
|
 
|
 
|
 
|
 
|
 
|}
 
{| class="wikitable"
 
|+
 
!Task (hardware)
 
!DRI
 
!Main dependencies
 
!Status
 
!Finish by
 
|-
 
|<s>Read out pressure sensor and debug code
 
|Marjolein
 
|Vikas
 
|Done
 
|Sept 23
 
|-
 
|<s>Check if lamp noise is still there/what it looks like now
 
|Emily
 
|
 
|Done
 
|Sept 23</s>
 
|-
 
|<s>Cooling system for sample/SiPM planning and component ordering (design, simulations, quotes for components)
 
|Emily
 
|
 
|Done
 
|Sept 27
 
|-
 
|<s>Get SiPM signal out of vacuum (1 channel for now, 9 channels eventually)</s>
 
|Emily
 
|
 
|Done
 
|Oct 1
 
|-
 
|<s>Leak check vacuum system and fix leaks</s>
 
- <s>clean vacuum chamber</s>
 
 
 
- <s>pump down and check pressure + pump-down time</s>
 
 
 
- <s>tighten bolts on monochromator and feedthroughs</s>
 
 
 
- <s>pump down and check pressure + pump-down time</s>
 
|Marjolein (Jasmijn)
 
|Pressure read-out working
 
|Done
 
|Oct 1
 
|-
 
|SiPM signal output
 
- <s>Adjust readout frequency cutoffs (Hans' one-channel board)</s>
 
 
 
- <s>Test SiPM signal (noise) when pump and lamp are on, fix if necessary</s>
 
 
 
- <s>Connect and test the Zurich board - signal-to-noise</s>
 
 
 
- <s>Figure out what changes if any are needed to bias and read the fluorescence measurement SiPMs</s>
 
 
 
- <s>Design and get a SiPM connector plug for inside the vacuum</s>
 
|Emily
 
|Vacuum/light leak eliminated
 
|Done
 
|Oct 7 (Oct 20 for the new board)
 
|-
 
|<s>Design SiPM array holder for fluorescence</s>
 
|Marjolein/Emily
 
|Preliminary analysis of sensitivity needs finished
 
|Done
 
|Nov
 
|-
 
|<s>Design SiPM array holder for reflectance/transmission</s>
 
|Marjolein
 
|Analysis of physics goals finished
 
|Done
 
|Nov
 
|-
 
|<s>Get SiPM signal to disk such that single-pulse rates can be measured (programmable CAEN digitizer for now, V1720 with XAMS-like read-out later)</s>
 
|Marjolein (Jasmijn)
 
|
 
|
 
|Nov
 
|-
 
|<s>Get sample holder (fluorescence design) built</s>
 
|Emily
 
|
 
|Done
 
|Nov
 
|-
 
|<s>Calibrations start</s>
 
|Emily Marjolein
 
|Minimum working setup
 
|
 
|Dec
 
|-
 
|Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation)
 
|Emily
 
|Delivery of components/LN2 approval for lab
 
|
 
|Dec/Jan
 
|-
 
|Set up slow-control read-out and data storage, monochromator motor control
 
|Vikas -> ?
 
|
 
|
 
|Jan
 
|}
 
{| class="wikitable"
 
|+
 
!Task (review and calculations)
 
!DRI
 
!Status
 
!Finish by
 
|-
 
|<s>Estimate sensitivity needs for observation of the PTFE fluorescence measurement in the setup (preliminary, rough calculation)</s>
 
|Emily (Jasmijn)
 
|Done
 
|Oct 28
 
|-
 
|<s>Review past reflectivity setup design/sample holder (that had XENON in mind) in light of DUNE needs</s>
 
|Marjolein
 
|Done
 
|Oct 30
 
|-
 
|
 
|
 
|
 
|
 
|}
 
Link to measurement procedure document: [[File:Measurement_procedure.pdf]]
 
 
 
=== Update August 2022 ===
 
 
 
====== PhDs: ======
 
Vikas: At CERN until end of the year. Will work a little bit with CT technician to get code and slow control in good shape.
 
 
 
Emily: Focus on getting the SiPM signals to the digitisers. Work with Hans from ET department.
 
 
 
Marjolein: Focus on getting the data from the digitisers into a good format. Work with Maricke/Joran to copy XAMS read-out software.
 
 
 
====== Undergraduates: ======
 
<s>Ilze (start Sept 12, HBO internship): Get vacuum chamber working correctly, design improved SiPM holder. Measure beam intensity as function of distance using SiPM</s>
 
 
 
'''Jasmijn''' (start Sept, AUC capstone project):  Measure lamp spectrum. Based on expected PTFE fluorescence efficiency, calculate amount of light expected on SiPM, and whether that is measurable over the DC rate
 
 
 
Not free: Monday 11-14, Tuesday 11-13, Wednesday 9-12, Thursday 16-18, Friday 16-18
 
  
 +
Joost (MSc, Sept 2024 - July 2025):
  
'''Lucia''' (January 2023): Measure the SiPM DC rate as a function of temperature. About 6 hours per day.
+
* Lectures on Monday 9-11
 +
Noor (BSc internship, Sept 2024 - Jan 2025):
  
======Projects for distibution======
+
*
# SiPM array and  holder --> reflectivity design (modelling/ mechanical viability/ feedthrough positioning)
 
# SiPM array and holder --> fluorescence design (modelling/ mechanical viability/ movement inside chamber/ solid angle coverage)
 
# Cooling system for sample holder/SiPMs (CAD/COMSOL/ LN2 bath)
 
# Put together a plan for data taking
 

Revision as of 11:47, 10 September 2024

Update September 2024 - joint XAMS project

Projects DRI Main dependencies Status Finish by
Finalise reflectivity measurements of DUNE cryostat components Marjolein/Vikas/Corryenne Oct 2024
Fluorescence measurements in VULCAN Anna
Delayed electrons and g1 in XAMS Joost
Calibration of XAMS Noor
Reflectance of DUNE cryostat components Corryenne June 2024
Measure time stability of D2 lamp intensity
Determine effect of exposure to radiation on fluorescence of plastics
Task - hardware DRI Dependencies Status
Design SiPM holder for fluorescence measurements Anna Reflectivity study finished
Set up and test cooling system for samples, SiPM Anna
Fully reconfigure VULCAN for fluorescence measurements Anna cooling system and SiPM holder ready
Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit Anna/Joost
Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS Anna/Joost
Procure SiPM read-out board - 4 channels, S13360-6050PE/CS SiPMs - from ET Anna/Joost Previous SiPM test results
Install and test 16-channel digitiser for XAMS AP
Set up XAMS to start a run Tobias
Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve) Joost
Task - software/analysis DRI Dependencies Status
XAMS MC - simulate calibration sources, g1 expectation AP/?
VULCAN MC - simulate photon paths/coverage fraction of SiPMs Anna
Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN Pranati


Vacations, Meetings, and general availability of people

General:

Tina:

AP:

  • Working from home in Sept.

Marjolein:


Vikas:

Pranati:


Anna (MSc, Sept 2024 - July 2025):

Joost (MSc, Sept 2024 - July 2025):

  • Lectures on Monday 9-11

Noor (BSc internship, Sept 2024 - Jan 2025):