Difference between revisions of "VUVProjectsPlanning"
 (Update planning)  | 
				|||
| Line 94: | Line 94: | ||
!Status|| Date  | !Status|| Date  | ||
|-  | |-  | ||
| − | |  | + | | '''Set up V1730 digitisers/read-out computer''' || Marjolein ||   | 
| − | |  | + | |testing  | 
| + | | March  | ||
| + | |-  | ||
| + | |Set baseline and threshold for reading single p.e. signals  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Test new V1720 digitiser and readout settings  | ||
| + | |  | ||
| + | |Digitiser arrives  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Integrate waveform readout with slow control interface for data quality checks  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |'''Characterization of VUV SiPMs'''  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Decide which SiPM(s) are going to be used for first measurements  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Check what is on the CD we got with the SiPMs  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
|  | |  | ||
| − | |||
| − | |||
|-  | |-  | ||
| − | |  | + | |Dark noise vs temperature measurements  | 
| − | |  | + | |  | 
| + | |  | ||
| + | |  | ||
|  | |  | ||
| − | |||
| − | |||
|-  | |-  | ||
| − | |   | + | |Gain measurement  | 
| − | |  | + | |  | 
| − | |   | + | |  | 
| + | |  | ||
| + | |  | ||
|-  | |-  | ||
| − | |Set up upgraded slow control system  | + | |'''Set up upgraded slow control system'''  | 
|Vikas  | |Vikas  | ||
|need to send back box  | |need to send back box  | ||
| Line 122: | Line 158: | ||
|Sept  | |Sept  | ||
|-  | |-  | ||
| − | | Have sample storage box made (3D print) || Vikas ||    | + | |Get temperature sensor installed in the vacuum chamber  | 
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |'''Characterization of light in chamber'''  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Redo measurements and analysis Tomas  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Find slit sizes that are good for taking measurements at relevant wavelengths  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | | '''Have sample storage box made (3D print)''' || Vikas ||    | ||
|prototype done  | |prototype done  | ||
| Feb  | | Feb  | ||
|-  | |-  | ||
| − | |  | + | |'''Clean samples'''  | 
| + | |Vikas  | ||
| + | |  | ||
| + | |  | ||
| + | |April  | ||
| + | |-  | ||
| + | |Develop sample cleaning procedure  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Make sure all chemicals for sample cleaning procedure are available  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |'''Improve the vacuum'''  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Test the pressure sensor  | ||
| + | |Marjolein  | ||
| + | |  | ||
| + | |  | ||
| + | |Oct  | ||
| + | |-  | ||
| + | |Get new O-rings  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Test vacuum per compartment (just pump, then pump and monochromator, etc.)  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |'''Improve in-vacuum SiPM connections''' (SiPM to wire and wire to feedthrough) so easy switching of SiPMs is possible but also good connection  | ||
| + | |  | ||
|  | |  | ||
|  | |  | ||
| − | |||
|  | |  | ||
| + | |-  | ||
| + | | '''Put together a summary of previous VUV reflectance measurements''' (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE || Vikas ||   | ||
| + | |  ||  | ||
| + | |-  | ||
| + | |  ||  ||   | ||
| + | |  ||   | ||
| + | |-  | ||
| + | |<s>Make SiPM cable connections (ask electronics if soldering is possible, otherwise use pins)</s>  | ||
| + | |Tomas/Yannick  | ||
| + | |  | ||
| + | |done  | ||
| + | |May  | ||
| + | |-  | ||
| + | |<s>Test alignment new sample holder</s>  | ||
| + | |Tomas/Yannick  | ||
| + | |  | ||
| + | |done  | ||
| + | |May  | ||
|-  | |-  | ||
|<s>Clean setup</s>  | |<s>Clean setup</s>  | ||
| Line 160: | Line 280: | ||
| <s>Move setup back to old lab</s> || all ||    | | <s>Move setup back to old lab</s> || all ||    | ||
| done|| March  | | done|| March  | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
|-  | |-  | ||
| <s>Summarise optics inputs to MC in DUNE, and if available, other LAr detectors</s> || Marjolein ||    | | <s>Summarise optics inputs to MC in DUNE, and if available, other LAr detectors</s> || Marjolein ||    | ||
| Line 185: | Line 293: | ||
General:  | General:  | ||
| − | + | Group outing October 30/31  | |
| + | |||
| + | NNV meeting November 3   | ||
Tina:    | Tina:    | ||
| Line 193: | Line 303: | ||
* Sept 25-29: IOP+Xenon collaboration meeting  | * Sept 25-29: IOP+Xenon collaboration meeting  | ||
*    | *    | ||
| − | |||
Marjolein:  | Marjolein:  | ||
| − | + | * November 6 - December 16: Fermilab<br />  | |
Vikas:  | Vikas:  | ||
| Line 204: | Line 313: | ||
*    | *    | ||
*    | *    | ||
| + | |||
Pranati:  | Pranati:  | ||
* Expected start October 16  | * Expected start October 16  | ||
| − | |||
Mano (AUC BSc)/uniformity of light ball, dwarf analysis  | Mano (AUC BSc)/uniformity of light ball, dwarf analysis  | ||
| Line 215: | Line 324: | ||
* Availability Wednesdays 9am - 3pm, Thursday after 2pm  | * Availability Wednesdays 9am - 3pm, Thursday after 2pm  | ||
* October 23-27: lecture free week  | * October 23-27: lecture free week  | ||
| − | |||
Coryenne (MSc)/reflectance measurement, cooling system  | Coryenne (MSc)/reflectance measurement, cooling system  | ||
Revision as of 11:28, 6 October 2023
Update September 2023
| Projects | DRI | Main dependencies | Status | Finish by | 
|---|---|---|---|---|
| Measure fluorescence efficiency of PTFE | Pranati | |||
| Measure reflectance of cryostat components | Marjolein | |||
| Measure optical properties of Arapuca components | Vikas | |||
| Reflectance of cryostat | Corryenne | June 2024 | ||
| Light intensity in space and time | Mano | Nov 30 | ||
| Gain characterization of SiPMs | ||||
| Measure time stability of D2 lamp intensity | ||||
| Determine effect of exposure to radiation on fluorescence of plastics | ||||
| Measure the spectrum of the D2 lamp | Jasmijn | Done | Dec 1 | |
| Measure excitation beam intensity as function of SiPM position and slit width | Tomas | Done | June 30 | |
| Measure reflectivity of DUNE cryostat sample | Yannick | Done | June 30 | |
| DN vs temperature characterization of SiPMs | Lucia | Done | Feb 4 or 7 | |
| Continue DN vs temp measurements | BSc internship students | Done | End of June | 
| Task | DRI | Dependencies | Status | Date | 
|---|---|---|---|---|
| Set up V1730 digitisers/read-out computer | Marjolein | testing | March | |
| Set baseline and threshold for reading single p.e. signals | ||||
| Test new V1720 digitiser and readout settings | Digitiser arrives | |||
| Integrate waveform readout with slow control interface for data quality checks | ||||
| Characterization of VUV SiPMs | ||||
| Decide which SiPM(s) are going to be used for first measurements | ||||
| Check what is on the CD we got with the SiPMs | ||||
| Dark noise vs temperature measurements | ||||
| Gain measurement | ||||
| Set up upgraded slow control system | Vikas | need to send back box
 to Hans to figure out correct pins for limit switches  | 
motor control works,
 temperature setup tbd  | 
Sept | 
| Get temperature sensor installed in the vacuum chamber | ||||
| Characterization of light in chamber | ||||
| Redo measurements and analysis Tomas | ||||
| Find slit sizes that are good for taking measurements at relevant wavelengths | ||||
| Have sample storage box made (3D print) | Vikas | prototype done | Feb | |
| Clean samples | Vikas | April | ||
| Develop sample cleaning procedure | ||||
| Make sure all chemicals for sample cleaning procedure are available | ||||
| Improve the vacuum | ||||
| Test the pressure sensor | Marjolein | Oct | ||
| Get new O-rings | ||||
| Test vacuum per compartment (just pump, then pump and monochromator, etc.) | ||||
| Improve in-vacuum SiPM connections (SiPM to wire and wire to feedthrough) so easy switching of SiPMs is possible but also good connection | ||||
| Put together a summary of previous VUV reflectance measurements (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE | Vikas | |||
| Tomas/Yannick | done | May | ||
| Tomas/Yannick | done | May | ||
| done | April | |||
| Tina/Marjolein | done | Feb | ||
| Marjolein | done | March | ||
| Marjolein/Vikas | done | March | ||
| Marjolein | done | |||
| all | done | March | ||
| Marjolein | done | |||
Vacations and Meetings
General:
Group outing October 30/31
NNV meeting November 3
Tina:
- August 28 - Sept 1 TAUP
 - Sept 18-22: LIDINE
 - Sept 25-29: IOP+Xenon collaboration meeting
 
Marjolein:
- November 6 - December 16: Fermilab
 
Vikas:
- November 8 - Dec 3, vacation
 
Pranati:
- Expected start October 16
 
Mano (AUC BSc)/uniformity of light ball, dwarf analysis
- Start September 4th, End December 18; 1 day/week
 - Availability Wednesdays 9am - 3pm, Thursday after 2pm
 - October 23-27: lecture free week
 
Coryenne (MSc)/reflectance measurement, cooling system
- Start September 13
 - Oct 23-27: Vacation
 
Outdated below here
| Task (move and January DC project) | DRI | dependencies | Status | Deadline | 
|---|---|---|---|---|
| Emily and Marjolein | Boxes arrived | Done | Dec 13 | |
| Emily and Marjolein | Done | Dec 13 | ||
| Marjolein | Done | Dec 12 | ||
| Tina | Dec 16 | |||
| Power supply for Peltier element | Dec 16 | |||
| Vikas (Lucia, Tina) | Done | Jan 12 | ||
| Vikas (Lucia) | Temperature range might need to be increased for future dark box measurements. Unlikely to go below 0° for full setup atm. | Done | Jan 13 | |
| Marjolein (Lucia) | Done | Jan 20 | ||
| Lucia | Done | Jan 27 | ||
| Task (hardware) | DRI | Main dependencies | Status | Finish by | 
|---|---|---|---|---|
| Marjolein | Vikas | Done | Sept 23 | |
| Emily | Done | Sept 23 | ||
| Emily | Done | Sept 27 | ||
| Emily | Done | Oct 1 | ||
-  -  -  -   | 
Marjolein (Jasmijn) | Pressure read-out working | Done | Oct 1 | 
| SiPM signal output
 -  -  -  -  -   | 
Emily | Vacuum/light leak eliminated | Done | Oct 7 (Oct 20 for the new board) | 
| Marjolein/Emily | Preliminary analysis of sensitivity needs finished | Done | Nov | |
| Marjolein | Analysis of physics goals finished | Done | Nov | |
| Marjolein (Jasmijn) | Nov | |||
| Emily | Done | Nov | ||
| Emily Marjolein | Minimum working setup | Dec | ||
| Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation) | Emily | Delivery of components/LN2 approval for lab | Dec/Jan | |
| Set up slow-control read-out and data storage, monochromator motor control | Vikas -> ? | Jan | 
| Task (review and calculations) | DRI | Status | Finish by | 
|---|---|---|---|
| Emily (Jasmijn) | Done | Oct 28 | |
| Marjolein | Done | Oct 30 | |
Link to measurement procedure document: File:Measurement procedure.pdf
Update August 2022
PhDs:
Vikas: At CERN until end of the year. Will work a little bit with CT technician to get code and slow control in good shape.
Emily: Focus on getting the SiPM signals to the digitisers. Work with Hans from ET department.
Marjolein: Focus on getting the data from the digitisers into a good format. Work with Maricke/Joran to copy XAMS read-out software.
Undergraduates:
Ilze (start Sept 12, HBO internship): Get vacuum chamber working correctly, design improved SiPM holder. Measure beam intensity as function of distance using SiPM
Jasmijn (start Sept, AUC capstone project): Measure lamp spectrum. Based on expected PTFE fluorescence efficiency, calculate amount of light expected on SiPM, and whether that is measurable over the DC rate
Not free: Monday 11-14, Tuesday 11-13, Wednesday 9-12, Thursday 16-18, Friday 16-18
Lucia (January 2023): Measure the SiPM DC rate as a function of temperature. About 6 hours per day.
Projects for distibution
- SiPM array and holder --> reflectivity design (modelling/ mechanical viability/ feedthrough positioning)
 - SiPM array and holder --> fluorescence design (modelling/ mechanical viability/ movement inside chamber/ solid angle coverage)
 - Cooling system for sample holder/SiPMs (CAD/COMSOL/ LN2 bath)
 - Put together a plan for data taking