Difference between revisions of "VUVProjectsPlanning"

From Vacuum Ultra Violet
Jump to navigation Jump to search
(Update planning)
Line 94: Line 94:
 
!Status|| Date
 
!Status|| Date
 
|-
 
|-
|<s>Make SiPM cable connections (ask electronics if soldering is possible, otherwise use pins)</s>
+
| '''Set up V1730 digitisers/read-out computer''' || Marjolein ||
|Tomas/Yannick
+
|testing
 +
| March
 +
|-
 +
|Set baseline and threshold for reading single p.e. signals
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Test new V1720 digitiser and readout settings
 +
|
 +
|Digitiser arrives
 +
|
 +
|
 +
|-
 +
|Integrate waveform readout with slow control interface for data quality checks
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|'''Characterization of VUV SiPMs'''
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Decide which SiPM(s) are going to be used for first measurements
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Check what is on the CD we got with the SiPMs
 +
|
 +
|
 +
|
 
|
 
|
|done
 
|May
 
 
|-
 
|-
|<s>Test alignment new sample holder</s>
+
|Dark noise vs temperature measurements
|Tomas/Yannick
+
|
 +
|
 +
|
 
|
 
|
|done
 
|May
 
 
|-
 
|-
| Set up V1730 digitisers/read-out computer || Marjolein || digitizers arrive
+
|Gain measurement
|testing
+
|
| March
+
|
 +
|
 +
|
 
|-
 
|-
|Set up upgraded slow control system
+
|'''Set up upgraded slow control system'''
 
|Vikas
 
|Vikas
 
|need to send back box
 
|need to send back box
Line 122: Line 158:
 
|Sept
 
|Sept
 
|-
 
|-
| Have sample storage box made (3D print) || Vikas ||  
+
|Get temperature sensor installed in the vacuum chamber
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|'''Characterization of light in chamber'''
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Redo measurements and analysis Tomas
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Find slit sizes that are good for taking measurements at relevant wavelengths
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| '''Have sample storage box made (3D print)''' || Vikas ||  
 
|prototype done
 
|prototype done
 
| Feb
 
| Feb
 
|-
 
|-
|DN vs temperature characterization of VUV SiPMs
+
|'''Clean samples'''
 +
|Vikas
 +
|
 +
|
 +
|April
 +
|-
 +
|Develop sample cleaning procedure
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Make sure all chemicals for sample cleaning procedure are available
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|'''Improve the vacuum'''
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Test the pressure sensor
 +
|Marjolein
 +
|
 +
|
 +
|Oct
 +
|-
 +
|Get new O-rings
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|Test vacuum per compartment (just pump, then pump and monochromator, etc.)
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
|'''Improve in-vacuum SiPM connections''' (SiPM to wire and wire to feedthrough) so easy switching of SiPMs is possible but also good connection
 +
|
 
|
 
|
 
|
 
|
|moved to June
 
 
|
 
|
 +
|-
 +
| '''Put together a summary of previous VUV reflectance measurements''' (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE || Vikas ||
 +
|  ||
 +
|-
 +
|  ||  ||
 +
|  ||
 +
|-
 +
|<s>Make SiPM cable connections (ask electronics if soldering is possible, otherwise use pins)</s>
 +
|Tomas/Yannick
 +
|
 +
|done
 +
|May
 +
|-
 +
|<s>Test alignment new sample holder</s>
 +
|Tomas/Yannick
 +
|
 +
|done
 +
|May
 
|-
 
|-
 
|<s>Clean setup</s>
 
|<s>Clean setup</s>
Line 160: Line 280:
 
| <s>Move setup back to old lab</s> || all ||  
 
| <s>Move setup back to old lab</s> || all ||  
 
| done|| March
 
| done|| March
|-
 
|Make sure all chemicals for sample cleaning procedure are available; clean samples
 
|Vikas
 
|
 
|
 
|April
 
|-
 
|  ||  ||
 
| ||
 
|-
 
| Put together a summary of previous VUV reflectance measurements (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE || Vikas ||
 
| ||
 
 
|-
 
|-
 
| <s>Summarise optics inputs to MC in DUNE, and if available, other LAr detectors</s> || Marjolein ||  
 
| <s>Summarise optics inputs to MC in DUNE, and if available, other LAr detectors</s> || Marjolein ||  
Line 185: Line 293:
 
General:
 
General:
  
CAN meeting: June 20-21
+
Group outing October 30/31
 +
 
 +
NNV meeting November 3
  
 
Tina:  
 
Tina:  
Line 193: Line 303:
 
* Sept 25-29: IOP+Xenon collaboration meeting
 
* Sept 25-29: IOP+Xenon collaboration meeting
 
*  
 
*  
 
  
 
Marjolein:
 
Marjolein:
  
 
+
* November 6 - December 16: Fermilab<br />
  
 
Vikas:
 
Vikas:
Line 204: Line 313:
 
*  
 
*  
 
*  
 
*  
 +
  
 
Pranati:
 
Pranati:
  
 
* Expected start October 16
 
* Expected start October 16
 
  
 
Mano (AUC BSc)/uniformity of light ball, dwarf analysis
 
Mano (AUC BSc)/uniformity of light ball, dwarf analysis
Line 215: Line 324:
 
* Availability Wednesdays 9am - 3pm, Thursday after 2pm
 
* Availability Wednesdays 9am - 3pm, Thursday after 2pm
 
* October 23-27: lecture free week
 
* October 23-27: lecture free week
 
  
 
Coryenne (MSc)/reflectance measurement, cooling system
 
Coryenne (MSc)/reflectance measurement, cooling system

Revision as of 11:28, 6 October 2023

Update September 2023

Projects DRI Main dependencies Status Finish by
Measure fluorescence efficiency of PTFE Pranati
Measure reflectance of cryostat components Marjolein
Measure optical properties of Arapuca components Vikas
Reflectance of cryostat Corryenne June 2024
Light intensity in space and time Mano Nov 30
Gain characterization of SiPMs
Measure time stability of D2 lamp intensity
Determine effect of exposure to radiation on fluorescence of plastics
Measure the spectrum of the D2 lamp Jasmijn Done Dec 1
Measure excitation beam intensity as function of SiPM position and slit width Tomas Done June 30
Measure reflectivity of DUNE cryostat sample Yannick Done June 30
DN vs temperature characterization of SiPMs Lucia Done Feb 4 or 7
Continue DN vs temp measurements BSc internship students Done End of June
Task DRI Dependencies Status Date
Set up V1730 digitisers/read-out computer Marjolein testing March
Set baseline and threshold for reading single p.e. signals
Test new V1720 digitiser and readout settings Digitiser arrives
Integrate waveform readout with slow control interface for data quality checks
Characterization of VUV SiPMs
Decide which SiPM(s) are going to be used for first measurements
Check what is on the CD we got with the SiPMs
Dark noise vs temperature measurements
Gain measurement
Set up upgraded slow control system Vikas need to send back box

to Hans to figure out correct

pins for limit switches

motor control works,

temperature setup tbd

Sept
Get temperature sensor installed in the vacuum chamber
Characterization of light in chamber
Redo measurements and analysis Tomas
Find slit sizes that are good for taking measurements at relevant wavelengths
Have sample storage box made (3D print) Vikas prototype done Feb
Clean samples Vikas April
Develop sample cleaning procedure
Make sure all chemicals for sample cleaning procedure are available
Improve the vacuum
Test the pressure sensor Marjolein Oct
Get new O-rings
Test vacuum per compartment (just pump, then pump and monochromator, etc.)
Improve in-vacuum SiPM connections (SiPM to wire and wire to feedthrough) so easy switching of SiPMs is possible but also good connection
Put together a summary of previous VUV reflectance measurements (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE Vikas
Make SiPM cable connections (ask electronics if soldering is possible, otherwise use pins) Tomas/Yannick done May
Test alignment new sample holder Tomas/Yannick done May
Clean setup done April
Sort out data storage with PDP group Tina/Marjolein done Feb
Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic) Marjolein done March
Re-configure the sample chamber for reflectance measurements Marjolein/Vikas done March
CAD model of setup; study geometry of light paths and sample/detectors Marjolein done
Move setup back to old lab all done March
Summarise optics inputs to MC in DUNE, and if available, other LAr detectors Marjolein done


Vacations and Meetings

General:

Group outing October 30/31

NNV meeting November 3

Tina:

  • August 28 - Sept 1 TAUP
  • Sept 18-22: LIDINE
  • Sept 25-29: IOP+Xenon collaboration meeting

Marjolein:

  • November 6 - December 16: Fermilab

Vikas:

  • November 8 - Dec 3, vacation


Pranati:

  • Expected start October 16

Mano (AUC BSc)/uniformity of light ball, dwarf analysis

  • Start September 4th, End December 18; 1 day/week
  • Availability Wednesdays 9am - 3pm, Thursday after 2pm
  • October 23-27: lecture free week

Coryenne (MSc)/reflectance measurement, cooling system

  • Start September 13
  • Oct 23-27: Vacation

Outdated below here

Task (move and January DC project) DRI dependencies Status Deadline
Pack all tools and parts that belong to the VUV setup in boxes Emily and Marjolein Boxes arrived Done Dec 13
Put the DAQ for the SiPM and the temperature readout equipment together so the complete system necessary for DC rate measurement can be moved independently. Room is TBD Emily and Marjolein Done Dec 13
Check if the VUV setup table fits through the corridor. If not, we have to disassemble so let's hope it fits. Marjolein Done Dec 12
Identify dark box to be used for DC measurement. Tina Dec 16
Test Peltier element and plan how to integrate it in the dark box and with the SiPM and PT100 Power supply for Peltier element Dec 16
Set up PT100 read-out and SiPM read-out through dark box Vikas (Lucia, Tina) Done Jan 12
Develop procedure to keep SiPM at specific temperature for ~15 minutes at a time (what voltage/current is needed?) and determine if a large enough temperature range is accessible with this element (if not, ask Tina to order the next size up) Vikas (Lucia) Temperature range might need to be increased for future dark box measurements. Unlikely to go below 0° for full setup atm. Done Jan 13
Script to plot DC rates as function of temperature Marjolein (Lucia) Done Jan 20
Script to fit the "DC rate versus temperature" curve Lucia Done Jan 27
Task (hardware) DRI Main dependencies Status Finish by
Read out pressure sensor and debug code Marjolein Vikas Done Sept 23
Check if lamp noise is still there/what it looks like now Emily Done Sept 23
Cooling system for sample/SiPM planning and component ordering (design, simulations, quotes for components) Emily Done Sept 27
Get SiPM signal out of vacuum (1 channel for now, 9 channels eventually) Emily Done Oct 1
Leak check vacuum system and fix leaks

- clean vacuum chamber

- pump down and check pressure + pump-down time

- tighten bolts on monochromator and feedthroughs

- pump down and check pressure + pump-down time

Marjolein (Jasmijn) Pressure read-out working Done Oct 1
SiPM signal output

- Adjust readout frequency cutoffs (Hans' one-channel board)

- Test SiPM signal (noise) when pump and lamp are on, fix if necessary

- Connect and test the Zurich board - signal-to-noise

- Figure out what changes if any are needed to bias and read the fluorescence measurement SiPMs

- Design and get a SiPM connector plug for inside the vacuum

Emily Vacuum/light leak eliminated Done Oct 7 (Oct 20 for the new board)
Design SiPM array holder for fluorescence Marjolein/Emily Preliminary analysis of sensitivity needs finished Done Nov
Design SiPM array holder for reflectance/transmission Marjolein Analysis of physics goals finished Done Nov
Get SiPM signal to disk such that single-pulse rates can be measured (programmable CAEN digitizer for now, V1720 with XAMS-like read-out later) Marjolein (Jasmijn) Nov
Get sample holder (fluorescence design) built Emily Done Nov
Calibrations start Emily Marjolein Minimum working setup Dec
Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation) Emily Delivery of components/LN2 approval for lab Dec/Jan
Set up slow-control read-out and data storage, monochromator motor control Vikas -> ? Jan
Task (review and calculations) DRI Status Finish by
Estimate sensitivity needs for observation of the PTFE fluorescence measurement in the setup (preliminary, rough calculation) Emily (Jasmijn) Done Oct 28
Review past reflectivity setup design/sample holder (that had XENON in mind) in light of DUNE needs Marjolein Done Oct 30

Link to measurement procedure document: File:Measurement procedure.pdf

Update August 2022

PhDs:

Vikas: At CERN until end of the year. Will work a little bit with CT technician to get code and slow control in good shape.

Emily: Focus on getting the SiPM signals to the digitisers. Work with Hans from ET department.

Marjolein: Focus on getting the data from the digitisers into a good format. Work with Maricke/Joran to copy XAMS read-out software.

Undergraduates:

Ilze (start Sept 12, HBO internship): Get vacuum chamber working correctly, design improved SiPM holder. Measure beam intensity as function of distance using SiPM

Jasmijn (start Sept, AUC capstone project): Measure lamp spectrum. Based on expected PTFE fluorescence efficiency, calculate amount of light expected on SiPM, and whether that is measurable over the DC rate

Not free: Monday 11-14, Tuesday 11-13, Wednesday 9-12, Thursday 16-18, Friday 16-18


Lucia (January 2023): Measure the SiPM DC rate as a function of temperature. About 6 hours per day.

Projects for distibution
  1. SiPM array and holder --> reflectivity design (modelling/ mechanical viability/ feedthrough positioning)
  2. SiPM array and holder --> fluorescence design (modelling/ mechanical viability/ movement inside chamber/ solid angle coverage)
  3. Cooling system for sample holder/SiPMs (CAD/COMSOL/ LN2 bath)
  4. Put together a plan for data taking