Difference between revisions of "VUVProjectsPlanning"
| Line 1: | Line 1: | ||
| − | === Update   | + | |
| + | === Update March 2023 ===  | ||
{| class="wikitable"  | {| class="wikitable"  | ||
|+  | |+  | ||
| Line 30: | Line 31: | ||
|  | |  | ||
|Done  | |Done  | ||
| − | |Dec 1    | + | |Dec 1  | 
|-  | |-  | ||
|Gain characterization of SiPMs  | |Gain characterization of SiPMs  | ||
| Line 39: | Line 40: | ||
|-  | |-  | ||
|Measure excitation beam intensity as function of SiPM position and slit width  | |Measure excitation beam intensity as function of SiPM position and slit width  | ||
| − | |  | + | |Tomas  | 
|  | |  | ||
|  | |  | ||
| Line 55: | Line 56: | ||
|Done  | |Done  | ||
|Feb 4 or 7  | |Feb 4 or 7  | ||
| + | |-  | ||
| + | |Continue DN vs temp measurements  | ||
| + | |BSc internship students  | ||
| + | |  | ||
| + | |  | ||
| + | |End of June  | ||
|-  | |-  | ||
|Determine effect of exposure to radiation on fluorescence of plastics  | |Determine effect of exposure to radiation on fluorescence of plastics  | ||
| Line 66: | Line 73: | ||
|+  | |+  | ||
|-  | |-  | ||
| − | ! Task !! DRI !! Dependencies || Date  | + | ! Task !! DRI !! Dependencies  | 
| + | !Status|| Date  | ||
|-  | |-  | ||
| − | | Have sample storage box made (3D print) || Vikas ||   | + | | Have sample storage box made (3D print) || Vikas ||    | 
| + | |prototype done  | ||
| + | | Feb  | ||
|-  | |-  | ||
| − | | Sort out data storage with PDP group || Tina/Marjolein || done    | + | | Sort out data storage with PDP group || Tina/Marjolein ||   | 
| + | |done  | ||
| Feb  | | Feb  | ||
|-  | |-  | ||
| Line 76: | Line 87: | ||
|  | |  | ||
|  | |  | ||
| + | |moved to June  | ||
|  | |  | ||
|-  | |-  | ||
| − | | Set up V1730 digitisers/read-out computer || Marjolein || in progress    | + | | Set up V1730 digitisers/read-out computer || Marjolein ||   | 
| + | |in progress  | ||
| March  | | March  | ||
|-  | |-  | ||
|Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic)  | |Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic)  | ||
|Marjolein  | |Marjolein  | ||
| + | |  | ||
|in progress  | |in progress  | ||
|March  | |March  | ||
| Line 88: | Line 102: | ||
|Re-configure the sample chamber for reflectance measurements  | |Re-configure the sample chamber for reflectance measurements  | ||
|Marjolein/Vikas  | |Marjolein/Vikas  | ||
| + | |  | ||
|done  | |done  | ||
|March  | |March  | ||
| Line 93: | Line 108: | ||
|Set up upgraded slow control system  | |Set up upgraded slow control system  | ||
|Vikas  | |Vikas  | ||
| + | |  | ||
|  | |  | ||
|April  | |April  | ||
|-  | |-  | ||
| − | | CAD model of setup; study geometry of light paths and sample/detectors || Marjolein || in progress    | + | | CAD model of setup; study geometry of light paths and sample/detectors || Marjolein ||   | 
| + | |in progress  | ||
|    | |    | ||
|-  | |-  | ||
|Design dsub plug for use on vacuum side to make cable connections easier  | |Design dsub plug for use on vacuum side to make cable connections easier  | ||
| + | |  | ||
|  | |  | ||
|  | |  | ||
|  | |  | ||
|-  | |-  | ||
| − | |   | + | | Move setup back to old lab || all ||    | 
| + | | || March  | ||
|-  | |-  | ||
| − | |  ||  ||   | + | |  ||  ||    | 
| + | | ||    | ||
|-  | |-  | ||
| − | |   | + | | Put together a summary of previous VUV reflectance measurements (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE || Vikas ||    | 
| + | | ||  | ||
|-  | |-  | ||
| − | |   | + | | Summarise optics inputs to MC in DUNE, and if available, other LAr detectors || Marjolein ||    | 
| + | | ||    | ||
|-  | |-  | ||
| − | |  ||  ||   | + | |  ||  ||    | 
| + | | ||    | ||
|}  | |}  | ||
Revision as of 10:14, 13 March 2023
Update March 2023
| Projects | DRI | Main dependencies | Status | Finish by | 
|---|---|---|---|---|
| Measure fluorescence efficiency of PTFE | ||||
| Measure reflectance of cryostat components | Marjolein | |||
| Measure optical properties of Arapuca components | Vikas | |||
| Measure the spectrum of the D2 lamp | Jasmijn | Done | Dec 1 | |
| Gain characterization of SiPMs | ||||
| Measure excitation beam intensity as function of SiPM position and slit width | Tomas | |||
| Measure time stability of D2 lamp intensity | ||||
| DN vs temperature characterization of SiPMs | Lucia | Done | Feb 4 or 7 | |
| Continue DN vs temp measurements | BSc internship students | End of June | ||
| Determine effect of exposure to radiation on fluorescence of plastics | 
| Task | DRI | Dependencies | Status | Date | 
|---|---|---|---|---|
| Have sample storage box made (3D print) | Vikas | prototype done | Feb | |
| Sort out data storage with PDP group | Tina/Marjolein | done | Feb | |
| DN vs temperature characterization of VUV SiPMs | moved to June | |||
| Set up V1730 digitisers/read-out computer | Marjolein | in progress | March | |
| Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic) | Marjolein | in progress | March | |
| Re-configure the sample chamber for reflectance measurements | Marjolein/Vikas | done | March | |
| Set up upgraded slow control system | Vikas | April | ||
| CAD model of setup; study geometry of light paths and sample/detectors | Marjolein | in progress | ||
| Design dsub plug for use on vacuum side to make cable connections easier | ||||
| Move setup back to old lab | all | March | ||
| Put together a summary of previous VUV reflectance measurements (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE | Vikas | |||
| Summarise optics inputs to MC in DUNE, and if available, other LAr detectors | Marjolein | |||
Outdated below here
| Task (move and January DC project) | DRI | dependencies | Status | Deadline | 
|---|---|---|---|---|
| Emily and Marjolein | Boxes arrived | Done | Dec 13 | |
| Emily and Marjolein | Done | Dec 13 | ||
| Marjolein | Done | Dec 12 | ||
| Tina | Dec 16 | |||
| Power supply for Peltier element | Dec 16 | |||
| Vikas (Lucia, Tina) | Done | Jan 12 | ||
| Vikas (Lucia) | Temperature range might need to be increased for future dark box measurements. Unlikely to go below 0° for full setup atm. | Done | Jan 13 | |
| Marjolein (Lucia) | Done | Jan 20 | ||
| Lucia | Done | Jan 27 | ||
| Task (hardware) | DRI | Main dependencies | Status | Finish by | 
|---|---|---|---|---|
| Marjolein | Vikas | Done | Sept 23 | |
| Emily | Done | Sept 23 | ||
| Emily | Done | Sept 27 | ||
| Emily | Done | Oct 1 | ||
-  -  -  -   | 
Marjolein (Jasmijn) | Pressure read-out working | Done | Oct 1 | 
| SiPM signal output
 -  -  -  -  -   | 
Emily | Vacuum/light leak eliminated | Done | Oct 7 (Oct 20 for the new board) | 
| Design SiPM array holder for fluorescence | Marjolein/Emily | Preliminary analysis of sensitivity needs finished | Started | Nov | 
| Design SiPM array holder for reflectance/transmission | Marjolein | Analysis of physics goals finished | Nov | |
| Marjolein (Jasmijn) | Nov | |||
| Emily | Done | Nov | ||
| Emily Marjolein | Minimum working setup | Dec | ||
| Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation) | Emily | Delivery of components/LN2 approval for lab | Dec/Jan | |
| Set up slow-control read-out and data storage, monochromator motor control | Vikas -> ? | Jan | 
| Task (review and calculations) | DRI | Status | Finish by | 
|---|---|---|---|
| Emily (Jasmijn) | Done | Oct 28 | |
| Marjolein | Done | Oct 30 | |
Link to measurement procedure document: File:Measurement procedure.pdf
Update August 2022
PhDs:
Vikas: At CERN until end of the year. Will work a little bit with CT technician to get code and slow control in good shape.
Emily: Focus on getting the SiPM signals to the digitisers. Work with Hans from ET department.
Marjolein: Focus on getting the data from the digitisers into a good format. Work with Maricke/Joran to copy XAMS read-out software.
Undergraduates:
Ilze (start Sept 12, HBO internship): Get vacuum chamber working correctly, design improved SiPM holder. Measure beam intensity as function of distance using SiPM
Jasmijn (start Sept, AUC capstone project): Measure lamp spectrum. Based on expected PTFE fluorescence efficiency, calculate amount of light expected on SiPM, and whether that is measurable over the DC rate
Not free: Monday 11-14, Tuesday 11-13, Wednesday 9-12, Thursday 16-18, Friday 16-18
Lucia (January 2023): Measure the SiPM DC rate as a function of temperature. About 6 hours per day.
Projects for distibution
- SiPM array and holder --> reflectivity design (modelling/ mechanical viability/ feedthrough positioning)
 - SiPM array and holder --> fluorescence design (modelling/ mechanical viability/ movement inside chamber/ solid angle coverage)
 - Cooling system for sample holder/SiPMs (CAD/COMSOL/ LN2 bath)
 - Put together a plan for data taking
 
Vacations
Tina:
- Vacation: December 20th to January 8th
 - Collaboration meeting (DUNE): January 24-27
 - Collaboration meeting (XENON): January 31 - Feb 4
 
Marjolein:
- Vacation: December 16-January 16th
 - Collaboration meeting: January 23-27 (maybe a few days more)
 
Emily:
- Vacation: December 23rd to January 9th
 - Collaboration meeting: January 30th - February 3rd
 
Vikas: