Difference between revisions of "VUVProjectsPlanning"
Jump to navigation
Jump to search
(Update for 2024) |
|||
Line 73: | Line 73: | ||
| | | | ||
|- | |- | ||
− | |Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit | + | |Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare |
|Anna/Joost | |Anna/Joost | ||
| | | | ||
| | | | ||
|- | |- | ||
− | |Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS | + | |Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET |
− | | | + | |Noor/Joost |
| | | | ||
| | | | ||
|- | |- | ||
− | |Procure SiPM read-out board - 4 channels, S13360-6050PE/CS SiPMs - from ET | + | |Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic |
|Anna/Joost | |Anna/Joost | ||
|Previous SiPM test results | |Previous SiPM test results | ||
Line 89: | Line 89: | ||
|- | |- | ||
|Install and test 16-channel digitiser for XAMS | |Install and test 16-channel digitiser for XAMS | ||
− | |AP | + | |AP/Marieke |
− | | | + | |XAMS test run finished? |
| | | | ||
|- | |- | ||
Line 98: | Line 98: | ||
| | | | ||
|- | |- | ||
− | |Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve) | + | |Measure rest-gas composition in XAMS |
− | |Joost | + | |Noor |
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |Measure outgassing from PTFE | ||
+ | |Noor | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal. | ||
+ | |Joost/Noor | ||
| | | | ||
| | | | ||
Line 124: | Line 134: | ||
| | | | ||
|- | |- | ||
+ | |Analyse data from XAMS. Ask Carlo for help | ||
| | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |Analyse data from VULCAN. Ask Marjolein for help | ||
| | | | ||
| | | |
Revision as of 09:28, 11 September 2024
Update September 2024 - joint XAMS project
Projects | DRI | Main dependencies | Status | Finish by |
---|---|---|---|---|
Finalise reflectivity measurements of DUNE cryostat components | Marjolein/Vikas/Corryenne | Oct 2024 | ||
Fluorescence measurements in VULCAN | Anna | |||
Delayed electrons and g1 in XAMS | Joost | |||
Calibration of XAMS | Noor | |||
Reflectance of DUNE cryostat components | Corryenne | June 2024 | ||
Measure time stability of D2 lamp intensity | ||||
Determine effect of exposure to radiation on fluorescence of plastics |
Task - hardware | DRI | Dependencies | Status |
---|---|---|---|
Design SiPM holder for fluorescence measurements | Anna | Reflectivity study finished | |
Set up and test cooling system for samples, SiPM | Anna | ||
Fully reconfigure VULCAN for fluorescence measurements | Anna | cooling system and SiPM holder ready | |
Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare | Anna/Joost | ||
Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET | Noor/Joost | ||
Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic | Anna/Joost | Previous SiPM test results | |
Install and test 16-channel digitiser for XAMS | AP/Marieke | XAMS test run finished? | |
Set up XAMS to start a run | Tobias | ||
Measure rest-gas composition in XAMS | Noor | ||
Measure outgassing from PTFE | Noor | ||
Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal. | Joost/Noor |
Task - software/analysis | DRI | Dependencies | Status |
---|---|---|---|
XAMS MC - simulate calibration sources, g1 expectation | AP/? | ||
VULCAN MC - simulate photon paths/coverage fraction of SiPMs | Anna | ||
Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN | Pranati | ||
Analyse data from XAMS. Ask Carlo for help | |||
Analyse data from VULCAN. Ask Marjolein for help |
Vacations, Meetings, and general availability of people
General:
Tina:
AP:
- Working from home in Sept.
Marjolein:
Vikas:
Pranati:
Anna (MSc, Sept 2024 - July 2025):
Joost (MSc, Sept 2024 - July 2025):
- Lectures on Monday 9-11
Noor (BSc internship, Sept 2024 - Jan 2025):