Difference between revisions of "Setup"

From Vacuum Ultra Violet
Jump to navigation Jump to search
 
Line 1: Line 1:
 +
==== Vacuum chamber ====
 +
 +
* <s>Clean and rebuild experimental setup</s>
 +
 +
* <s>Install venting valve</s>
 +
* Test vacuum
  
 
==== Readout box ====
 
==== Readout box ====
Line 7: Line 13:
 
==== SiPM ====
 
==== SiPM ====
  
* Find screw for SiPM rotation arm
+
* <s>Find screw for SiPM rotation arm</s>
 
* Soldering of the wires should be redone
 
* Soldering of the wires should be redone
* Marking the SiPM wires
+
* Marking the SiPM wires  
 +
** Use crimps?
 
* Test other SiPMs (some are broken)
 
* Test other SiPMs (some are broken)
 
* Design/Create 3x3 SiPM array
 
* Design/Create 3x3 SiPM array
Line 16: Line 23:
  
 
* Install temperature sensor
 
* Install temperature sensor
* Install vacuum valve
+
* <s>Install vacuum valve</s>
 
* Install new digitizer?
 
* Install new digitizer?

Latest revision as of 13:13, 1 February 2024

Vacuum chamber

  • Clean and rebuild experimental setup
  • Install venting valve
  • Test vacuum

Readout box

  • Current readout from Hans had complications and is being fixed by Julio at the moment
  • We are waiting for a new readout box that is being made

SiPM

  • Find screw for SiPM rotation arm
  • Soldering of the wires should be redone
  • Marking the SiPM wires
    • Use crimps?
  • Test other SiPMs (some are broken)
  • Design/Create 3x3 SiPM array

Other (optional) tasks

  • Install temperature sensor
  • Install vacuum valve
  • Install new digitizer?