Difference between revisions of "VUVProjectsPlanning"
(→Update April 2023: Update planning) |
|||
Line 81: | Line 81: | ||
! Task !! DRI !! Dependencies | ! Task !! DRI !! Dependencies | ||
!Status|| Date | !Status|| Date | ||
+ | |- | ||
+ | |Make SiPM cable connections (ask electronics if soldering is possible, otherwise use pins) | ||
+ | |Tomas/Yannick | ||
+ | | | ||
+ | |in progress | ||
+ | |May | ||
+ | |- | ||
+ | |Test alignment new sample holder | ||
+ | |Tomas/Yannick | ||
+ | | | ||
+ | | | ||
+ | |May | ||
+ | |- | ||
+ | | Set up V1730 digitisers/read-out computer || Marjolein || digitizers arrive | ||
+ | |testing | ||
+ | | March | ||
+ | |- | ||
+ | |Set up upgraded slow control system | ||
+ | |Vikas | ||
+ | | | ||
+ | | | ||
+ | |April | ||
|- | |- | ||
| Have sample storage box made (3D print) || Vikas || | | Have sample storage box made (3D print) || Vikas || | ||
|prototype done | |prototype done | ||
− | |||
− | |||
− | |||
− | |||
| Feb | | Feb | ||
|- | |- | ||
Line 96: | Line 114: | ||
| | | | ||
|- | |- | ||
− | | | + | |<s>Clean setup</s> |
− | | | + | | |
− | | | + | | |
+ | |done | ||
+ | |April | ||
+ | |- | ||
+ | | <s>Sort out data storage with PDP group</s> || Tina/Marjolein || | ||
+ | |done | ||
+ | | Feb | ||
|- | |- | ||
|<s>Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic)</s> | |<s>Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic)</s> | ||
Line 111: | Line 135: | ||
|done | |done | ||
|March | |March | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| <s>CAD model of setup; study geometry of light paths and sample/detectors</s> || Marjolein || | | <s>CAD model of setup; study geometry of light paths and sample/detectors</s> || Marjolein || | ||
|done | |done | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| <s>Move setup back to old lab</s> || all || | | <s>Move setup back to old lab</s> || all || |
Revision as of 14:07, 4 May 2023
Update April 2023
Projects | DRI | Main dependencies | Status | Finish by |
---|---|---|---|---|
Measure fluorescence efficiency of PTFE | ||||
Measure reflectance of cryostat components | Marjolein | |||
Measure optical properties of Arapuca components | Vikas | |||
Measure the spectrum of the D2 lamp | Jasmijn | Done | Dec 1 | |
Gain characterization of SiPMs | ||||
Measure excitation beam intensity as function of SiPM position and slit width | Tomas | June 30 | ||
Measure reflectivity of DUNE cryostat sample | Yannick | June 16 | ||
Measure time stability of D2 lamp intensity | ||||
DN vs temperature characterization of SiPMs | Lucia | Done | Feb 4 or 7 | |
Continue DN vs temp measurements | BSc internship students | End of June | ||
Determine effect of exposure to radiation on fluorescence of plastics |
Task | DRI | Dependencies | Status | Date |
---|---|---|---|---|
Make SiPM cable connections (ask electronics if soldering is possible, otherwise use pins) | Tomas/Yannick | in progress | May | |
Test alignment new sample holder | Tomas/Yannick | May | ||
Set up V1730 digitisers/read-out computer | Marjolein | digitizers arrive | testing | March |
Set up upgraded slow control system | Vikas | April | ||
Have sample storage box made (3D print) | Vikas | prototype done | Feb | |
DN vs temperature characterization of VUV SiPMs | moved to June | |||
done | April | |||
Tina/Marjolein | done | Feb | ||
Marjolein | done | March | ||
Marjolein/Vikas | done | March | ||
Marjolein | done | |||
all | done | March | ||
Make sure all chemicals for sample cleaning procedure are available; clean samples | Vikas | April | ||
Put together a summary of previous VUV reflectance measurements (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE | Vikas | |||
Marjolein | done | |||
Vacations and Meetings
General:
CAN meeting: June 20-21
Tina:
- April 5 - April 11
- April 4 - 5 (Veldhoven)
- April 17 - 18?
- May 15-17 DARWIN collaboration meeting
- June 20-21 CAN
Marjolein:
- April 3 and 17 (taking charge of your phD)
- April 4 - 5 (Veldhoven)
- April 12 - 14 (topical lectures)
- May 15-16 Jamboree
- June 20-21 CAN
Vikas:
- May 22-26: DUNE meeting
- May 15-16 Jamboree
- June 20-21 CAN
Tomas and Yannik:
- May 1-5 lecture-free week
Outdated below here
Task (move and January DC project) | DRI | dependencies | Status | Deadline |
---|---|---|---|---|
Emily and Marjolein | Boxes arrived | Done | Dec 13 | |
Emily and Marjolein | Done | Dec 13 | ||
Marjolein | Done | Dec 12 | ||
Tina | Dec 16 | |||
Power supply for Peltier element | Dec 16 | |||
Vikas (Lucia, Tina) | Done | Jan 12 | ||
Vikas (Lucia) | Temperature range might need to be increased for future dark box measurements. Unlikely to go below 0° for full setup atm. | Done | Jan 13 | |
Marjolein (Lucia) | Done | Jan 20 | ||
Lucia | Done | Jan 27 | ||
Task (hardware) | DRI | Main dependencies | Status | Finish by |
---|---|---|---|---|
Marjolein | Vikas | Done | Sept 23 | |
Emily | Done | Sept 23 | ||
Emily | Done | Sept 27 | ||
Emily | Done | Oct 1 | ||
- - - - |
Marjolein (Jasmijn) | Pressure read-out working | Done | Oct 1 |
SiPM signal output
- - - - - |
Emily | Vacuum/light leak eliminated | Done | Oct 7 (Oct 20 for the new board) |
Marjolein/Emily | Preliminary analysis of sensitivity needs finished | Done | Nov | |
Marjolein | Analysis of physics goals finished | Done | Nov | |
Marjolein (Jasmijn) | Nov | |||
Emily | Done | Nov | ||
Emily Marjolein | Minimum working setup | Dec | ||
Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation) | Emily | Delivery of components/LN2 approval for lab | Dec/Jan | |
Set up slow-control read-out and data storage, monochromator motor control | Vikas -> ? | Jan |
Task (review and calculations) | DRI | Status | Finish by |
---|---|---|---|
Emily (Jasmijn) | Done | Oct 28 | |
Marjolein | Done | Oct 30 | |
Link to measurement procedure document: File:Measurement procedure.pdf
Update August 2022
PhDs:
Vikas: At CERN until end of the year. Will work a little bit with CT technician to get code and slow control in good shape.
Emily: Focus on getting the SiPM signals to the digitisers. Work with Hans from ET department.
Marjolein: Focus on getting the data from the digitisers into a good format. Work with Maricke/Joran to copy XAMS read-out software.
Undergraduates:
Ilze (start Sept 12, HBO internship): Get vacuum chamber working correctly, design improved SiPM holder. Measure beam intensity as function of distance using SiPM
Jasmijn (start Sept, AUC capstone project): Measure lamp spectrum. Based on expected PTFE fluorescence efficiency, calculate amount of light expected on SiPM, and whether that is measurable over the DC rate
Not free: Monday 11-14, Tuesday 11-13, Wednesday 9-12, Thursday 16-18, Friday 16-18
Lucia (January 2023): Measure the SiPM DC rate as a function of temperature. About 6 hours per day.
Projects for distibution
- SiPM array and holder --> reflectivity design (modelling/ mechanical viability/ feedthrough positioning)
- SiPM array and holder --> fluorescence design (modelling/ mechanical viability/ movement inside chamber/ solid angle coverage)
- Cooling system for sample holder/SiPMs (CAD/COMSOL/ LN2 bath)
- Put together a plan for data taking