Difference between revisions of "VUVProjectsPlanning"
Line 1: | Line 1: | ||
− | === Update | + | |
+ | === Update March 2023 === | ||
{| class="wikitable" | {| class="wikitable" | ||
|+ | |+ | ||
Line 30: | Line 31: | ||
| | | | ||
|Done | |Done | ||
− | |Dec 1 | + | |Dec 1 |
|- | |- | ||
|Gain characterization of SiPMs | |Gain characterization of SiPMs | ||
Line 39: | Line 40: | ||
|- | |- | ||
|Measure excitation beam intensity as function of SiPM position and slit width | |Measure excitation beam intensity as function of SiPM position and slit width | ||
− | | | + | |Tomas |
| | | | ||
| | | | ||
Line 55: | Line 56: | ||
|Done | |Done | ||
|Feb 4 or 7 | |Feb 4 or 7 | ||
+ | |- | ||
+ | |Continue DN vs temp measurements | ||
+ | |BSc internship students | ||
+ | | | ||
+ | | | ||
+ | |End of June | ||
|- | |- | ||
|Determine effect of exposure to radiation on fluorescence of plastics | |Determine effect of exposure to radiation on fluorescence of plastics | ||
Line 66: | Line 73: | ||
|+ | |+ | ||
|- | |- | ||
− | ! Task !! DRI !! Dependencies || Date | + | ! Task !! DRI !! Dependencies |
+ | !Status|| Date | ||
|- | |- | ||
− | | Have sample storage box made (3D print) || Vikas || | + | | Have sample storage box made (3D print) || Vikas || |
+ | |prototype done | ||
+ | | Feb | ||
|- | |- | ||
− | | Sort out data storage with PDP group || Tina/Marjolein || done | + | | Sort out data storage with PDP group || Tina/Marjolein || |
+ | |done | ||
| Feb | | Feb | ||
|- | |- | ||
Line 76: | Line 87: | ||
| | | | ||
| | | | ||
+ | |moved to June | ||
| | | | ||
|- | |- | ||
− | | Set up V1730 digitisers/read-out computer || Marjolein || in progress | + | | Set up V1730 digitisers/read-out computer || Marjolein || |
+ | |in progress | ||
| March | | March | ||
|- | |- | ||
|Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic) | |Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic) | ||
|Marjolein | |Marjolein | ||
+ | | | ||
|in progress | |in progress | ||
|March | |March | ||
Line 88: | Line 102: | ||
|Re-configure the sample chamber for reflectance measurements | |Re-configure the sample chamber for reflectance measurements | ||
|Marjolein/Vikas | |Marjolein/Vikas | ||
+ | | | ||
|done | |done | ||
|March | |March | ||
Line 93: | Line 108: | ||
|Set up upgraded slow control system | |Set up upgraded slow control system | ||
|Vikas | |Vikas | ||
+ | | | ||
| | | | ||
|April | |April | ||
|- | |- | ||
− | | CAD model of setup; study geometry of light paths and sample/detectors || Marjolein || in progress | + | | CAD model of setup; study geometry of light paths and sample/detectors || Marjolein || |
+ | |in progress | ||
| | | | ||
|- | |- | ||
|Design dsub plug for use on vacuum side to make cable connections easier | |Design dsub plug for use on vacuum side to make cable connections easier | ||
+ | | | ||
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
− | | | + | | Move setup back to old lab || all || |
+ | | || March | ||
|- | |- | ||
− | | || || | + | | || || |
+ | | || | ||
|- | |- | ||
− | | | + | | Put together a summary of previous VUV reflectance measurements (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE || Vikas || |
+ | | || | ||
|- | |- | ||
− | | | + | | Summarise optics inputs to MC in DUNE, and if available, other LAr detectors || Marjolein || |
+ | | || | ||
|- | |- | ||
− | | || || | + | | || || |
+ | | || | ||
|} | |} | ||
Revision as of 10:14, 13 March 2023
Update March 2023
Projects | DRI | Main dependencies | Status | Finish by |
---|---|---|---|---|
Measure fluorescence efficiency of PTFE | ||||
Measure reflectance of cryostat components | Marjolein | |||
Measure optical properties of Arapuca components | Vikas | |||
Measure the spectrum of the D2 lamp | Jasmijn | Done | Dec 1 | |
Gain characterization of SiPMs | ||||
Measure excitation beam intensity as function of SiPM position and slit width | Tomas | |||
Measure time stability of D2 lamp intensity | ||||
DN vs temperature characterization of SiPMs | Lucia | Done | Feb 4 or 7 | |
Continue DN vs temp measurements | BSc internship students | End of June | ||
Determine effect of exposure to radiation on fluorescence of plastics |
Task | DRI | Dependencies | Status | Date |
---|---|---|---|---|
Have sample storage box made (3D print) | Vikas | prototype done | Feb | |
Sort out data storage with PDP group | Tina/Marjolein | done | Feb | |
DN vs temperature characterization of VUV SiPMs | moved to June | |||
Set up V1730 digitisers/read-out computer | Marjolein | in progress | March | |
Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic) | Marjolein | in progress | March | |
Re-configure the sample chamber for reflectance measurements | Marjolein/Vikas | done | March | |
Set up upgraded slow control system | Vikas | April | ||
CAD model of setup; study geometry of light paths and sample/detectors | Marjolein | in progress | ||
Design dsub plug for use on vacuum side to make cable connections easier | ||||
Move setup back to old lab | all | March | ||
Put together a summary of previous VUV reflectance measurements (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE | Vikas | |||
Summarise optics inputs to MC in DUNE, and if available, other LAr detectors | Marjolein | |||
Outdated below here
Task (move and January DC project) | DRI | dependencies | Status | Deadline |
---|---|---|---|---|
Emily and Marjolein | Boxes arrived | Done | Dec 13 | |
Emily and Marjolein | Done | Dec 13 | ||
Marjolein | Done | Dec 12 | ||
Tina | Dec 16 | |||
Power supply for Peltier element | Dec 16 | |||
Vikas (Lucia, Tina) | Done | Jan 12 | ||
Vikas (Lucia) | Temperature range might need to be increased for future dark box measurements. Unlikely to go below 0° for full setup atm. | Done | Jan 13 | |
Marjolein (Lucia) | Done | Jan 20 | ||
Lucia | Done | Jan 27 | ||
Task (hardware) | DRI | Main dependencies | Status | Finish by |
---|---|---|---|---|
Marjolein | Vikas | Done | Sept 23 | |
Emily | Done | Sept 23 | ||
Emily | Done | Sept 27 | ||
Emily | Done | Oct 1 | ||
- - - - |
Marjolein (Jasmijn) | Pressure read-out working | Done | Oct 1 |
SiPM signal output
- - - - - |
Emily | Vacuum/light leak eliminated | Done | Oct 7 (Oct 20 for the new board) |
Design SiPM array holder for fluorescence | Marjolein/Emily | Preliminary analysis of sensitivity needs finished | Started | Nov |
Design SiPM array holder for reflectance/transmission | Marjolein | Analysis of physics goals finished | Nov | |
Marjolein (Jasmijn) | Nov | |||
Emily | Done | Nov | ||
Emily Marjolein | Minimum working setup | Dec | ||
Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation) | Emily | Delivery of components/LN2 approval for lab | Dec/Jan | |
Set up slow-control read-out and data storage, monochromator motor control | Vikas -> ? | Jan |
Task (review and calculations) | DRI | Status | Finish by |
---|---|---|---|
Emily (Jasmijn) | Done | Oct 28 | |
Marjolein | Done | Oct 30 | |
Link to measurement procedure document: File:Measurement procedure.pdf
Update August 2022
PhDs:
Vikas: At CERN until end of the year. Will work a little bit with CT technician to get code and slow control in good shape.
Emily: Focus on getting the SiPM signals to the digitisers. Work with Hans from ET department.
Marjolein: Focus on getting the data from the digitisers into a good format. Work with Maricke/Joran to copy XAMS read-out software.
Undergraduates:
Ilze (start Sept 12, HBO internship): Get vacuum chamber working correctly, design improved SiPM holder. Measure beam intensity as function of distance using SiPM
Jasmijn (start Sept, AUC capstone project): Measure lamp spectrum. Based on expected PTFE fluorescence efficiency, calculate amount of light expected on SiPM, and whether that is measurable over the DC rate
Not free: Monday 11-14, Tuesday 11-13, Wednesday 9-12, Thursday 16-18, Friday 16-18
Lucia (January 2023): Measure the SiPM DC rate as a function of temperature. About 6 hours per day.
Projects for distibution
- SiPM array and holder --> reflectivity design (modelling/ mechanical viability/ feedthrough positioning)
- SiPM array and holder --> fluorescence design (modelling/ mechanical viability/ movement inside chamber/ solid angle coverage)
- Cooling system for sample holder/SiPMs (CAD/COMSOL/ LN2 bath)
- Put together a plan for data taking
Vacations
Tina:
- Vacation: December 20th to January 8th
- Collaboration meeting (DUNE): January 24-27
- Collaboration meeting (XENON): January 31 - Feb 4
Marjolein:
- Vacation: December 16-January 16th
- Collaboration meeting: January 23-27 (maybe a few days more)
Emily:
- Vacation: December 23rd to January 9th
- Collaboration meeting: January 30th - February 3rd
Vikas: