Difference between revisions of "VUVProjectsPlanning"
Line 138: | Line 138: | ||
| | | | ||
| | | | ||
+ | |Nov | ||
+ | |- | ||
+ | |<s>Get sample holder (fluorescence design) built</s> | ||
+ | |Emily | ||
+ | | | ||
+ | |Done | ||
|Nov | |Nov | ||
|- | |- | ||
Line 145: | Line 151: | ||
| | | | ||
|Dec | |Dec | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation) | |Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation) | ||
Line 157: | Line 157: | ||
| | | | ||
|Dec/Jan | |Dec/Jan | ||
− | | | + | |- |
|Set up slow-control read-out and data storage, monochromator motor control | |Set up slow-control read-out and data storage, monochromator motor control | ||
|Vikas -> ? | |Vikas -> ? |
Revision as of 13:12, 6 December 2022
Update September 2022
Task (measurements) | DRI | Main dependencies | Status | Finish by |
---|---|---|---|---|
Measure fluorescence efficiency of PTFE | Emily | |||
Measure reflectance of cryostat components | Marjolein | |||
Measure optical properties of Arapuca components | Vikas | |||
Measure the spectrum of the D2 lamp | Jasmijn | Dec 1 (?) | ||
Gain characterization of SiPMs | Jasmijn | |||
Measure excitation beam intensity as function of SiPM position and slit width | ||||
Measure time stability of D2 lamp intensity | ||||
DN vs temperature characterization of SiPMs | ||||
Determine effect of exposure to radiation on fluorescence of plastics |
Task (hardware) | DRI | Main dependencies | Status | Finish by |
---|---|---|---|---|
Marjolein | Vikas | Done | Sept 23 | |
Emily | Done | Sept 23 | ||
Emily | Done | Sept 27 | ||
Emily | Done | Oct 1 | ||
- - - - |
Marjolein (Jasmijn) | Pressure read-out working | Done | Oct 1 |
SiPM signal output
- - - - - |
Emily | Vacuum/light leak eliminated | Done | Oct 7 (Oct 20 for the new board) |
Design SiPM array holder for fluorescence | Marjolein | Preliminary analysis of sensitivity needs finished | Nov | |
Design SiPM array holder for reflectance/transmission | Marjolein | Analysis of physics goals finished | Nov | |
Marjolein (Jasmijn) | Nov | |||
Emily | Done | Nov | ||
Emily Marjolein | Minimum working setup | Dec | ||
Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation) | Emily | Delivery of components/LN2 approval for lab | Dec/Jan | |
Set up slow-control read-out and data storage, monochromator motor control | Vikas -> ? | Jan |
Task (review and calculations) | DRI | Status | Finish by |
---|---|---|---|
Estimate sensitivity needs of the PTFE fluorescence measurement (preliminary, rough calculation) | Emily (Jasmijn) | Oct 28 | |
Review past reflectivity setup design/sample holder (that had XENON in mind) in light of DUNE needs | Marjolein | Oct 30 | |
Update August 2022
PhDs:
Vikas: At CERN until end of the year. Will work a little bit with CT technician to get code and slow control in good shape.
Emily: Focus on getting the SiPM signals to the digitisers. Work with Hans from ET department.
Marjolein: Focus on getting the data from the digitisers into a good format. Work with Maricke/Joran to copy XAMS read-out software.
Undergraduates:
Ilze (start Sept 12, HBO internship): Get vacuum chamber working correctly, design improved SiPM holder. Measure beam intensity as function of distance using SiPM
Jasmijn (start Sept, AUC capstone project): Measure lamp spectrum. Based on expected PTFE fluorescence efficiency, calculate amount of light expected on SiPM, and whether that is measurable over the DC rate
Not free: Monday 11-14, Tuesday 11-13, Wednesday 9-12, Thursday 16-18, Friday 16-18
Lucia (January 2023): Measure the SiPM DC rate as a function of temperature
Projects for distibution
- SiPM array and holder --> reflectivity design (modelling/ mechanical viability/ feedthrough positioning)
- SiPM array and holder --> fluorescence design (modelling/ mechanical viability/ movement inside chamber/ solid angle coverage)
- Cooling system for sample holder/SiPMs (CAD/COMSOL/ LN2 bath)
- Put together a plan for data taking