Difference between revisions of "VUVProjectsPlanning"

From Vacuum Ultra Violet
Jump to navigation Jump to search
m (Reverted edits by Ebrookes@nikhef.nl (talk) to last revision by Pollmann@nikhef.nl)
Tag: Rollback
Line 69: Line 69:
 
!Status
 
!Status
 
!Finish by
 
!Finish by
|Cooling system for sample/SiPM planning and component ordering (design, simulations, quotes for components)
+
|-
 +
|Leak check vacuum system and fix leaks
 +
|Marjolein (Jasmijn)
 +
|Pressure read-out working
 +
|
 +
|Oct 1
 +
|-
 +
|Get sample holder (fluorescence design) built
 
|Emily
 
|Emily
 
|
 
|
 
|
 
|
|Sept 27
+
|Nov
 
|-
 
|-
|Get SiPM signal out of vacuum (1 channel for now, 9 channels eventually) (Readout levels to be set after light leak and lamp noise are eliminated)
+
|Cooling system for sample/SiPM planning and component ordering (design, simulations, quotes for components)
 
|Emily
 
|Emily
 
|
 
|
|Mostly done
 
|Sept 27 (Oct 10)
 
|-
 
|Leak check vacuum system and fix leaks
 
|Marjolein (Jasmijn)
 
|Pressure read-out working
 
 
|
 
|
|Oct 1
+
|Sept 27
 
|-
 
|-
 
|Design SiPM array holder for fluorescence
 
|Design SiPM array holder for fluorescence
 
|Emily
 
|Emily
 
|Preliminary analysis of sensitivity needs finished
 
|Preliminary analysis of sensitivity needs finished
|
 
|Oct 17
 
|-
 
|Get SiPM signal to disk such that single-pulse rates can be measured (programmable CAEN digitizer for now, V1720 with XAMS-like read-out later)
 
|Marjolein (Jasmijn)
 
|
 
 
|
 
|
 
|Oct 17
 
|Oct 17
Line 105: Line 100:
 
|Oct 30
 
|Oct 30
 
|-
 
|-
 +
|Get SiPM signal out of vacuum (1 channel for now, 9 channels eventually)
 +
|Emily
 +
|
 +
|Mostly done
 +
|Sept 27
 
|-
 
|-
 
+
|Get SiPM signal to disk such that single-pulse rates can be measured (programmable CAEN digitizer for now, V1720 with XAMS-like read-out later)
|Get sample holder (fluorescence design) built
+
|Marjolein (Jasmijn)
|Emily
 
 
|
 
|
 
|
 
|
|Nov
+
|Oct 17
 
|-
 
|-
 
|Set up slow-control read-out and data storage, monochromator motor control
 
|Set up slow-control read-out and data storage, monochromator motor control

Revision as of 12:09, 20 September 2022

Update September 2022

Task (measurements) DRI Main dependencies Status Finish by
Measure fluorescence efficiency of PTFE Emily
Measure reflectance of cryostat components Marjolein
Measure optical properties of Arapuca components Vikas
Measure the spectrum of the D2 lamp Jasmijn Dec 1
Gain characterization of SiPMs Jasmijn
Measure excitation beam intensity as function of SiPM position and slit width
Measure time stability of D2 lamp intensity
DN vs temperature characterization of SiPMs
Determine effect of exposure to radiation on fluorescence of plastics
Task (hardware) DRI Main dependencies Status Finish by
Leak check vacuum system and fix leaks Marjolein (Jasmijn) Pressure read-out working Oct 1
Get sample holder (fluorescence design) built Emily Nov
Cooling system for sample/SiPM planning and component ordering (design, simulations, quotes for components) Emily Sept 27
Design SiPM array holder for fluorescence Emily Preliminary analysis of sensitivity needs finished Oct 17
Design SiPM array holder for reflectance/transmission Marjolein Analysis of physics goals finished Oct 30
Get SiPM signal out of vacuum (1 channel for now, 9 channels eventually) Emily Mostly done Sept 27
Get SiPM signal to disk such that single-pulse rates can be measured (programmable CAEN digitizer for now, V1720 with XAMS-like read-out later) Marjolein (Jasmijn) Oct 17
Set up slow-control read-out and data storage, monochromator motor control Vikas -> ? Dec
Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation) Emily Dec
Task (review and calculations) DRI Status Finish by
Estimate sensitivity needs of the PTFE fluorescence measurement (preliminary, rough calculation) Emily (Jasmijn) Oct 17
Review past reflectivity setup design/sample holder (that had XENON in mind) in light of DUNE needs Marjolein Oct 30


Update August 2022

PhDs:

Vikas: At CERN until end of the year. Will work a little bit with CT technician to get code and slow control in good shape.

Emily: Focus on getting the SiPM signals to the digitisers. Work with Hans from ET department.

Marjolein: Focus on getting the data from the digitisers into a good format. Work with Maricke/Joran to copy XAMS read-out software.

Undergraduates:

Ilze (start Sept 12, HBO internship): Get vacuum chamber working correctly, design improved SiPM holder. Measure beam intensity as function of distance using SiPM

Jasmijn (start Sept, AUC capstone project): Estimate fluorescence efficiency of PTFE based on Xenon lone-S2 rates. Measure lamp spectrum.

Not free: Monday 11-14, Tuesday 11-13, Wednesday 9-12, Thursday 16-18, Friday 16-18

Lucia (January 2023): Measure the SiPM DC rate as a function of temperature

Projects for distibution
  1. SiPM array and holder --> reflectivity design (modelling/ mechanical viability/ feedthrough positioning)
  2. SiPM array and holder --> fluorescence design (modelling/ mechanical viability/ movement inside chamber/ solid angle coverage)
  3. Cooling system for sample holder/SiPMs (CAD/COMSOL/ LN2 bath)
  4. Put together a plan for data taking