Difference between revisions of "Setup"
Jump to navigation
Jump to search
(Created page with " ==== Readout box ==== * Current readout from Hans had complications and is being fixed by Julio at the moment * We are waiting for a new readout box that is being made ====...") |
(→SiPM) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
| + | ==== Vacuum chamber ==== | ||
| + | |||
| + | * <s>Clean and rebuild experimental setup</s> | ||
| + | |||
| + | * <s>Install venting valve</s> | ||
| + | * Test vacuum | ||
==== Readout box ==== | ==== Readout box ==== | ||
| Line 7: | Line 13: | ||
==== SiPM ==== | ==== SiPM ==== | ||
| − | * Find screw for SiPM rotation arm | + | * <s>Find screw for SiPM rotation arm</s> |
* Soldering of the wires should be redone | * Soldering of the wires should be redone | ||
| − | * Marking the SiPM wires | + | * Marking the SiPM wires |
| + | ** Use crimps? | ||
* Test other SiPMs (some are broken) | * Test other SiPMs (some are broken) | ||
* Design/Create 3x3 SiPM array | * Design/Create 3x3 SiPM array | ||
| + | |||
| + | ==== Other (optional) tasks ==== | ||
| + | |||
| + | * Install temperature sensor | ||
| + | * <s>Install vacuum valve</s> | ||
| + | * Install new digitizer? | ||
Latest revision as of 13:13, 1 February 2024
Vacuum chamber
Clean and rebuild experimental setup
Install venting valve- Test vacuum
Readout box
- Current readout from Hans had complications and is being fixed by Julio at the moment
- We are waiting for a new readout box that is being made
SiPM
Find screw for SiPM rotation arm- Soldering of the wires should be redone
- Marking the SiPM wires
- Use crimps?
- Test other SiPMs (some are broken)
- Design/Create 3x3 SiPM array
Other (optional) tasks
- Install temperature sensor
Install vacuum valve- Install new digitizer?