Difference between revisions of "VUVProjectsPlanning"

From Vacuum Ultra Violet
Jump to navigation Jump to search
(Update planning)
m
 
(10 intermediate revisions by 6 users not shown)
Line 1: Line 1:
  
=== Update September 2023 ===
+
=== Update September 2024 - joint XAMS project ===
 
{| class="wikitable"
 
{| class="wikitable"
 
|+
 
|+
Line 9: Line 9:
 
!Finish by
 
!Finish by
 
|-
 
|-
|<u>Measure fluorescence efficiency of PTFE</u>
+
|<u>Finalise reflectivity measurements of DUNE cryostat components</u>
|Pranati
+
|Marjolein/Vikas/Corryenne
|
 
 
|
 
|
 
|
 
|
 +
|Oct 2024
 
|-
 
|-
|<u>Measure reflectance of cryostat components</u>
+
|Fluorescence measurements in VULCAN
|<u>Marjolein</u>
+
|<u>Anna</u>
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|<u>Measure optical properties of Arapuca components</u>
+
|<u>Delayed electrons and g1 in XAMS</u>
|<u>Vikas</u>
+
|<u>Joost</u>
 
|
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
|Reflectance of cryostat
+
|Calibration of XAMS
|Corryenne
+
|Noor
|
 
 
|
 
|
|June 2024
 
|-
 
|Light intensity in space and time
 
|Mano
 
 
|
 
|
 
|
 
|
|Nov 30
 
 
|-
 
|-
|Gain characterization of SiPMs
+
|Reflectance of DUNE cryostat components
|
+
|Corryenne
|
 
 
|
 
|
 
|
 
|
 +
|June 2024
 
|-
 
|-
 
|Measure time stability of D2 lamp intensity
 
|Measure time stability of D2 lamp intensity
Line 56: Line 50:
 
|
 
|
 
|
 
|
|-
 
|<u>Measure the spectrum of the D2 lamp</u>
 
|<u>Jasmijn</u>
 
|
 
|Done
 
|Dec 1
 
|-
 
|Measure excitation beam intensity as function of SiPM position and slit width
 
|Tomas
 
|
 
|Done
 
|June 30
 
|-
 
|Measure reflectivity of DUNE cryostat sample
 
|Yannick
 
|
 
|Done
 
|June 30
 
|-
 
|DN vs temperature characterization of SiPMs
 
|<u>Lucia</u>
 
|
 
|Done
 
|Feb 4 or 7
 
|-
 
|Continue DN vs temp measurements
 
|BSc internship students
 
|
 
|Done
 
|End of June
 
 
|}
 
|}
 
 
{| class="wikitable"
 
{| class="wikitable"
 
|+
 
|+
 +
!Task - hardware
 +
!DRI
 +
!Dependencies
 +
!Status
 
|-
 
|-
! Task !! DRI !! Dependencies
+
|Design SiPM holder for fluorescence measurements
!Status|| Date
+
|Anna
|-
+
|Reflectivity study finished
| '''Set up V1730 digitisers/read-out computer''' || Marjolein ||
 
|testing
 
| March
 
|-
 
|Set baseline and threshold for reading single p.e. signals
 
|
 
|
 
|
 
|
 
|-
 
|Test new V1720 digitiser and readout settings
 
|
 
|Digitiser arrives
 
|
 
|
 
|-
 
|Integrate waveform readout with slow control interface for data quality checks
 
|
 
|
 
|
 
|
 
|-
 
|'''Characterization of VUV SiPMs'''
 
|
 
|
 
|
 
|
 
|-
 
|Decide which SiPM(s) are going to be used for first measurements
 
|
 
|
 
|
 
|
 
|-
 
|Check what is on the CD we got with the SiPMs
 
|
 
|
 
|
 
 
|
 
|
 
|-
 
|-
|Dark noise vs temperature measurements
+
|Set up and test cooling system for samples, SiPM
|
+
|Anna
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Gain measurement
+
|Fully reconfigure VULCAN for fluorescence measurements
|
+
|Anna
|
+
|cooling system and SiPM holder ready
|
 
 
|
 
|
 
|-
 
|-
|'''Set up upgraded slow control system'''
+
|Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare
|Vikas
+
|Anna/Joost
|need to send back box
 
 
 
to Hans to figure out correct
 
 
 
pins for limit switches
 
|motor control works,
 
 
 
temperature setup tbd
 
|Sept
 
|-
 
|Get temperature sensor installed in the vacuum chamber
 
|
 
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|'''Characterization of light in chamber'''
+
|Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET
|
+
|Noor/Joost
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Redo measurements and analysis Tomas
+
|Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic
|
+
|Anna/Joost
|
+
|Previous SiPM test results
|
 
 
|
 
|
 
|-
 
|-
|Find slit sizes that are good for taking measurements at relevant wavelengths
+
|Install and test 16-channel digitiser for XAMS
|
+
|AP/Maricke
|
+
|XAMS test run finished?
 
|
 
|
|
 
|-
 
| '''Have sample storage box made (3D print)''' || Vikas ||
 
|prototype done
 
| Feb
 
 
|-
 
|-
|'''Clean samples'''
+
|Set up XAMS to start a run
|Vikas
+
|Tobias
 
|
 
|
 
|
 
|
|April
 
 
|-
 
|-
|Develop sample cleaning procedure
+
|Measure rest-gas composition in XAMS
|
+
|Noor
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Make sure all chemicals for sample cleaning procedure are available
+
|Measure outgassing from PTFE
|
+
|Noor
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|'''Improve the vacuum'''
+
|Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal.
|
+
|Joost/Noor
|
 
 
|
 
|
 
|
 
|
 +
|}
 +
{| class="wikitable"
 +
!Task - software/analysis
 +
!DRI
 +
!Dependencies
 +
!Status
 
|-
 
|-
|Test the pressure sensor
+
|XAMS MC - simulate calibration sources, g1 expectation
|Marjolein
+
|AP/?
 
|
 
|
 
|
 
|
|Oct
 
 
|-
 
|-
|Get new O-rings
+
|VULCAN MC - simulate photon paths/coverage fraction of SiPMs
|
+
|Anna
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|Test vacuum per compartment (just pump, then pump and monochromator, etc.)
+
|Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN
|
+
|Pranati
|
 
 
|
 
|
 
|
 
|
 
|-
 
|-
|'''Improve in-vacuum SiPM connections''' (SiPM to wire and wire to feedthrough) so easy switching of SiPMs is possible but also good connection
+
|Analyse data from XAMS. Ask Carlo for help
|
 
|
 
|
 
 
|
 
|
|-
 
| '''Put together a summary of previous VUV reflectance measurements''' (new site here), as well as any results for Al and/or similar metals, if time, also for PTFE || Vikas ||
 
|  ||
 
|-
 
|  ||  ||
 
|  ||
 
|-
 
|<s>Make SiPM cable connections (ask electronics if soldering is possible, otherwise use pins)</s>
 
|Tomas/Yannick
 
 
|
 
|
|done
 
|May
 
|-
 
|<s>Test alignment new sample holder</s>
 
|Tomas/Yannick
 
 
|
 
|
|done
 
|May
 
 
|-
 
|-
|<s>Clean setup</s>
+
|Analyse data from VULCAN. Ask Marjolein for help
 
|
 
|
 
|
 
|
|done
 
|April
 
|-
 
| <s>Sort out data storage with PDP group</s> || Tina/Marjolein ||
 
|done
 
| Feb
 
|-
 
|<s>Get SiPM holder made (3x3 mm SiPM, teflon or other suitable plastic)</s>
 
|Marjolein
 
|
 
|done
 
|March
 
|-
 
|<s>Re-configure the sample chamber for reflectance measurements</s>
 
|Marjolein/Vikas
 
 
|
 
|
|done
 
|March
 
|-
 
| <s>CAD model of setup; study geometry of light paths and sample/detectors</s> || Marjolein ||
 
|done
 
|
 
|-
 
| <s>Move setup back to old lab</s> || all ||
 
| done|| March
 
|-
 
| <s>Summarise optics inputs to MC in DUNE, and if available, other LAr detectors</s> || Marjolein ||
 
| done
 
|
 
|-
 
|  ||  ||
 
| ||
 
 
|}
 
|}
  
 +
=== Planning XAMS run September/October 2024 ===
 +
{| class="wikitable"
 +
|+
 +
!
 +
!What
 +
!Who
 +
|-
 +
|Friday 27-09-2024
 +
|RGA measurement
 +
GXe filling
  
=== Vacations and Meetings ===
+
Start cooling
General:
+
|Noor
 +
Tobias
  
Group outing October 30/31
+
Joost
  
NNV meeting November 3
+
Anna
 
+
|-
Tina:
+
|Monday 30-09-2024
 
+
|LXe filling
* August 28 - Sept 1 TAUP
+
|Noor
* Sept 18-22: LIDINE
+
Tobias
* Sept 25-29: IOP+Xenon collaboration meeting
 
*
 
  
Marjolein:
+
Joost
  
* November 6 - December 16: Fermilab<br />
+
Anna
  
Vikas:
+
Maricke
 
+
|-
* November 8 - Dec 3, vacation
+
|Tuesday 01-10-2024
*
+
|LXe filling
*
+
Lifetime measurement + analysis explanation/training
 
 
 
 
Pranati:
 
 
 
* Expected start October 16
 
 
 
Mano (AUC BSc)/uniformity of light ball, dwarf analysis
 
  
* Start September 4th, End December 18; 1 day/week
+
LED calibration + analysis explanation/training
* Availability Wednesdays 9am - 3pm, Thursday after 2pm
+
|Noor
* October 23-27: lecture free week
+
Tobias
  
Coryenne (MSc)/reflectance measurement, cooling system
+
Joost
  
* Start September 13
+
Anna
* Oct 23-27: Vacation
 
  
== Outdated below here ==
+
Maricke
{| class="wikitable"
 
|+
 
!Task (move and January DC project)
 
!DRI
 
!dependencies
 
!Status
 
!Deadline
 
 
|-
 
|-
|<s>Pack all tools and parts that belong to the VUV setup in boxes</s>
+
|Wednesday 02-10-2024 -
|Emily and Marjolein
+
Friday 04-10-2024
|Boxes arrived
+
|LED afterpulse measurements
|Done
+
|Maricke
|Dec 13
 
|-
 
|<s>Put the DAQ for the SiPM and the temperature readout equipment together so the complete system necessary for DC rate measurement can be moved independently. Room is TBD</s>
 
|Emily and Marjolein
 
|
 
|Done
 
|Dec 13
 
 
|-
 
|-
|<s>Check if the VUV setup table fits through the corridor. If not, we have to disassemble so let's hope it fits.</s>
+
|Monday 07-10-2024
|Marjolein
+
|''To be determined''
 
|
 
|
|Done
 
|Dec 12
 
 
|-
 
|-
|<s>Identify dark box to be used for DC measurement.</s>
 
|Tina
 
 
|
 
|
 +
|...
 
|
 
|
|Dec 16
 
 
|-
 
|-
|<s>Test Peltier element and plan how to integrate it in the dark box and with the SiPM and PT100</s>
 
 
|
 
|
|Power supply for Peltier element
+
|...
 
|
 
|
|Dec 16
 
 
|-
 
|-
|<s>Set up PT100 read-out and SiPM read-out through dark box</s>
+
|''No later than 25-10-2024''
|Vikas (Lucia, Tina)
+
|Recuperation
|
+
|Noor
|Done
+
Tobias
|Jan 12
+
 
|-
+
Joost
|<s>Develop procedure to keep SiPM at specific temperature for ~15 minutes at a time (what voltage/current is needed?) and determine if a large enough temperature range is accessible with this element (if not, ask Tina to order the next size up)</s>
+
 
|Vikas (Lucia)
+
Anna
|Temperature range might need to be increased for future dark box measurements. Unlikely to go below 0° for full setup atm.
+
 
|Done
+
Maricke (depends on the date)
|Jan 13
 
|-
 
|<s>Script to plot DC rates as function of temperature</s>
 
|Marjolein (Lucia)
 
|
 
|Done
 
|Jan 20
 
|-
 
|<s>Script to fit the "DC rate versus temperature" curve</s>
 
|Lucia
 
|
 
|Done
 
|Jan 27
 
 
|-
 
|-
|
 
|
 
 
|
 
|
 
|
 
|
 
|
 
|
 
|}
 
|}
{| class="wikitable"
 
|+
 
!Task (hardware)
 
!DRI
 
!Main dependencies
 
!Status
 
!Finish by
 
|-
 
|<s>Read out pressure sensor and debug code
 
|Marjolein
 
|Vikas
 
|Done
 
|Sept 23
 
|-
 
|<s>Check if lamp noise is still there/what it looks like now
 
|Emily
 
|
 
|Done
 
|Sept 23</s>
 
|-
 
|<s>Cooling system for sample/SiPM planning and component ordering (design, simulations, quotes for components)
 
|Emily
 
|
 
|Done
 
|Sept 27
 
|-
 
|<s>Get SiPM signal out of vacuum (1 channel for now, 9 channels eventually)</s>
 
|Emily
 
|
 
|Done
 
|Oct 1
 
|-
 
|<s>Leak check vacuum system and fix leaks</s>
 
- <s>clean vacuum chamber</s>
 
  
- <s>pump down and check pressure + pump-down time</s>
+
=== Vacations, Meetings, and general availability of people ===
 +
General:
 +
 
 +
Tina:
 +
 
 +
*
  
- <s>tighten bolts on monochromator and feedthroughs</s>
+
AP:
  
- <s>pump down and check pressure + pump-down time</s>
+
* Working from home in Sept.
|Marjolein (Jasmijn)
 
|Pressure read-out working
 
|Done
 
|Oct 1
 
|-
 
|SiPM signal output
 
- <s>Adjust readout frequency cutoffs (Hans' one-channel board)</s>
 
  
- <s>Test SiPM signal (noise) when pump and lamp are on, fix if necessary</s>
+
Marjolein:
  
- <s>Connect and test the Zurich board - signal-to-noise</s>
+
*Working from Bern from 18 to 24 September<br />
  
- <s>Figure out what changes if any are needed to bias and read the fluorescence measurement SiPMs</s>
+
Vikas:
  
- <s>Design and get a SiPM connector plug for inside the vacuum</s>
+
*
|Emily
+
*
|Vacuum/light leak eliminated
+
*
|Done
 
|Oct 7 (Oct 20 for the new board)
 
|-
 
|<s>Design SiPM array holder for fluorescence</s>
 
|Marjolein/Emily
 
|Preliminary analysis of sensitivity needs finished
 
|Done
 
|Nov
 
|-
 
|<s>Design SiPM array holder for reflectance/transmission</s>
 
|Marjolein
 
|Analysis of physics goals finished
 
|Done
 
|Nov
 
|-
 
|<s>Get SiPM signal to disk such that single-pulse rates can be measured (programmable CAEN digitizer for now, V1720 with XAMS-like read-out later)</s>
 
|Marjolein (Jasmijn)
 
|
 
|
 
|Nov
 
|-
 
|<s>Get sample holder (fluorescence design) built</s>
 
|Emily
 
|
 
|Done
 
|Nov
 
|-
 
|<s>Calibrations start</s>
 
|Emily Marjolein
 
|Minimum working setup
 
|
 
|Dec
 
|-
 
|Install cooling system (LN2 plate, thermal shorts, LN2 fill system, super insulation)
 
|Emily
 
|Delivery of components/LN2 approval for lab
 
|
 
|Dec/Jan
 
|-
 
|Set up slow-control read-out and data storage, monochromator motor control
 
|Vikas -> ?
 
|
 
|
 
|Jan
 
|}
 
{| class="wikitable"
 
|+
 
!Task (review and calculations)
 
!DRI
 
!Status
 
!Finish by
 
|-
 
|<s>Estimate sensitivity needs for observation of the PTFE fluorescence measurement in the setup (preliminary, rough calculation)</s>
 
|Emily (Jasmijn)
 
|Done
 
|Oct 28
 
|-
 
|<s>Review past reflectivity setup design/sample holder (that had XENON in mind) in light of DUNE needs</s>
 
|Marjolein
 
|Done
 
|Oct 30
 
|-
 
|
 
|
 
|
 
|
 
|}
 
Link to measurement procedure document: [[File:Measurement_procedure.pdf]]
 
  
=== Update August 2022 ===
+
Pranati:
  
====== PhDs: ======
+
* On shift at LNGS 8th - 28th October
Vikas: At CERN until end of the year. Will work a little bit with CT technician to get code and slow control in good shape.
 
  
Emily: Focus on getting the SiPM signals to the digitisers. Work with Hans from ET department.
+
*
  
Marjolein: Focus on getting the data from the digitisers into a good format. Work with Maricke/Joran to copy XAMS read-out software.
 
  
====== Undergraduates: ======
+
Anna (MSc, Sept 2024 - July 2025):
<s>Ilze (start Sept 12, HBO internship): Get vacuum chamber working correctly, design improved SiPM holder. Measure beam intensity as function of distance using SiPM</s>
 
  
'''Jasmijn''' (start Sept, AUC capstone project):  Measure lamp spectrum. Based on expected PTFE fluorescence efficiency, calculate amount of light expected on SiPM, and whether that is measurable over the DC rate
+
* Lectures Wednesday 9-11 (only for September and October)
 +
* Lectures Thursday 9-11 (only for September and October)  
 +
* Lectures Monday 15-17 (only for September and October)
  
Not free: Monday 11-14, Tuesday 11-13, Wednesday 9-12, Thursday 16-18, Friday 16-18
+
*
  
 +
Joost (MSc, Sept 2024 - July 2025):
  
'''Lucia''' (January 2023): Measure the SiPM DC rate as a function of temperature. About 6 hours per day.
+
* Lectures on Monday 9-11
 +
Noor (BSc internship, Sept 2024 - Jan 2025):
  
======Projects for distibution======
+
*
# SiPM array and  holder --> reflectivity design (modelling/ mechanical viability/ feedthrough positioning)
 
# SiPM array and holder --> fluorescence design (modelling/ mechanical viability/ movement inside chamber/ solid angle coverage)
 
# Cooling system for sample holder/SiPMs (CAD/COMSOL/ LN2 bath)
 
# Put together a plan for data taking
 

Latest revision as of 13:54, 25 September 2024

Update September 2024 - joint XAMS project

Projects DRI Main dependencies Status Finish by
Finalise reflectivity measurements of DUNE cryostat components Marjolein/Vikas/Corryenne Oct 2024
Fluorescence measurements in VULCAN Anna
Delayed electrons and g1 in XAMS Joost
Calibration of XAMS Noor
Reflectance of DUNE cryostat components Corryenne June 2024
Measure time stability of D2 lamp intensity
Determine effect of exposure to radiation on fluorescence of plastics
Task - hardware DRI Dependencies Status
Design SiPM holder for fluorescence measurements Anna Reflectivity study finished
Set up and test cooling system for samples, SiPM Anna
Fully reconfigure VULCAN for fluorescence measurements Anna cooling system and SiPM holder ready
Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare Anna/Joost
Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET Noor/Joost
Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic Anna/Joost Previous SiPM test results
Install and test 16-channel digitiser for XAMS AP/Maricke XAMS test run finished?
Set up XAMS to start a run Tobias
Measure rest-gas composition in XAMS Noor
Measure outgassing from PTFE Noor
Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal. Joost/Noor
Task - software/analysis DRI Dependencies Status
XAMS MC - simulate calibration sources, g1 expectation AP/?
VULCAN MC - simulate photon paths/coverage fraction of SiPMs Anna
Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN Pranati
Analyse data from XAMS. Ask Carlo for help
Analyse data from VULCAN. Ask Marjolein for help

Planning XAMS run September/October 2024

What Who
Friday 27-09-2024 RGA measurement

GXe filling

Start cooling

Noor

Tobias

Joost

Anna

Monday 30-09-2024 LXe filling Noor

Tobias

Joost

Anna

Maricke

Tuesday 01-10-2024 LXe filling

Lifetime measurement + analysis explanation/training

LED calibration + analysis explanation/training

Noor

Tobias

Joost

Anna

Maricke

Wednesday 02-10-2024 -

Friday 04-10-2024

LED afterpulse measurements Maricke
Monday 07-10-2024 To be determined
...
...
No later than 25-10-2024 Recuperation Noor

Tobias

Joost

Anna

Maricke (depends on the date)

Vacations, Meetings, and general availability of people

General:

Tina:

AP:

  • Working from home in Sept.

Marjolein:

  • Working from Bern from 18 to 24 September

Vikas:

Pranati:

  • On shift at LNGS 8th - 28th October


Anna (MSc, Sept 2024 - July 2025):

  • Lectures Wednesday 9-11 (only for September and October)
  • Lectures Thursday 9-11 (only for September and October)
  • Lectures Monday 15-17 (only for September and October)

Joost (MSc, Sept 2024 - July 2025):

  • Lectures on Monday 9-11

Noor (BSc internship, Sept 2024 - Jan 2025):