− | === Update September | + | |
+ | === Update September 2024 - joint XAMS project === | ||
{| class="wikitable" | {| class="wikitable" | ||
|+ | |+ | ||
− | ! | + | !Projects |
!DRI | !DRI | ||
!Main dependencies | !Main dependencies | ||
Line 8: | Line 9: | ||
!Finish by | !Finish by | ||
|- | |- | ||
− | |<u> | + | |<u>Finalise reflectivity measurements of DUNE cryostat components</u> |
− | |<u> | + | |Marjolein/Vikas/Corryenne |
+ | | | ||
+ | | | ||
+ | |Oct 2024 | ||
+ | |- | ||
+ | |Fluorescence measurements in VULCAN | ||
+ | |<u>Anna</u> | ||
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
− | |<u> | + | |<u>Delayed electrons and g1 in XAMS</u> |
− | |<u> | + | |<u>Joost</u> |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
− | | | + | |Calibration of XAMS |
− | | | + | |Noor |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
− | | | + | |Reflectance of DUNE cryostat components |
− | | | + | |Corryenne |
| | | | ||
| | | | ||
− | | | + | |June 2024 |
|- | |- | ||
− | | | + | |Measure time stability of D2 lamp intensity |
− | | | + | | |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
− | | | + | |Determine effect of exposure to radiation on fluorescence of plastics |
+ | | | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |} | ||
+ | {| class="wikitable" | ||
+ | |+ | ||
+ | !Task - hardware | ||
+ | !DRI | ||
+ | !Dependencies | ||
+ | !Status | ||
+ | |- | ||
+ | |Design SiPM holder for fluorescence measurements | ||
+ | |Anna | ||
+ | |Reflectivity study finished | ||
+ | | | ||
+ | |- | ||
+ | |Set up and test cooling system for samples, SiPM | ||
+ | |Anna | ||
| | | | ||
| | | | ||
+ | |- | ||
+ | |Fully reconfigure VULCAN for fluorescence measurements | ||
+ | |Anna | ||
+ | |cooling system and SiPM holder ready | ||
+ | | | ||
+ | |- | ||
+ | |Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare | ||
+ | |Anna/Joost | ||
| | | | ||
| | | | ||
|- | |- | ||
− | | | + | |Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET |
+ | |Noor/Joost | ||
| | | | ||
| | | | ||
+ | |- | ||
+ | |Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic | ||
+ | |Anna/Joost | ||
+ | |Previous SiPM test results | ||
| | | | ||
+ | |- | ||
+ | |Install and test 16-channel digitiser for XAMS | ||
+ | |AP/Maricke | ||
+ | |XAMS test run finished? | ||
| | | | ||
|- | |- | ||
− | | | + | |Set up XAMS to start a run |
+ | |Tobias | ||
| | | | ||
| | | | ||
+ | |- | ||
+ | |Measure rest-gas composition in XAMS | ||
+ | |Noor | ||
| | | | ||
| | | | ||
|- | |- | ||
− | | | + | |Measure outgassing from PTFE |
+ | |Noor | ||
| | | | ||
| | | | ||
+ | |- | ||
+ | |Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal. | ||
+ | |Joost/Noor | ||
| | | | ||
| | | | ||
|} | |} | ||
{| class="wikitable" | {| class="wikitable" | ||
− | + | !Task - software/analysis | |
− | !Task | ||
!DRI | !DRI | ||
− | ! | + | !Dependencies |
!Status | !Status | ||
− | |||
|- | |- | ||
− | | | + | |XAMS MC - simulate calibration sources, g1 expectation |
− | | | + | |AP/? |
− | | | + | | |
− | | | + | | |
− | |||
|- | |- | ||
− | | | + | |VULCAN MC - simulate photon paths/coverage fraction of SiPMs |
− | | | + | |Anna |
+ | | | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
− | | | + | |Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN |
− | | | + | |Pranati |
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |Analyse data from XAMS. Ask Carlo for help | ||
+ | | | ||
+ | | | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
− | | | + | |Analyse data from VULCAN. Ask Marjolein for help |
− | |||
| | | | ||
− | | | + | | |
− | | | + | | |
+ | |} | ||
+ | |||
+ | === Planning XAMS run September/October 2024 === | ||
+ | {| class="wikitable" | ||
+ | |+ | ||
+ | ! | ||
+ | !What | ||
+ | !Who | ||
|- | |- | ||
− | | | + | |Friday 27-09-2024 |
− | + | |RGA measurement | |
+ | GXe filling | ||
− | + | Start cooling | |
+ | |Noor | ||
+ | Tobias | ||
− | + | Joost | |
− | + | Anna | |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | |Monday 30-09-2024 |
− | - | + | |LXe filling |
+ | |Noor | ||
+ | Tobias | ||
− | + | Joost | |
− | + | Anna | |
− | - | + | Maricke |
+ | |- | ||
+ | |Tuesday 01-10-2024 | ||
+ | |LXe filling | ||
+ | Lifetime measurement + analysis explanation/training | ||
− | + | LED calibration + analysis explanation/training | |
− | | | + | |Noor |
− | + | Tobias | |
− | + | ||
− | + | Joost | |
+ | |||
+ | Anna | ||
+ | |||
+ | Maricke | ||
|- | |- | ||
− | | | + | |Wednesday 02-10-2024 - |
− | + | Friday 04-10-2024 | |
− | + | |LED afterpulse measurements | |
− | | | + | |Maricke |
− | | | ||
|- | |- | ||
− | | | + | |Monday 07-10-2024 |
− | | | + | |''To be determined'' |
− | |||
| | | | ||
− | |||
|- | |- | ||
− | |||
− | |||
| | | | ||
+ | |... | ||
| | | | ||
− | |||
|- | |- | ||
− | |||
− | |||
| | | | ||
− | | | + | |... |
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
− | |||
|- | |- | ||
− | | | + | |''No later than 25-10-2024'' |
− | + | |Recuperation | |
− | + | |Noor | |
− | + | Tobias | |
− | + | ||
− | + | Joost | |
− | | | + | |
− | | | + | Anna |
− | + | ||
− | + | Maricke (depends on the date) | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | |||
| | | | ||
| | | | ||
Line 187: | Line 222: | ||
|} | |} | ||
− | === | + | === Vacations, Meetings, and general availability of people === |
+ | General: | ||
+ | |||
+ | Tina: | ||
+ | |||
+ | * | ||
+ | |||
+ | AP: | ||
+ | |||
+ | * Working from home in Sept. | ||
+ | |||
+ | Marjolein: | ||
+ | |||
+ | *Working from Bern from 18 to 24 September<br /> | ||
+ | |||
+ | Vikas: | ||
+ | |||
+ | * | ||
+ | * | ||
+ | * | ||
+ | |||
+ | Pranati: | ||
+ | |||
+ | * On shift at LNGS 8th - 28th October | ||
− | + | * | |
− | |||
− | |||
− | + | Anna (MSc, Sept 2024 - July 2025): | |
− | + | * Lectures Wednesday 9-11 (only for September and October) | |
− | + | * Lectures Thursday 9-11 (only for September and October) | |
+ | * Lectures Monday 15-17 (only for September and October) | ||
− | + | * | |
− | + | Joost (MSc, Sept 2024 - July 2025): | |
− | + | * Lectures on Monday 9-11 | |
+ | Noor (BSc internship, Sept 2024 - Jan 2025): | ||
− | + | * | |
− | |||
− | |||
− | |||
− |
Latest revision as of 13:54, 25 September 2024
Update September 2024 - joint XAMS project
Projects | DRI | Main dependencies | Status | Finish by |
---|---|---|---|---|
Finalise reflectivity measurements of DUNE cryostat components | Marjolein/Vikas/Corryenne | Oct 2024 | ||
Fluorescence measurements in VULCAN | Anna | |||
Delayed electrons and g1 in XAMS | Joost | |||
Calibration of XAMS | Noor | |||
Reflectance of DUNE cryostat components | Corryenne | June 2024 | ||
Measure time stability of D2 lamp intensity | ||||
Determine effect of exposure to radiation on fluorescence of plastics |
Task - hardware | DRI | Dependencies | Status |
---|---|---|---|
Design SiPM holder for fluorescence measurements | Anna | Reflectivity study finished | |
Set up and test cooling system for samples, SiPM | Anna | ||
Fully reconfigure VULCAN for fluorescence measurements | Anna | cooling system and SiPM holder ready | |
Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare | Anna/Joost | ||
Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET | Noor/Joost | ||
Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic | Anna/Joost | Previous SiPM test results | |
Install and test 16-channel digitiser for XAMS | AP/Maricke | XAMS test run finished? | |
Set up XAMS to start a run | Tobias | ||
Measure rest-gas composition in XAMS | Noor | ||
Measure outgassing from PTFE | Noor | ||
Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal. | Joost/Noor |
Task - software/analysis | DRI | Dependencies | Status |
---|---|---|---|
XAMS MC - simulate calibration sources, g1 expectation | AP/? | ||
VULCAN MC - simulate photon paths/coverage fraction of SiPMs | Anna | ||
Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN | Pranati | ||
Analyse data from XAMS. Ask Carlo for help | |||
Analyse data from VULCAN. Ask Marjolein for help |
Planning XAMS run September/October 2024
What | Who | |
---|---|---|
Friday 27-09-2024 | RGA measurement
GXe filling Start cooling |
Noor
Tobias Joost Anna |
Monday 30-09-2024 | LXe filling | Noor
Tobias Joost Anna Maricke |
Tuesday 01-10-2024 | LXe filling
Lifetime measurement + analysis explanation/training LED calibration + analysis explanation/training |
Noor
Tobias Joost Anna Maricke |
Wednesday 02-10-2024 -
Friday 04-10-2024 |
LED afterpulse measurements | Maricke |
Monday 07-10-2024 | To be determined | |
... | ||
... | ||
No later than 25-10-2024 | Recuperation | Noor
Tobias Joost Anna Maricke (depends on the date) |
Vacations, Meetings, and general availability of people
General:
Tina:
AP:
- Working from home in Sept.
Marjolein:
- Working from Bern from 18 to 24 September
Vikas:
Pranati:
- On shift at LNGS 8th - 28th October
Anna (MSc, Sept 2024 - July 2025):
- Lectures Wednesday 9-11 (only for September and October)
- Lectures Thursday 9-11 (only for September and October)
- Lectures Monday 15-17 (only for September and October)
Joost (MSc, Sept 2024 - July 2025):
- Lectures on Monday 9-11
Noor (BSc internship, Sept 2024 - Jan 2025):