| − | ======   | + | === Update September 2024 - joint XAMS project ===  | 
| − | Vikas  | + | {| class="wikitable"  | 
| + | |+  | ||
| + | !Projects  | ||
| + | !DRI  | ||
| + | !Main dependencies  | ||
| + | !Status  | ||
| + | !Finish by  | ||
| + | |-  | ||
| + | |<u>Finalise reflectivity measurements of DUNE cryostat components</u>  | ||
| + | |Marjolein/Vikas/Corryenne  | ||
| + | |  | ||
| + | |  | ||
| + | |Oct 2024  | ||
| + | |-  | ||
| + | |Fluorescence measurements in VULCAN  | ||
| + | |<u>Anna</u>  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |<u>Delayed electrons and g1 in XAMS</u>  | ||
| + | |<u>Joost</u>  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Calibration of XAMS  | ||
| + | |Noor  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Reflectance of DUNE cryostat components  | ||
| + | |Corryenne  | ||
| + | |  | ||
| + | |  | ||
| + | |June 2024  | ||
| + | |-  | ||
| + | |Measure time stability of D2 lamp intensity  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Determine effect of exposure to radiation on fluorescence of plastics  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |}  | ||
| + | {| class="wikitable"  | ||
| + | |+  | ||
| + | !Task - hardware  | ||
| + | !DRI  | ||
| + | !Dependencies  | ||
| + | !Status  | ||
| + | |-  | ||
| + | |Design SiPM holder for fluorescence measurements  | ||
| + | |Anna  | ||
| + | |Reflectivity study finished  | ||
| + | |  | ||
| + | |-  | ||
| + | |Set up and test cooling system for samples, SiPM  | ||
| + | |Anna  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Fully reconfigure VULCAN for fluorescence measurements  | ||
| + | |Anna  | ||
| + | |cooling system and SiPM holder ready  | ||
| + | |  | ||
| + | |-  | ||
| + | |Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare  | ||
| + | |Anna/Joost  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET  | ||
| + | |Noor/Joost  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic  | ||
| + | |Anna/Joost  | ||
| + | |Previous SiPM test results  | ||
| + | |  | ||
| + | |-  | ||
| + | |Install and test 16-channel digitiser for XAMS  | ||
| + | |AP/Maricke  | ||
| + | |XAMS test run finished?  | ||
| + | |  | ||
| + | |-  | ||
| + | |Set up XAMS to start a run  | ||
| + | |Tobias  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Measure rest-gas composition in XAMS  | ||
| + | |Noor  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Measure outgassing from PTFE  | ||
| + | |Noor  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal.  | ||
| + | |Joost/Noor  | ||
| + | |  | ||
| + | |  | ||
| + | |}  | ||
| + | {| class="wikitable"  | ||
| + | !Task - software/analysis  | ||
| + | !DRI  | ||
| + | !Dependencies  | ||
| + | !Status  | ||
| + | |-  | ||
| + | |XAMS MC - simulate calibration sources, g1 expectation  | ||
| + | |AP/?  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |VULCAN MC - simulate photon paths/coverage fraction of SiPMs  | ||
| + | |Anna  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN   | ||
| + | |Pranati  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Analyse data from XAMS. Ask Carlo for help  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |-  | ||
| + | |Analyse data from VULCAN. Ask Marjolein for help  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |}  | ||
| − | + | === Planning XAMS run September/October 2024 ===  | |
| + | {| class="wikitable"  | ||
| + | |+  | ||
| + | !  | ||
| + | !What  | ||
| + | !Who  | ||
| + | |-  | ||
| + | |Friday 27-09-2024  | ||
| + | |RGA measurement  | ||
| + | GXe filling  | ||
| − | + | Start cooling  | |
| + | |Noor  | ||
| + | Tobias  | ||
| − | + | Joost  | |
| − | |||
| − | + | Anna  | |
| + | |-  | ||
| + | |Monday 30-09-2024  | ||
| + | |LXe filling  | ||
| + | |Noor  | ||
| + | Tobias  | ||
| + | |||
| + | Joost  | ||
| + | |||
| + | Anna  | ||
| + | |||
| + | Maricke  | ||
| + | |-  | ||
| + | |Tuesday 01-10-2024  | ||
| + | |LXe filling  | ||
| + | Lifetime measurement + analysis explanation/training  | ||
| + | |||
| + | LED calibration + analysis explanation/training  | ||
| + | |Noor  | ||
| + | Tobias  | ||
| + | |||
| + | Joost  | ||
| + | |||
| + | Anna  | ||
| + | |||
| + | Maricke  | ||
| + | |-  | ||
| + | |Wednesday 02-10-2024 -  | ||
| + | Friday 04-10-2024  | ||
| + | |LED afterpulse measurements  | ||
| + | |Maricke  | ||
| + | |-  | ||
| + | |Monday 07-10-2024  | ||
| + | |''To be determined''  | ||
| + | |  | ||
| + | |-  | ||
| + | |  | ||
| + | |...  | ||
| + | |  | ||
| + | |-  | ||
| + | |  | ||
| + | |...  | ||
| + | |  | ||
| + | |-  | ||
| + | |''No later than 25-10-2024''  | ||
| + | |Recuperation  | ||
| + | |Noor  | ||
| + | Tobias  | ||
| + | |||
| + | Joost  | ||
| + | |||
| + | Anna  | ||
| + | |||
| + | Maricke (depends on the date)  | ||
| + | |-  | ||
| + | |  | ||
| + | |  | ||
| + | |  | ||
| + | |}  | ||
| + | |||
| + | === Vacations, Meetings, and general availability of people ===  | ||
| + | General:  | ||
| + | |||
| + | Tina:   | ||
| + | |||
| + | *   | ||
| + | |||
| + | AP:  | ||
| + | |||
| + | * Working from home in Sept.  | ||
| + | |||
| + | Marjolein:  | ||
| + | |||
| + | *Working from Bern from 18 to 24 September<br />  | ||
| + | |||
| + | Vikas:  | ||
| + | |||
| + | *   | ||
| + | *   | ||
| + | *   | ||
| + | |||
| + | Pranati:   | ||
| + | |||
| + | * On shift at LNGS 8th - 28th October  | ||
| + | |||
| + | *   | ||
| + | |||
| + | |||
| + | Anna (MSc, Sept 2024 - July 2025):  | ||
| + | |||
| + | * Lectures Wednesday 9-11 (only for September and October)   | ||
| + | * Lectures Thursday 9-11 (only for September and October)   | ||
| + | * Lectures Monday 15-17 (only for September and October)   | ||
| + | |||
| + | *   | ||
| + | |||
| + | Joost (MSc, Sept 2024 - July 2025):  | ||
| + | |||
| + | * Lectures on Monday 9-11  | ||
| + | Noor (BSc internship, Sept 2024 - Jan 2025):  | ||
| + | |||
| + | *  | ||
Latest revision as of 13:54, 25 September 2024
Update September 2024 - joint XAMS project
| Projects | DRI | Main dependencies | Status | Finish by | 
|---|---|---|---|---|
| Finalise reflectivity measurements of DUNE cryostat components | Marjolein/Vikas/Corryenne | Oct 2024 | ||
| Fluorescence measurements in VULCAN | Anna | |||
| Delayed electrons and g1 in XAMS | Joost | |||
| Calibration of XAMS | Noor | |||
| Reflectance of DUNE cryostat components | Corryenne | June 2024 | ||
| Measure time stability of D2 lamp intensity | ||||
| Determine effect of exposure to radiation on fluorescence of plastics | 
| Task - hardware | DRI | Dependencies | Status | 
|---|---|---|---|
| Design SiPM holder for fluorescence measurements | Anna | Reflectivity study finished | |
| Set up and test cooling system for samples, SiPM | Anna | ||
| Fully reconfigure VULCAN for fluorescence measurements | Anna | cooling system and SiPM holder ready | |
| Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare | Anna/Joost | ||
| Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET | Noor/Joost | ||
| Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic | Anna/Joost | Previous SiPM test results | |
| Install and test 16-channel digitiser for XAMS | AP/Maricke | XAMS test run finished? | |
| Set up XAMS to start a run | Tobias | ||
| Measure rest-gas composition in XAMS | Noor | ||
| Measure outgassing from PTFE | Noor | ||
| Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal. | Joost/Noor | 
| Task - software/analysis | DRI | Dependencies | Status | 
|---|---|---|---|
| XAMS MC - simulate calibration sources, g1 expectation | AP/? | ||
| VULCAN MC - simulate photon paths/coverage fraction of SiPMs | Anna | ||
| Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN | Pranati | ||
| Analyse data from XAMS. Ask Carlo for help | |||
| Analyse data from VULCAN. Ask Marjolein for help | 
Planning XAMS run September/October 2024
| What | Who | |
|---|---|---|
| Friday 27-09-2024 | RGA measurement
 GXe filling Start cooling  | 
Noor
 Tobias Joost Anna  | 
| Monday 30-09-2024 | LXe filling | Noor
 Tobias Joost Anna Maricke  | 
| Tuesday 01-10-2024 | LXe filling
 Lifetime measurement + analysis explanation/training LED calibration + analysis explanation/training  | 
Noor
 Tobias Joost Anna Maricke  | 
| Wednesday 02-10-2024 -
 Friday 04-10-2024  | 
LED afterpulse measurements | Maricke | 
| Monday 07-10-2024 | To be determined | |
| ... | ||
| ... | ||
| No later than 25-10-2024 | Recuperation | Noor
 Tobias Joost Anna Maricke (depends on the date)  | 
Vacations, Meetings, and general availability of people
General:
Tina:
AP:
- Working from home in Sept.
 
Marjolein:
- Working from Bern from 18 to 24 September
 
Vikas:
Pranati:
- On shift at LNGS 8th - 28th October
 
Anna (MSc, Sept 2024 - July 2025):
- Lectures Wednesday 9-11 (only for September and October)
 - Lectures Thursday 9-11 (only for September and October)
 - Lectures Monday 15-17 (only for September and October)
 
Joost (MSc, Sept 2024 - July 2025):
- Lectures on Monday 9-11
 
Noor (BSc internship, Sept 2024 - Jan 2025):