Difference between revisions of "VUVProjectsPlanning"
Jump to navigation
Jump to search
m |
|||
| (59 intermediate revisions by 10 users not shown) | |||
| Line 1: | Line 1: | ||
| − | === Update September | + | |
| + | === Update September 2024 - joint XAMS project === | ||
{| class="wikitable" | {| class="wikitable" | ||
|+ | |+ | ||
| − | ! | + | !Projects |
!DRI | !DRI | ||
!Main dependencies | !Main dependencies | ||
| Line 8: | Line 9: | ||
!Finish by | !Finish by | ||
|- | |- | ||
| − | |<u> | + | |<u>Finalise reflectivity measurements of DUNE cryostat components</u> |
| − | |<u> | + | |Marjolein/Vikas/Corryenne |
| + | | | ||
| + | | | ||
| + | |Oct 2024 | ||
| + | |- | ||
| + | |Fluorescence measurements in VULCAN | ||
| + | |<u>Anna</u> | ||
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | |<u> | + | |<u>Delayed electrons and g1 in XAMS</u> |
| − | |<u> | + | |<u>Joost</u> |
| | | | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |Calibration of XAMS |
| − | | | + | |Noor |
| + | | | ||
| + | | | ||
| | | | ||
| + | |- | ||
| + | |Reflectance of DUNE cryostat components | ||
| + | |Corryenne | ||
| | | | ||
| | | | ||
| + | |June 2024 | ||
|- | |- | ||
| − | | | + | |Measure time stability of D2 lamp intensity |
| − | | | + | | |
| + | | | ||
| | | | ||
| | | | ||
| − | |||
|- | |- | ||
| − | | | + | |Determine effect of exposure to radiation on fluorescence of plastics |
| − | |||
| | | | ||
| | | | ||
| + | | | ||
| + | | | ||
| + | |} | ||
| + | {| class="wikitable" | ||
| + | |+ | ||
| + | !Task - hardware | ||
| + | !DRI | ||
| + | !Dependencies | ||
| + | !Status | ||
| + | |- | ||
| + | |Design SiPM holder for fluorescence measurements | ||
| + | |Anna | ||
| + | |Reflectivity study finished | ||
| | | | ||
|- | |- | ||
| − | | | + | |Set up and test cooling system for samples, SiPM |
| + | |Anna | ||
| + | | | ||
| | | | ||
| + | |- | ||
| + | |Fully reconfigure VULCAN for fluorescence measurements | ||
| + | |Anna | ||
| + | |cooling system and SiPM holder ready | ||
| | | | ||
| + | |- | ||
| + | |Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare | ||
| + | |Anna/Joost | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET |
| + | |Noor/Joost | ||
| | | | ||
| | | | ||
| + | |- | ||
| + | |Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic | ||
| + | |Anna/Joost | ||
| + | |Previous SiPM test results | ||
| | | | ||
| + | |- | ||
| + | |Install and test 16-channel digitiser for XAMS | ||
| + | |AP/Maricke | ||
| + | |XAMS test run finished? | ||
| | | | ||
|- | |- | ||
| − | | | + | |Set up XAMS to start a run |
| + | |Tobias | ||
| | | | ||
| | | | ||
| + | |- | ||
| + | |Measure rest-gas composition in XAMS | ||
| + | |Noor | ||
| | | | ||
| | | | ||
|- | |- | ||
| − | | | + | |Measure outgassing from PTFE |
| + | |Noor | ||
| | | | ||
| | | | ||
| + | |- | ||
| + | |Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal. | ||
| + | |Joost/Noor | ||
| | | | ||
| | | | ||
|} | |} | ||
{| class="wikitable" | {| class="wikitable" | ||
| − | + | !Task - software/analysis | |
| − | !Task | ||
!DRI | !DRI | ||
| − | ! | + | !Dependencies |
!Status | !Status | ||
| − | |||
|- | |- | ||
| − | | | + | |XAMS MC - simulate calibration sources, g1 expectation |
| − | | | + | |AP/? |
| − | | | + | | |
| − | | | + | | |
| − | | | + | |- |
| + | |VULCAN MC - simulate photon paths/coverage fraction of SiPMs | ||
| + | |Anna | ||
| + | | | ||
| + | | | ||
|- | |- | ||
| − | | | + | |Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN |
| − | | | + | |Pranati |
| + | | | ||
| | | | ||
| − | |||
| − | |||
|- | |- | ||
| − | | | + | |Analyse data from XAMS. Ask Carlo for help |
| − | | | + | | |
| + | | | ||
| | | | ||
| − | |||
| − | |||
|- | |- | ||
| − | | | + | |Analyse data from VULCAN. Ask Marjolein for help |
| − | | | + | | |
| + | | | ||
| | | | ||
| − | | | + | |} |
| − | | | + | |
| + | === Planning XAMS run September/October 2024 === | ||
| + | {| class="wikitable" | ||
| + | |+ | ||
| + | ! | ||
| + | !What | ||
| + | !Who | ||
|- | |- | ||
| − | | | + | |Friday 27-09-2024 |
| − | + | |RGA measurement | |
| + | GXe filling | ||
| − | + | Start cooling | |
| + | |Noor | ||
| + | Tobias | ||
| − | + | Joost | |
| − | + | Anna | |
| − | |||
| − | |||
| − | |||
| − | |||
|- | |- | ||
| − | | | + | |Monday 30-09-2024 |
| − | - | + | |LXe filling |
| + | |Noor | ||
| + | Tobias | ||
| + | |||
| + | Joost | ||
| − | + | Anna | |
| − | - | + | Maricke |
| + | |- | ||
| + | |Tuesday 01-10-2024 | ||
| + | |LXe filling | ||
| + | Lifetime measurement + analysis explanation/training | ||
| − | + | LED calibration + analysis explanation/training | |
| + | |Noor | ||
| + | Tobias | ||
| − | + | Joost | |
| − | + | ||
| − | + | Anna | |
| − | + | ||
| − | + | Maricke | |
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
|- | |- | ||
| − | | | + | |Wednesday 02-10-2024 - |
| − | + | Friday 04-10-2024 | |
| − | + | |LED afterpulse measurements | |
| − | | | + | |Maricke |
| − | | | ||
|- | |- | ||
| − | | | + | |Monday 07-10-2024 |
| − | | | + | |''To be determined'' |
| | | | ||
| − | |||
| − | |||
|- | |- | ||
| − | |||
| − | |||
| − | |||
| | | | ||
| − | | | + | |... |
| − | |||
| − | |||
| − | |||
| | | | ||
| − | |||
| − | |||
|- | |- | ||
| − | |||
| − | |||
| | | | ||
| + | |... | ||
| | | | ||
| − | |||
|- | |- | ||
| − | | | + | |''No later than 25-10-2024'' |
| − | | | + | |Recuperation |
| − | | | + | |Noor |
| − | + | Tobias | |
| − | + | ||
| − | + | Joost | |
| − | + | ||
| − | + | Anna | |
| − | + | ||
| − | + | Maricke (depends on the date) | |
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
|- | |- | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| | | | ||
| | | | ||
| Line 187: | Line 222: | ||
|} | |} | ||
| − | === | + | === Vacations, Meetings, and general availability of people === |
| + | General: | ||
| + | |||
| + | Tina: | ||
| + | |||
| + | * | ||
| + | |||
| + | AP: | ||
| + | |||
| + | * Working from home in Sept. | ||
| + | |||
| + | Marjolein: | ||
| + | |||
| + | *Working from Bern from 18 to 24 September<br /> | ||
| + | |||
| + | Vikas: | ||
| + | |||
| + | * | ||
| + | * | ||
| + | * | ||
| + | |||
| + | Pranati: | ||
| + | |||
| + | * On shift at LNGS 8th - 28th October | ||
| − | + | * | |
| − | |||
| − | |||
| − | + | Anna (MSc, Sept 2024 - July 2025): | |
| − | + | * Lectures Wednesday 9-11 (only for September and October) | |
| − | + | * Lectures Thursday 9-11 (only for September and October) | |
| + | * Lectures Monday 15-17 (only for September and October) | ||
| − | + | * | |
| − | + | Joost (MSc, Sept 2024 - July 2025): | |
| − | + | * Lectures on Monday 9-11 | |
| + | Noor (BSc internship, Sept 2024 - Jan 2025): | ||
| − | + | * | |
| − | |||
| − | |||
| − | |||
| − | |||
Latest revision as of 13:54, 25 September 2024
Update September 2024 - joint XAMS project
| Projects | DRI | Main dependencies | Status | Finish by |
|---|---|---|---|---|
| Finalise reflectivity measurements of DUNE cryostat components | Marjolein/Vikas/Corryenne | Oct 2024 | ||
| Fluorescence measurements in VULCAN | Anna | |||
| Delayed electrons and g1 in XAMS | Joost | |||
| Calibration of XAMS | Noor | |||
| Reflectance of DUNE cryostat components | Corryenne | June 2024 | ||
| Measure time stability of D2 lamp intensity | ||||
| Determine effect of exposure to radiation on fluorescence of plastics |
| Task - hardware | DRI | Dependencies | Status |
|---|---|---|---|
| Design SiPM holder for fluorescence measurements | Anna | Reflectivity study finished | |
| Set up and test cooling system for samples, SiPM | Anna | ||
| Fully reconfigure VULCAN for fluorescence measurements | Anna | cooling system and SiPM holder ready | |
| Test if signal from S13360-6050-PE is good with current VULCAN read-out board - if not, work with ET to design new circuit - also use Hamamatsu board and compare | Anna/Joost | ||
| Test how signal from S13360-6050PE degrades when connected over a long cable as will be the case in XAMS - decide if we need pre-amplifier inside XAMS - together with ET | Noor/Joost | ||
| Procure SiPM read-out board - 4+ channels, S13360-6050PE/CS SiPMs - from ET, possibly a total of 4 or so if economic | Anna/Joost | Previous SiPM test results | |
| Install and test 16-channel digitiser for XAMS | AP/Maricke | XAMS test run finished? | |
| Set up XAMS to start a run | Tobias | ||
| Measure rest-gas composition in XAMS | Noor | ||
| Measure outgassing from PTFE | Noor | ||
| Re-design the guts of XAMS to include SiPM readout of a possible fluorescence signal (new PTFE sleeve). Ask advice from Marieke and from Oscar (from MT). Come up with a proposal. | Joost/Noor |
| Task - software/analysis | DRI | Dependencies | Status |
|---|---|---|---|
| XAMS MC - simulate calibration sources, g1 expectation | AP/? | ||
| VULCAN MC - simulate photon paths/coverage fraction of SiPMs | Anna | ||
| Based on XENON1T/nT data, calculate possible PTFE fluorescence efficiencies and compare to sensitivity achievable in VULCAN | Pranati | ||
| Analyse data from XAMS. Ask Carlo for help | |||
| Analyse data from VULCAN. Ask Marjolein for help |
Planning XAMS run September/October 2024
| What | Who | |
|---|---|---|
| Friday 27-09-2024 | RGA measurement
GXe filling Start cooling |
Noor
Tobias Joost Anna |
| Monday 30-09-2024 | LXe filling | Noor
Tobias Joost Anna Maricke |
| Tuesday 01-10-2024 | LXe filling
Lifetime measurement + analysis explanation/training LED calibration + analysis explanation/training |
Noor
Tobias Joost Anna Maricke |
| Wednesday 02-10-2024 -
Friday 04-10-2024 |
LED afterpulse measurements | Maricke |
| Monday 07-10-2024 | To be determined | |
| ... | ||
| ... | ||
| No later than 25-10-2024 | Recuperation | Noor
Tobias Joost Anna Maricke (depends on the date) |
Vacations, Meetings, and general availability of people
General:
Tina:
AP:
- Working from home in Sept.
Marjolein:
- Working from Bern from 18 to 24 September
Vikas:
Pranati:
- On shift at LNGS 8th - 28th October
Anna (MSc, Sept 2024 - July 2025):
- Lectures Wednesday 9-11 (only for September and October)
- Lectures Thursday 9-11 (only for September and October)
- Lectures Monday 15-17 (only for September and October)
Joost (MSc, Sept 2024 - July 2025):
- Lectures on Monday 9-11
Noor (BSc internship, Sept 2024 - Jan 2025):