Difference between revisions of "Calibrations"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (→Setup)  | 
				|||
| Line 39: | Line 39: | ||
===Setup===  | ===Setup===  | ||
| − |   * Take a dark count run with aluminium sample and   | + |  * Take temperature reading  | 
| + |   * Take a dark count run with aluminium sample and lamp off  | ||
     * 30s measurement time  |      * 30s measurement time  | ||
| − |      * Repeat in   | + |      * Repeat in the lamp beam with closed slit if possible to test light leakage  | 
     * With all SiPMs  |      * With all SiPMs  | ||
| − | |||
  * Measure lamp  |   * Measure lamp  | ||
     * Move grating with motor to calibrate motor control  |      * Move grating with motor to calibrate motor control  | ||
| − |      * Move grating and measure intensity at each wavelength (in   | + |      * Move grating and measure intensity at each wavelength (in predefined steps)  | 
| − |      * Compare this to the expected spectrum  | + |      * Compare this to the expected spectrum plus SiPM response  | 
     * Repeat for all SiPMs  |      * Repeat for all SiPMs  | ||
     * Compare spectra between SiPMs  |      * Compare spectra between SiPMs  | ||
| − |      * Sweep SiPMs across the beam (in   | + |      * Sweep SiPMs across the beam (in predefined steps)  | 
Revision as of 14:37, 18 November 2022
Calibration checklist
Cleaning
* Clean chamber * Take apart * Clean modules - BOSIMANITE AL-29 followed by ROGYPAL CA-307 Z, bake for 80*C for 18 hours * Clean O-rings - Isopropanol * Put chamber together (check configuration required) * Reconnect monochromator * Adjust height to prevent bending of modules during pumping * Connect securely * Clean sample holder - isopropanol * Central piece * Three frames * Three doors * Suspension support * Screws/springs * Clean cooling apparatus - isopropanol * Cooling braids * Screws/springs * Clean base aluminium sample - isopropanol * Clean readout equipment which will be inside chamber (wires) - isopropanol * Clean SiPM holder - isopropanol
Reassembly
* Install temperature sensor * Install sample holder with samples * Reconnect cooling apparatus * Cooling braids * Screws/springs * Install SiPM holder * Visually test that it is in line * Reconnect readout equipment * Test to make sure all connections are secure * Pull vacuum down to e-3mbar
Setup
* Take temperature reading * Take a dark count run with aluminium sample and lamp off * 30s measurement time * Repeat in the lamp beam with closed slit if possible to test light leakage * With all SiPMs * Measure lamp * Move grating with motor to calibrate motor control * Move grating and measure intensity at each wavelength (in predefined steps) * Compare this to the expected spectrum plus SiPM response * Repeat for all SiPMs * Compare spectra between SiPMs * Sweep SiPMs across the beam (in predefined steps)