Difference between revisions of "Calibrations"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 1: | Line 1: | ||
=====Calibration checklist=====  | =====Calibration checklist=====  | ||
| + | |||
| + | ===Cleaning===  | ||
  * Clean chamber  |   * Clean chamber  | ||
| Line 21: | Line 23: | ||
  * Clean readout equipment which will be inside chamber (wires) - isopropanol  |   * Clean readout equipment which will be inside chamber (wires) - isopropanol  | ||
  * Clean SiPM holder - isopropanol  |   * Clean SiPM holder - isopropanol  | ||
| + | |||
| + | ===Reassembly===  | ||
| + | |||
  * Install temperature sensor  |   * Install temperature sensor  | ||
  * Install sample holder with samples  |   * Install sample holder with samples  | ||
| Line 31: | Line 36: | ||
     * Test to make sure all connections are secure  |      * Test to make sure all connections are secure  | ||
  * Pull vacuum down to e-3mbar  |   * Pull vacuum down to e-3mbar  | ||
| + | |||
| + | ===Setup===  | ||
| + | |||
  * Take a dark count run with aluminium sample and slits closed  |   * Take a dark count run with aluminium sample and slits closed  | ||
     * 30s measurement time  |      * 30s measurement time  | ||
Revision as of 14:28, 18 November 2022
Calibration checklist
Cleaning
* Clean chamber * Take apart * Clean modules - BOSIMANITE AL-29 followed by ROGYPAL CA-307 Z, bake for 80*C for 18 hours * Clean O-rings - Isopropanol * Put chamber together (check configuration required) * Reconnect monochromator * Adjust height to prevent bending of modules during pumping * Connect securely * Clean sample holder - isopropanol * Central piece * Three frames * Three doors * Suspension support * Screws/springs * Clean cooling apparatus - isopropanol * Cooling braids * Screws/springs * Clean base aluminium sample - isopropanol * Clean readout equipment which will be inside chamber (wires) - isopropanol * Clean SiPM holder - isopropanol
Reassembly
* Install temperature sensor * Install sample holder with samples * Reconnect cooling apparatus * Cooling braids * Screws/springs * Install SiPM holder * Visually test that it is in line * Reconnect readout equipment * Test to make sure all connections are secure * Pull vacuum down to e-3mbar
Setup
* Take a dark count run with aluminium sample and slits closed * 30s measurement time * Repeat in and out of the lamp beam if possible * With all SiPMs * Take temperature readouts * Measure lamp * Move grating with motor to calibrate motor control * Move grating and measure intensity at each wavelength (in 10nm steps) * Compare this to the expected spectrum * Repeat for all SiPMs * Compare spectra between SiPMs * Sweep SiPMs across the beam (in 5mm steps)