Difference between revisions of "Calibrations"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 1: | Line 1: | ||
=====Calibration checklist=====  | =====Calibration checklist=====  | ||
| − |   * Clean chamber   | + |   * Clean chamber  | 
     * Take apart  |      * Take apart  | ||
| − |      * Clean modules  | + |      * Clean modules - BOSIMANITE AL-29 followed by ROGYPAL CA-307 Z, bake for 80*C for 18 hours  | 
| − |      * Clean O-rings  | + |      * Clean O-rings - Isopropanol   | 
| − |   * Put chamber together (  | + |   * Put chamber together (check configuration required)  | 
| − | |||
  * Reconnect monochromator  |   * Reconnect monochromator  | ||
     * Adjust height to prevent bending of modules during pumping  |      * Adjust height to prevent bending of modules during pumping  | ||
     * Connect securely  |      * Connect securely  | ||
| − |   * Clean sample holder   | + |   * Clean sample holder - isopropanol  | 
     * Central piece    |      * Central piece    | ||
     * Three frames  |      * Three frames  | ||
     * Three doors  |      * Three doors  | ||
     * Suspension support  |      * Suspension support  | ||
| − | + |     * Screws/springs  | |
| − | + |   * Clean cooling apparatus - isopropanol  | |
| − | |||
| − |   * Clean cooling apparatus   | ||
     * Cooling braids  |      * Cooling braids  | ||
     * Screws/springs  |      * Screws/springs  | ||
| + |  * Clean base aluminium sample - isopropanol  | ||
| + |  * Clean readout equipment which will be inside chamber (wires) - isopropanol  | ||
| + |  * Clean SiPM holder - isopropanol  | ||
| + |  * Install temperature sensor  | ||
| + |  * Install sample holder with samples  | ||
  * Reconnect cooling apparatus  |   * Reconnect cooling apparatus  | ||
     * Cooling braids  |      * Cooling braids  | ||
     * Screws/springs  |      * Screws/springs  | ||
| − | |||
| − | |||
  * Install SiPM holder  |   * Install SiPM holder  | ||
     * Visually test that it is in line  |      * Visually test that it is in line  | ||
Revision as of 14:25, 18 November 2022
Calibration checklist
* Clean chamber * Take apart * Clean modules - BOSIMANITE AL-29 followed by ROGYPAL CA-307 Z, bake for 80*C for 18 hours * Clean O-rings - Isopropanol * Put chamber together (check configuration required) * Reconnect monochromator * Adjust height to prevent bending of modules during pumping * Connect securely * Clean sample holder - isopropanol * Central piece * Three frames * Three doors * Suspension support * Screws/springs * Clean cooling apparatus - isopropanol * Cooling braids * Screws/springs * Clean base aluminium sample - isopropanol * Clean readout equipment which will be inside chamber (wires) - isopropanol * Clean SiPM holder - isopropanol * Install temperature sensor * Install sample holder with samples * Reconnect cooling apparatus * Cooling braids * Screws/springs * Install SiPM holder * Visually test that it is in line * Reconnect readout equipment * Test to make sure all connections are secure * Pull vacuum down to e-3mbar * Take a dark count run with aluminium sample and slits closed * 30s measurement time * Repeat in and out of the lamp beam if possible * With all SiPMs * Take temperature readouts * Measure lamp * Move grating with motor to calibrate motor control * Move grating and measure intensity at each wavelength (in 10nm steps) * Compare this to the expected spectrum * Repeat for all SiPMs * Compare spectra between SiPMs * Sweep SiPMs across the beam (in 5mm steps)