Difference between revisions of "Calibrations"

From Vacuum Ultra Violet
Jump to navigation Jump to search
Line 6: Line 6:
 
     * Clean O-rings
 
     * Clean O-rings
 
  * Put chamber together (with new modules including LN2 trap, solid bottom plate and central feedthrough)
 
  * Put chamber together (with new modules including LN2 trap, solid bottom plate and central feedthrough)
  * <s>Clean grating/window of monochromator (isopropanol)</s> Do not touch the surface of the grating or the lamp window with any material! Do not put solvents on it.  
+
  * Do not touch the surface of the grating or the lamp window with any material! Do not put solvents on it.  
 
  * Reconnect monochromator
 
  * Reconnect monochromator
 
     * Adjust height to prevent bending of modules during pumping
 
     * Adjust height to prevent bending of modules during pumping
Line 16: Line 16:
 
     * Suspension support
 
     * Suspension support
 
  * Clean base aluminium sample (ultrasonic bath and isopropanol)
 
  * Clean base aluminium sample (ultrasonic bath and isopropanol)
 +
* Install temperature sensor
 
  * Install sample holder with aluminium sample (for dark count measurements)
 
  * Install sample holder with aluminium sample (for dark count measurements)
 
  * Clean cooling apparatus (ultrasonic bath and isopropanol)
 
  * Clean cooling apparatus (ultrasonic bath and isopropanol)
Line 34: Line 35:
 
     * Repeat in and out of the lamp beam if possible
 
     * Repeat in and out of the lamp beam if possible
 
     * With all SiPMs
 
     * With all SiPMs
 +
* Take temperature readouts
 
  * Measure lamp
 
  * Measure lamp
 
     * Move grating with motor to calibrate motor control
 
     * Move grating with motor to calibrate motor control

Revision as of 12:27, 26 October 2022

Calibration checklist
* Clean chamber (ultrasonic bath and isopropanol)
   * Take apart
   * Clean modules
   * Clean O-rings
* Put chamber together (with new modules including LN2 trap, solid bottom plate and central feedthrough)
* Do not touch the surface of the grating or the lamp window with any material! Do not put solvents on it. 
* Reconnect monochromator
   * Adjust height to prevent bending of modules during pumping
   * Connect securely
* Clean sample holder (ultrasonic bath and isopropanol)
   * Central piece 
   * Three frames
   * Three doors
   * Suspension support
* Clean base aluminium sample (ultrasonic bath and isopropanol)
* Install temperature sensor
* Install sample holder with aluminium sample (for dark count measurements)
* Clean cooling apparatus (ultrasonic bath and isopropanol)
   * Cooling braids
   * Screws/springs
* Reconnect cooling apparatus
   * Cooling braids
   * Screws/springs
* Clean readout equipment which will be inside chamber (wires) (isopropanol)
* Clean SiPM holder (ultrasonic bath and isopropanol)
* Install SiPM holder
   * Visually test that it is in line
* Reconnect readout equipment
   * Test to make sure all connections are secure
* Pull vacuum down to e-3mbar
* Take a dark count run with aluminium sample and slits closed
   * 30s measurement time
   * Repeat in and out of the lamp beam if possible
   * With all SiPMs
* Take temperature readouts
* Measure lamp
   * Move grating with motor to calibrate motor control
   * Move grating and measure intensity at each wavelength (in 10nm steps)
   * Compare this to the expected spectrum
   * Repeat for all SiPMs
   * Compare spectra between SiPMs
   * Sweep SiPMs across the beam (in 5mm steps)