Upgrade/VeloModules

From LHCb Wiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Under construction


Communication

 * production status: https://docs.google.com/spreadsheets/d/1aQUv3_9Cp1Wo5tmCbe4lyL7TXjcZVb4F1SLHjV4-ZqY
 * module status: https://docs.google.com/document/d/1hnCGsmCTcDe4o2m7lTcTWRrB2gXco2-zq2ImWTs1_b8

Documentation

Setup for module production QA (last update 22/9/2016)

There are two tests:

1. quick electrical test ("20 seconds"), mainly to check that wirebonds are ok. This test should take place in the clean-room. For this we need:

  • LV (incl. PC for controls?)
  • DAQ
  • fibers to connect to DAQ
  • database to summarize results

2. burn-in test ("24 hours"). For this we need:

  • LV
  • HV (till 1000V; must have precise current control/monitor )
  • PC with PVSS to control LV and HV
  • DAQ
  • fibers to connect to DAQ
  • PC to run data analysis (needs to happen in real time as data volumes are very large)
  • database to summarize results
  • 19 inch rack
  • CO2 cooling
  • vacuum tank
  • if not in the cleanroom, a 'tent' to protect setup

DAQ system

We will have only one DAQ system, the so-called 'mini-DAQ'. A system consists of a PCI express card in an ASUS ESC 4000 G3 server PC. (See https://www.asus.com/us/Commercial-Servers-Workstations/ESC4000_G3/). As we have only one system, we either need to do both tests in the same place, or pull fibers.

CO2 Cooling

A lot of what we do depends on where we do test 2. If we do it in the clean room, then we need a blow system for the CO2. If we do it in the vacuum lab, then we need to pull a lot of optical fibers. To take this decision, we need to understand:

  • when is the blow system available? how often do we need to change bottles? is bottled CO2 dry and clean enough? is a blow system with cryogenic CO2 an option?
  • is the standard CO2 cooler reliable enough?

Information for cooling and test location decision:

  • Ground plan N025 & H026: N025&H026
  • List of pros and cons (dutch): List

Schedule / action list

Things that we can prepare before the decision on the location of test 2:

  • finish the vacuum tank (Q4 2016)
  • collect LV and HV units, 19 inch rack (Q4 2016)
  • configure the PC for LV and HV controls (Q1 2017? does this make sense if we do not have a module yet?)
  • prepare DAQ system (Q1 2017)