Upgrade/RFFoil

From LHCb Wiki
Revision as of 07:34, 22 October 2014 by Wouterh@nikhef.nl (talk | contribs)
Jump to navigation Jump to search

Communication

Planning

Link to project plan: [project plan]

Rough timeline:

  • R&D/prototyping 2014-2015
  • Production 2016-2017
  • Installation 2018

People

  • Willem Kuilman
  • Berend Munneke
  • Johan Kos
  • Martin Doets
  • Rob Walet
  • Tjeerd Ketel
  • Wouter Hulsbergen

Information on requirements

File:Requirements.pdf is the information given to external partners.

Information on materials

Information on machining

  • File:Mul Milling vs Turning.pdf is an old presentation by Frans Mul. The interesting conclusion is that 'turning' leads to a leaking foil, while 'milling' does not.

== Activities (starting October 2014)

  • 2014/10/02: Machining of 5 drums ready (4 of 250 mu thickness, 1 of 150 mu thickness, all without leaks)
  • 2014/10/20: Three drums with 0.1 micron holes sent to VDL (see ELOG)
  • 2014/10/20: Received 1kg of Field's metal and 1kg of cerrolow 136 from Lowden Limited


Action items

  • arrange a room for Willem (2014/09/18)