Difference between revisions of "Upgrade/RFFoil"

From LHCb Wiki
Jump to navigation Jump to search
 
(10 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
* ELOG: https://webapps.nikhef.nl/elog/VELO_Upgrade_RFBox/
 
* ELOG: https://webapps.nikhef.nl/elog/VELO_Upgrade_RFBox/
 
* Progress reports in MT meetings: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/minutes/
 
* Progress reports in MT meetings: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/minutes/
 +
* OPP reports: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/oppreports/VeloUpgradeRFBox/
 
* Massi's twiki on foil thinning: https://lbtwiki.cern.ch/bin/view/VELO/FoilThinning
 
* Massi's twiki on foil thinning: https://lbtwiki.cern.ch/bin/view/VELO/FoilThinning
 
* photographs:  
 
* photographs:  
 
** http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/production/UpgradeRFbox/
 
** http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/production/UpgradeRFbox/
 
** http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/production/UpgradeRFbox/Willem
 
** http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/production/UpgradeRFbox/Willem
 +
* RadiationTestsBirmingham
  
 
== Planning ==
 
== Planning ==
  
Link to project plan: [https://wiki.nikhef.nl/projects/pub/Main/ProjectOverview/ProjectPlan_UpgradeVeloRFFoil.pdf[project plan]]
+
Link to project plans: [https://wiki.nikhef.nl/projects/pub/Main/ProjectOverview/ProjectPlan_UpgradeVeloRFFoil.pdf 2014]
 +
[http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/projects/VeloUpgradeRFBox/LHCb_UpgradeRFBox_2016_plan.pdf 2016 summary]
  
 
Rough timeline:
 
Rough timeline:
Line 17: Line 20:
 
*  Production 2017-2018
 
*  Production 2017-2018
 
*  Installation 2019
 
*  Installation 2019
 +
 +
See also this [http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/projects/VeloUpgradeRFBox/RFBoxTimeline20160908.pdf detailed timeline].
  
 
OPP reports:
 
OPP reports:
Line 39: Line 44:
 
== 3D model, drawings ==
 
== 3D model, drawings ==
  
The CATIA model and stp files for the RF box can be found on Martin's webpage:
+
The CATIA model and stp files for the RF box can be found here:
 +
 
 +
http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/upgrade/RFfoil/
 +
 
 +
Some /older/ drawings and pictures are on Martin's webpage:
  
 
http://www.nikhef.nl/~martind/Velo%20boxes/
 
http://www.nikhef.nl/~martind/Velo%20boxes/
Line 61: Line 70:
  
 
* [[File:VDL_Rapportage_lasproeven_aluminium.pdf]] Report by VDL (Dec 2014)
 
* [[File:VDL_Rapportage_lasproeven_aluminium.pdf]] Report by VDL (Dec 2014)
 +
 +
== Torlon coating ==
 +
 +
See [[https://wiki.nikhef.nl/lhcb/Upgrade/RFFoilTorlon]RFFoilTorlon]
  
 
== NEG coating ==
 
== NEG coating ==
Line 89: Line 102:
 
== Activities/milestones reached ==
 
== Activities/milestones reached ==
  
* 2015/10/29: Vacuum tests show the box is vacuum tight: https://webapps.nikhef.nl/elog/VELO_Upgrade_RFBox/8
+
* 2016/11/22: Filling box 3 with wax
 +
* 2016/10/01: Inside of box 3 (500 micron, full size) is finished
 +
* 2016/03/31: Box 2 milling is finished
 +
* 2015/10/29: Vacuum tests show the box is not vacuum tight: https://webapps.nikhef.nl/elog/VELO_Upgrade_RFBox/8
 
* 2015/10/01: Milling now completely finished!
 
* 2015/10/01: Milling now completely finished!
 
* 2015/09/17: Milling of outside is finished, apart from side that has wakefield connectors  
 
* 2015/09/17: Milling of outside is finished, apart from side that has wakefield connectors  

Latest revision as of 07:20, 7 June 2017

Communication

Planning

Link to project plans: 2014 2016 summary

Rough timeline:

  • R&D/prototyping 2014-2016
  • Production 2017-2018
  • Installation 2019

See also this detailed timeline.

OPP reports: [2014/02/04], [2014/04/15], [2014/07/04], [2014/09/16], [2014/10/21], [2014/12/02]

People

  • Willem Kuilman
  • Johan Kos
  • Berend Munneke
  • Krista de Roo
  • Erno Roeland
  • Martin Doets
  • Rob Walet
  • Tjeerd Ketel
  • Wouter Hulsbergen

3D model, drawings

The CATIA model and stp files for the RF box can be found here:

http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/upgrade/RFfoil/

Some /older/ drawings and pictures are on Martin's webpage:

http://www.nikhef.nl/~martind/Velo%20boxes/

Requirements

File:Requirements.pdf is the information given to external partners.

Information on materials

Machining

  • File:Mul Milling vs Turning.pdf is an old presentation by Frans Mul. The interesting conclusion is that 'turning' leads to a leaking foil, while 'milling' does not.

Fixing leaks

Torlon coating

See [[1]RFFoilTorlon]

NEG coating

Vacuum measurements

Presentations

This is a very small subset!

  • 2015/02/05: [[2] W. Hulsbergen, CERN RF box workshop]

Activities/milestones reached