Difference between revisions of "Upgrade/RFFoil"

From LHCb Wiki
Jump to navigation Jump to search
 
(34 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
* This wiki: https://wiki.nikhef.nl/lhcb/Upgrade/RFFoil
 
* This wiki: https://wiki.nikhef.nl/lhcb/Upgrade/RFFoil
 
* ELOG: https://webapps.nikhef.nl/elog/VELO_Upgrade_RFBox/
 
* ELOG: https://webapps.nikhef.nl/elog/VELO_Upgrade_RFBox/
 +
* Progress reports in MT meetings: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/minutes/
 +
* OPP reports: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/oppreports/VeloUpgradeRFBox/
 
* Massi's twiki on foil thinning: https://lbtwiki.cern.ch/bin/view/VELO/FoilThinning
 
* Massi's twiki on foil thinning: https://lbtwiki.cern.ch/bin/view/VELO/FoilThinning
 +
* photographs:
 +
** http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/production/UpgradeRFbox/
 +
** http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/production/UpgradeRFbox/Willem
 +
* RadiationTestsBirmingham
  
 
== Planning ==
 
== Planning ==
  
Link to project plan: [http://www.nikhef.nl/fileadmin/Doc/Docs\%20\&\%20pdf/OPP/Projectplannen/ProjectPlan_UpgradeVeloEnvelope.pdf[project plan]]
+
Link to project plans: [https://wiki.nikhef.nl/projects/pub/Main/ProjectOverview/ProjectPlan_UpgradeVeloRFFoil.pdf 2014]
 +
[http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/projects/VeloUpgradeRFBox/LHCb_UpgradeRFBox_2016_plan.pdf 2016 summary]
  
 
Rough timeline:
 
Rough timeline:
*  R&D/prototyping 2014-2015
+
*  R&D/prototyping 2014-2016
*  Production 2016-2017
+
*  Production 2017-2018
*  Installation 2018
+
*  Installation 2019
 +
 
 +
See also this [http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/projects/VeloUpgradeRFBox/RFBoxTimeline20160908.pdf detailed timeline].
 +
 
 +
OPP reports:
 +
[http://agenda.nikhef.nl/getFile.py/access?resId=0&materialId=0&contribId=2&sessionId=1&subContId=4&confId=2789[2014/02/04]],
 +
[http://agenda.nikhef.nl/getFile.py/access?resId=1&materialId=0&contribId=1&sessionId=0&subContId=2&confId=2835[2014/04/15]],
 +
[http://agenda.nikhef.nl/getFile.py/access?resId=1&materialId=0&contribId=1&sessionId=0&subContId=2&confId=2874[2014/07/04]],
 +
[http://agenda.nikhef.nl/getFile.py/access?resId=0&materialId=1&contribId=1&sessionId=0&subContId=2&confId=2837[2014/09/16]],
 +
[http://agenda.nikhef.nl/getFile.py/access?resId=0&materialId=0&contribId=2&sessionId=1&subContId=2&confId=2927[2014/10/21]],
 +
[http://agenda.nikhef.nl/getFile.py/access?resId=0&materialId=0&contribId=2&sessionId=1&subContId=2&confId=2971[2014/12/02]]
  
 
== People ==
 
== People ==
 
*  Willem Kuilman
 
*  Willem Kuilman
 +
*  Johan Kos
 
*  Berend Munneke
 
*  Berend Munneke
Johan Kos
+
Krista de Roo
 +
*  Erno Roeland
 
*  Martin Doets
 
*  Martin Doets
 
*  Rob Walet
 
*  Rob Walet
Line 23: Line 42:
 
*  Wouter Hulsbergen
 
*  Wouter Hulsbergen
  
== Drawings ==
+
== 3D model, drawings ==
  
The CATIA model and stp files for the RF box can be found on Martin's webpage:
+
The CATIA model and stp files for the RF box can be found here:
 +
 
 +
http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/upgrade/RFfoil/
 +
 
 +
Some /older/ drawings and pictures are on Martin's webpage:
  
 
http://www.nikhef.nl/~martind/Velo%20boxes/
 
http://www.nikhef.nl/~martind/Velo%20boxes/
Line 46: Line 69:
 
== Fixing leaks ==
 
== Fixing leaks ==
  
* [[VDL_Rapportage_lasproeven_aluminium.pdf]] Report by VDL (Dec 2014)
+
* [[File:VDL_Rapportage_lasproeven_aluminium.pdf]] Report by VDL (Dec 2014)
 +
 
 +
== Torlon coating ==
 +
 
 +
See [[https://wiki.nikhef.nl/lhcb/Upgrade/RFFoilTorlon]RFFoilTorlon]
  
 
== NEG coating ==
 
== NEG coating ==
Line 53: Line 80:
  
 
== Vacuum measurements ==
 
== Vacuum measurements ==
 +
 +
* integral tests at nikhef:
 +
** http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/test/secondary_foil/leaktest/
  
 
* Dye penetrant inspection
 
* Dye penetrant inspection
  * Information provided by Gonzalo ARNAU IZQUIERDO (materials engineer at EN/MME,CERN)
+
** Information provided by Gonzalo ARNAU IZQUIERDO (materials engineer at EN/MME,CERN)
    * https://www.nde-ed.org/EducationResources/CommunityCollege/PenetrantTest/PTMaterials/ptmaterials.htm
+
*** https://www.nde-ed.org/EducationResources/CommunityCollege/PenetrantTest/PTMaterials/ptmaterials.htm
    * http://en.wikipedia.org/wiki/Fluorescent_penetrant_inspection
+
*** http://en.wikipedia.org/wiki/Fluorescent_penetrant_inspection
  * Measurements were done by EN-MME Alexandre Gerardin:
+
** Measurements were done by EN-MME Alexandre Gerardin:
    * https://edms.cern.ch/document/1409244/
+
*** https://edms.cern.ch/document/1409244/
    * https://lbtwiki.cern.ch/pub/VELO/FoilThinning/Metallurgy_report_1409244.pdf  
+
*** https://lbtwiki.cern.ch/pub/VELO/FoilThinning/Metallurgy_report_1409244.pdf
  * CERN can do this for the 1m long box
 
  
 
== Presentations ==
 
== Presentations ==
  
* 2012/03/08: [[File:PhotosLeakMilledFoil_TjeerdKetel_20120308.pdf]]T. Ketel, SEM-EDS analysis of leak in VU-MC Box 1
+
This is a very small subset!
 +
 
 +
* 2015/02/05: [[https://indico.cern.ch/event/367805/session/0/contribution/2/material/slides/2.pdf] W. Hulsbergen, CERN RF box workshop]
  
== Activities ==
+
* 2012/03/08: [[File:PhotosLeakMilledFoil_TjeerdKetel_20120308.pdf]] T. Ketel, SEM-EDS analysis of leak in VU-MC Box 1
  
Starting October 2014 ...
+
== Activities/milestones reached ==
* 2014/10/02: Machining of 5 drums ready (4 of 250 mu thickness, 1 of 150 mu thickness, all without leaks)
+
 
 +
* 2016/11/22: Filling box 3 with wax
 +
* 2016/10/01: Inside of box 3 (500 micron, full size) is finished
 +
* 2016/03/31: Box 2 milling is finished
 +
* 2015/10/29: Vacuum tests show the box is not vacuum tight: https://webapps.nikhef.nl/elog/VELO_Upgrade_RFBox/8
 +
* 2015/10/01: Milling now completely finished!
 +
* 2015/09/17: Milling of outside is finished, apart from side that has wakefield connectors
 +
** photos taken by Tjeerd: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/minutes/2015/documents/photohb2.pdf
 +
* 2015/09/03: Mold positioned inside box and space filled with wax
 +
* 2015/08/20: Inside milling finished
 +
** metrology report: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/minutes/2015/documents/HalfboxA.pdf
 +
** photos taken by Tjeerd: http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/minutes/2015/documents/photohb.pdf
 +
* 2015/07/04: Pressure cycling tests of edged foil, see http://www.nikhef.nl/pub/experiments/bfys/lhcb/vertex/documents/minutes/2015/documents/cycletest4.pdf
 +
* 2015/06/11: Heating box (for heating foil/mold when filling with wax) finished and tested
 +
* 2015/04/16: Outside milled to +1 cm. This is how it will stay until inside is finished
 +
* 2015/03/19: Mold finished
 +
* 2014/12: Started milling of the mold
 
* 2014/10/20: Three drums with 0.1 micron holes sent to VDL (see ELOG)
 
* 2014/10/20: Three drums with 0.1 micron holes sent to VDL (see ELOG)
 
* 2014/10/20: Received 1kg of Field's metal and 1kg of cerrolow 136 from Lowden Limited
 
* 2014/10/20: Received 1kg of Field's metal and 1kg of cerrolow 136 from Lowden Limited
 
+
* 2014/10/02: Machining of 5 drums ready (4 of 250 mu thickness, 1 of 150 mu thickness, all without leaks)
== Action items ==
 
*   arrange a room for Willem (2014/09/18)
 

Latest revision as of 07:20, 7 June 2017

Communication

Planning

Link to project plans: 2014 2016 summary

Rough timeline:

  • R&D/prototyping 2014-2016
  • Production 2017-2018
  • Installation 2019

See also this detailed timeline.

OPP reports: [2014/02/04], [2014/04/15], [2014/07/04], [2014/09/16], [2014/10/21], [2014/12/02]

People

  • Willem Kuilman
  • Johan Kos
  • Berend Munneke
  • Krista de Roo
  • Erno Roeland
  • Martin Doets
  • Rob Walet
  • Tjeerd Ketel
  • Wouter Hulsbergen

3D model, drawings

The CATIA model and stp files for the RF box can be found here:

http://www.nikhef.nl/pub/departments/mt/projects/lhcb-vertex/upgrade/RFfoil/

Some /older/ drawings and pictures are on Martin's webpage:

http://www.nikhef.nl/~martind/Velo%20boxes/

Requirements

File:Requirements.pdf is the information given to external partners.

Information on materials

Machining

  • File:Mul Milling vs Turning.pdf is an old presentation by Frans Mul. The interesting conclusion is that 'turning' leads to a leaking foil, while 'milling' does not.

Fixing leaks

Torlon coating

See [[1]RFFoilTorlon]

NEG coating

Vacuum measurements

Presentations

This is a very small subset!

  • 2015/02/05: [[2] W. Hulsbergen, CERN RF box workshop]

Activities/milestones reached